BLD-Final | 7/13/2018 | 7/13/2018 | 7/13/2018 | P | PASS |
Dave Hannah
|
|
|
Zach Phone #: ###-####
|
BLD-Final | 7/5/2018 | 7/6/2018 | 7/6/2018 | A | PART |
Dave Hannah
|
|
|
Zak Phone #: ###-#### ok for temp occ needs city aproved plans and fire life safty final
|
FIRE-Final Inspection | 7/5/2018 | 7/5/2018 | 7/5/2018 | P | PART |
Jim Page
|
|
|
Partial final inspection for life fire safety TCO complete fire sprinkler inspection is complete, fire extinguishers are in place with current inspection tags, fire alarm permit is still in under review status due to changes to original layout (FIR18-00353, fire alarms are active, if city approved drawings do not match install then corrections will be required to match city approved drawings). When fire alarm permit is finaled then life fire safety can be finaled as well. 30 day TCO authorized for life fire safety.
|
BLD-Ceiling Grid Inspection | 5/21/2018 | 5/22/2018 | 5/22/2018 | A | PASS |
Dave Hannah
|
|
|
Zack Muller Phone #: ###-####
|
BLD-Framing/Rough-in | 3/27/2018 | 3/28/2018 | 3/28/2018 | A | PASS |
Dave Hannah
|
|
|
Zack Phone #: ###-####
|
Print Occupancy Form | | | 3/26/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 3/26/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/26/2018 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 2/26/2018 | 2/26/2018 | 3/8/2018 | | PASS |
Carl D Madsen
|
|
|
St. Lukes plan Mod
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/8/2018 | | DONE |
|
|
|
DO NOT REISSUE -- Need Revised cert of value from GC for plan modification (per arch. value is reduced)
|
Routing - MECHANICAL | 3/1/2018 | | 3/7/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 3/1/2018 | | 3/6/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing - FIRE | 3/1/2018 | 3/1/2018 | 3/5/2018 | | PASS |
Scott Arellano
|
|
|
Attached revised comments to case
|
Routing - PUBLIC WORKS | 3/1/2018 | | 3/1/2018 | | PASS |
Morgan Webb
|
|
|
NO NEW PLUMBING WITH PLAN MOD
|
Routing - PLUMBING | 3/1/2018 | | 3/1/2018 | | PASS |
Bill VanDegrift
|
|
|
Per plans and ISPC.
|
Plan Modification Accepted | | | 2/26/2018 | | DONE |
|
|
|
plan mod submitted approx 41 sheets-plan mod for the previous amount of tenant area amount of te for ste 105 was 7066 sf
the new area of tenant improvement is 2389 s f from thos modification. the amolunt of tenant improvement area has been reduces by (4677s f) assigned to CDM
|
Print Occupancy Form | | | 2/8/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/8/2018 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 12/13/2017 | 12/13/2017 | 12/14/2017 | | PASS |
Carl D Madsen
|
|
|
Need PW & Plumbing review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/14/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 12/14/2017 | | DONE |
|
|
|
met
|
Routing - PLUMBING | 12/13/2017 | | 12/13/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - Addressing | 12/13/2017 | | 12/13/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/13/2017 | | 12/13/2017 | | PASS |
Rachael Beierle
|
|
|
|
Route to Impact Fee Review | 12/9/2017 | 12/12/2017 | 12/11/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Permit Ready to Issue | | | 12/11/2017 | | DONE |
Christina Prado
|
|
|
Need:
Revised value - met
GC form - met
|
Plan assigned to (CDM) | 11/27/2017 | 11/27/2017 | 12/9/2017 | | PASS |
Carl D Madsen
|
|
|
WGCP L-2
|
Routing - PLAN CHECK | 11/27/2017 | | 12/9/2017 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 12/9/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/9/2017 | | DONE |
|
|
|
|
Routing - FIRE | 11/27/2017 | 11/27/2017 | 11/27/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to case
|
Routing - MECHANICAL | 11/27/2017 | | 11/27/2017 | | PASS |
Troy James
|
|
|
|
Application received | | | 11/17/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 17 2017 3:33PM
|