Second Notice | | 10/21/2018 | 10/18/2018 | | DONE |
|
|
|
This permit finaled on the web by Justin Dauby
|
First Notice | | 9/15/2018 | 10/11/2018 | | DONE |
|
|
|
mailed 10-12-18
|
BLD-Final | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | PASS |
Mike Jordan
|
|
|
Please call Justin 1/2-hour prior to inspection, thank you. Phone #: ###-#### Inspection requested via web by Justin Dauby. All issues have been resolved. Ok for perm occ.
|
FIRE-Final Inspection | 9/5/2018 | 9/5/2018 | 9/5/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Please call Justin 1/2-hour prior to inspection, thank you. Phone #: ###-#### Inspection requested via web by Justin Dauby
|
Permanent Occupancy | | | 9/5/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/20/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/20/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/20/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/20/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 8/17/2018 | | |
|
|
|
|
Plan assigned to (JAR) | 8/13/2018 | 8/13/2018 | 8/17/2018 | | DONE |
Julie Romig
|
|
|
08/17 - Plan Mod - Belmont Plaza Ace Hardware
|
Routing - PLAN CHECK | 8/13/2018 | | 8/17/2018 | | PASS |
Julie Romig
|
|
|
|
Permit Ready to Issue | | | 8/17/2018 | | DONE |
|
|
|
plan mnod please do not re issue
|
Plan Modification Accepted | | | 8/13/2018 | | DONE |
|
|
|
|
Temporary Occupancy | 7/25/2018 | 10/23/2018 | 7/25/2018 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd 60 day temp c of o-permit is in ISS status
|
CHANGE STATUS TO (ISS) | | | 7/25/2018 | | DONE |
|
|
|
permit is in ISS status but has a temp c of o good thru 9-23-2018
|
FIRE-Final Inspection | 6/8/2018 | 6/11/2018 | 6/11/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed for the "Lean To" area.
Justin--need 30 mins notice Phone #: ###-####
|
Print Occupancy Form | | | 5/14/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/14/2018 | | DONE |
|
|
|
no option to change status to TMP (temp occ issued 5/1/18)//leg
|
OVERRIDE | | | 5/11/2018 | | |
|
|
|
|
Routing - FIRE | 5/7/2018 | 5/7/2018 | 5/11/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
OUTDOOR FENCED AREA NOT BLOCKING FIRE LANE SEE SITE PLAN SUBMITTED
|
Plan assigned to (JAR) | 4/19/2018 | 4/19/2018 | 5/11/2018 | | DONE |
Julie Romig
|
|
|
**1st Rev Comp - 3rd Rec'd - Plan Mod - Belmont Plaza Ace Hardware TI
|
Permit Ready to Issue | | | 5/11/2018 | | DONE |
|
|
|
PLAN MOD
|
Routing - PLAN CHECK | 5/7/2018 | | 5/10/2018 | | PASS |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 5/1/2018 | | 5/3/2018 | | FAIL |
Julie Romig
|
|
|
Plan Mod Review 2
|
Routing - Design Review | 5/2/2018 | | 5/2/2018 | | PASS |
KayCee Babb
|
|
|
|
BLD-Final | 4/30/2018 | 5/1/2018 | 5/1/2018 | A | CANC |
Mike Jordan
|
|
|
30mins heads up- Justin Phone #: ###-####
|
BLD-Final | 5/1/2018 | 5/1/2018 | 5/1/2018 | P | PART |
Mike Jordan
|
|
|
ok for temp occ. untill new doors arrive and are installed. Temp. exiting plan ok.
|
FIRE-Final Inspection | 4/30/2018 | 5/1/2018 | 5/1/2018 | A | PART |
Troy Cobbley
|
|
|
A temporary is being given for the life safety until the exiting has been corrected. Plans are currently in review but a temporary exiting plan has been approved and implemented. Need the sidewall sprinkler heads installed when canopy is built.
Justin Phone #: ###-####
|
Temporary Occupancy | 5/1/2018 | 7/30/2018 | 5/1/2018 | | DONE |
Tisha Gallop
|
|
|
|
Routing - FIRE | 5/1/2018 | 5/1/2018 | 5/1/2018 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
5/08 Plan Mod Ace Hardware eplan
|
CHANGE STATUS TO (REV) | | | 5/1/2018 | | DONE |
|
|
|
change out of TMP to REV status per still in plan mod review
|
BLD-Conference | 4/27/2018 | 4/27/2018 | 4/27/2018 | P | DONE |
Mike Jordan
|
|
|
30 mins heads up- Justin Phone #: ###-####
|
FIRE-Conference | 4/27/2018 | 4/27/2018 | 4/27/2018 | P | DONE |
Troy Cobbley
|
|
|
Fire alarm permit needs finaled. The two west exit doors need resolved/approved. Electric doors need to open freely when locked. Provide single action lever hardware on interior doors. Provide the revised approved plans and institute any requirements shown on plans.
30 mins heads up- Justin Phone #: ###-####
|
Routing - PLAN CHECK | 4/23/2018 | | 4/26/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - MECHANICAL | 4/23/2018 | | 4/24/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 4/23/2018 | | 4/23/2018 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PUBLIC WORKS | 4/23/2018 | | 4/23/2018 | | PASS |
Morgan Webb
|
|
|
|
Plan Modification Accepted | | | 4/19/2018 | | DONE |
|
|
|
started workflow for plan modification to show work deleted from the project during construction and associated MPE engineering. Mezzanine offices were not constructed, west door was not relocated (existing door was replaced), partial demo exterior shed was not done, new lighting at shed.
|
FIRE-Conference | 3/31/2018 | 4/2/2018 | 4/3/2018 | P | DONE |
Troy Cobbley
|
|
|
I met with Justin and we discussed fire sprinkler issues.
Please call Justin 30-mins to 1-hour in advance, thank you. Phone #: ###-#### Inspection requested via web by Justin Dauby
|
FIRE-Conference | 3/15/2018 | 3/15/2018 | 3/15/2018 | A | DONE |
Troy Cobbley
|
|
|
Justin and I discussed the issue of incorrect pipe sizing in this tenant space as shown on FIR17-00593. The main shown as 4" is actually 3". As per discussion with Scott Arellano the future FIR permit for the dry system (or separate submittal) will need to address this issue with calculations that verify the system does meet minimum code requirments.
Please call Justin 1/2-hour prior to site visit, thank you. Phone #: ###-#### Inspection requested via web by Justin Dauby
|
FIRE-Conference | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | DONE |
Troy Cobbley
|
|
|
We went over sprinkler issues such as the coverage under the stair and at the entry vestible. We discussed the west side exiting that is being resubmitted and per the review comments a manual fire alarm system is required as per the review comments.
30 mins heads up- Justin Phone #: ###-####
|
FIRE-Conference | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | DONE |
Troy Cobbley
|
|
|
We went over issues with lack of sprinkler coverage which was agreed to be taken care of with the vanilla finish permit and the need for a possible plan modification for the west exit/canopy exiting system.
|
Permit Ready to Issue | | | 12/18/2017 | | DONE |
|
|
|
Need
GC Form
Revised Cert of Value
|
Print Occupancy Form | | | 12/18/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/18/2017 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 11/22/2017 | 11/22/2017 | 12/15/2017 | | DONE |
Julie Romig
|
|
|
*1st Rev Comp - 2nd Rec'd 12/08 - L2 Ace Hardware ePlan
|
Routing - PLAN CHECK | 12/8/2017 | | 12/15/2017 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/15/2017 | | DONE |
|
|
|
|
Route to Impact Fee Review | 12/6/2017 | 12/9/2017 | 12/7/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing Off Site - STRUCTURAL | 11/22/2017 | | 12/6/2017 | | PASS |
Julie Romig
|
|
|
|
Routing - Design Review | 11/22/2017 | | 12/6/2017 | | PASS |
KayCee Babb
|
|
|
|
Routing - PLAN CHECK | 11/22/2017 | | 12/6/2017 | | FAIL |
Julie Romig
|
|
|
Corrections required per ePlanReview
|
1st review completed | | | 12/6/2017 | | FAIL |
Julie Romig
|
|
|
|
Routing PW Environmental | 11/24/2017 | | 12/5/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - PLANNING | 11/27/2017 | | 11/27/2017 | | PASS |
KayCee Babb
|
|
|
|
Routing - Erosion and Sediment | 11/22/2017 | | 11/27/2017 | | PASS |
Michael Zawacki
|
|
|
TI. Minor exterior work, no new disturbance. If stucco or paint used they will need to be properly disposed.
|
Routing - PLUMBING | 11/22/2017 | | 11/27/2017 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC. Tempering device required on lavs.
|
Routing - FIRE | 11/22/2017 | 11/22/2017 | 11/24/2017 | | PASS |
Scott Arellano
|
|
|
Attached Fire Code comments to plans.
|
Routing - Addressing | 11/22/2017 | | 11/24/2017 | | PASS |
Laura Hunter
|
|
|
Corrected address to 10499 W Fairview Ave
|
Routing - PUBLIC WORKS | 11/22/2017 | | 11/24/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - MECHANICAL | 11/22/2017 | | 11/24/2017 | | PASS |
Troy James
|
|
|
|
Intake Approval | | | 11/22/2017 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 11/17/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 17 2017 4:04PM
|