Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-04218
StatusFinaled
Name DAUBY CONSTRUCTION MGMT
Site Address 10499 W FAIRVIEW AVE
Project NameAce Hardware Tenant Improvemen
Customer Number 
ePlanReviewYes
Description
(BELMONT PLAZA – ACE HARDWARE) //Plan Modification 08/17/18// TO USE EXISTING 60" GATE WITH PANIC HARDWARE AS EXIT FROM FENCED STORAGE YARD//Plan Modification 05/10/18// TO USE MEZZANINE AS STORAGE ONLY, REVISIONS TO WEST DOOR LOCATIONS, SHED AND FENCING ON WEST SIDE OF BUILDING TO REMAIN FOR RETAIL USE WITH REQURIED EXIT SIGNAGE, LIGHTING, AND HARDWARE. **Permit to remodel an existing 17,744 sq ft retail tenant space within the existing Belmont Plaza. The building was previously occupied by K-Mart and subdivided into smaller tenant spaces under shell/core permit BLD17-01449. Work to include: demo of interior non-structural partitions; new interior non-bearing walls; new entry vestibule doors; new exterior doors; new break room plumbing; new lighting and power; mechanical; and new interior finishes in compliance with Ch. 8 of the 2012 IBC. Special inspections required per attached Form 310. Separate racking permit required for any racking (including outdoor) over 8’-0” tall. The fire sprinkler system is used for unlimited area of the building AND to allow 3-hr fire barrier walls in lieu of fire walls. The fire sprinkler system is NOT allowed to be used for building area increase for A Occupancies. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 10/21/201810/18/2018 DONE
This permit finaled on the web by Justin Dauby
First Notice 9/15/201810/11/2018 DONE
mailed 10-12-18
BLD-Final9/5/20189/5/20189/5/2018PPASS
DetailsMike Jordan
Please call Justin 1/2-hour prior to inspection, thank you. Phone #: ###-#### Inspection requested via web by Justin Dauby. All issues have been resolved. Ok for perm occ.
FIRE-Final Inspection9/5/20189/5/20189/5/2018APASS
DetailsTroy Cobbley
Life safety passed.

Please call Justin 1/2-hour prior to inspection, thank you. Phone #: ###-#### Inspection requested via web by Justin Dauby
Permanent Occupancy  9/5/2018 DONE
Print Occupancy Form  8/20/2018 DONE
Print Occupancy Form  8/20/2018 DONE
Print Occupancy Form  8/20/2018 DONE
CHANGE STATUS TO (ISS)  8/20/2018 DONE
OVERRIDE  8/17/2018  
Plan assigned to (JAR)8/13/20188/13/20188/17/2018 DONE
DetailsJulie Romig
08/17 - Plan Mod - Belmont Plaza Ace Hardware
Routing - PLAN CHECK8/13/2018 8/17/2018 PASS
DetailsJulie Romig
Permit Ready to Issue  8/17/2018 DONE
plan mnod please do not re issue
Plan Modification Accepted  8/13/2018 DONE
Temporary Occupancy7/25/201810/23/20187/25/2018 DONE
DetailsCandy A. Nichols
Jason Blais ok'd 60 day temp c of o-permit is in ISS status
CHANGE STATUS TO (ISS)  7/25/2018 DONE
permit is in ISS status but has a temp c of o good thru 9-23-2018
FIRE-Final Inspection6/8/20186/11/20186/11/2018APASS
DetailsTroy Cobbley
Life safety passed for the "Lean To" area.

Justin--need 30 mins notice Phone #: ###-####
Print Occupancy Form  5/14/2018 DONE
CHANGE STATUS TO (ISS)  5/14/2018 DONE
no option to change status to TMP (temp occ issued 5/1/18)//leg
OVERRIDE  5/11/2018  
Routing - FIRE5/7/20185/7/20185/11/2018 PASS
DetailsAdele J Schaffeld-Griffin
OUTDOOR FENCED AREA NOT BLOCKING FIRE LANE SEE SITE PLAN SUBMITTED
Plan assigned to (JAR)4/19/20184/19/20185/11/2018 DONE
DetailsJulie Romig
**1st Rev Comp - 3rd Rec'd - Plan Mod - Belmont Plaza Ace Hardware TI
Permit Ready to Issue  5/11/2018 DONE
PLAN MOD
Routing - PLAN CHECK5/7/2018 5/10/2018 PASS
DetailsJulie Romig
Routing - PLAN CHECK5/1/2018 5/3/2018 FAIL
DetailsJulie Romig
Plan Mod Review 2
Routing - Design Review5/2/2018 5/2/2018 PASS
DetailsKayCee Babb
BLD-Final4/30/20185/1/20185/1/2018ACANC
DetailsMike Jordan
30mins heads up- Justin Phone #: ###-####
BLD-Final5/1/20185/1/20185/1/2018PPART
DetailsMike Jordan
ok for temp occ. untill new doors arrive and are installed. Temp. exiting plan ok.
FIRE-Final Inspection4/30/20185/1/20185/1/2018APART
DetailsTroy Cobbley
A temporary is being given for the life safety until the exiting has been corrected. Plans are currently in review but a temporary exiting plan has been approved and implemented. Need the sidewall sprinkler heads installed when canopy is built.

Justin Phone #: ###-####
Temporary Occupancy5/1/20187/30/20185/1/2018 DONE
DetailsTisha Gallop
Routing - FIRE5/1/20185/1/20185/1/2018 FAIL
DetailsAdele J Schaffeld-Griffin
5/08 Plan Mod Ace Hardware eplan
CHANGE STATUS TO (REV)  5/1/2018 DONE
change out of TMP to REV status per still in plan mod review
BLD-Conference4/27/20184/27/20184/27/2018PDONE
DetailsMike Jordan
30 mins heads up- Justin Phone #: ###-####
FIRE-Conference4/27/20184/27/20184/27/2018PDONE
DetailsTroy Cobbley
Fire alarm permit needs finaled.
The two west exit doors need resolved/approved.
Electric doors need to open freely when locked.
Provide single action lever hardware on interior doors.
Provide the revised approved plans and institute any requirements shown on plans.



30 mins heads up- Justin Phone #: ###-####
Routing - PLAN CHECK4/23/2018 4/26/2018 FAIL
DetailsJulie Romig
Routing - MECHANICAL4/23/2018 4/24/2018 PASS
DetailsTroy James
Routing - PLUMBING4/23/2018 4/23/2018 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PUBLIC WORKS4/23/2018 4/23/2018 PASS
DetailsMorgan Webb
Plan Modification Accepted  4/19/2018 DONE
started workflow for plan modification to show work deleted from the project during construction and associated MPE engineering. Mezzanine offices were not constructed, west door was not relocated (existing door was replaced), partial demo exterior shed was not done, new lighting at shed.
FIRE-Conference3/31/20184/2/20184/3/2018PDONE
DetailsTroy Cobbley
I met with Justin and we discussed fire sprinkler issues.

Please call Justin 30-mins to 1-hour in advance, thank you. Phone #: ###-#### Inspection requested via web by Justin Dauby
FIRE-Conference3/15/20183/15/20183/15/2018ADONE
DetailsTroy Cobbley
Justin and I discussed the issue of incorrect pipe sizing in this tenant space as shown on FIR17-00593. The main shown as 4" is actually 3". As per discussion with Scott Arellano the future FIR permit for the dry system (or separate submittal) will need to address this issue with calculations that verify the system does meet minimum code requirments.

Please call Justin 1/2-hour prior to site visit, thank you. Phone #: ###-#### Inspection requested via web by Justin Dauby
FIRE-Conference3/7/20183/7/20183/7/2018PDONE
DetailsTroy Cobbley
We went over sprinkler issues such as the coverage under the stair and at the entry vestible. We discussed the west side exiting that is being resubmitted and per the review comments a manual fire alarm system is required as per the review comments.


30 mins heads up- Justin Phone #: ###-####
FIRE-Conference2/28/20183/1/20183/1/2018ADONE
DetailsTroy Cobbley
We went over issues with lack of sprinkler coverage which was agreed to be taken care of with the vanilla finish permit and the need for a possible plan modification for the west exit/canopy exiting system.
Permit Ready to Issue  12/18/2017 DONE
Need
GC Form
Revised Cert of Value
Print Occupancy Form  12/18/2017 DONE
Issue PAID IN FULL permit  12/18/2017 DONE
Plan assigned to (JAR)11/22/201711/22/201712/15/2017 DONE
DetailsJulie Romig
*1st Rev Comp - 2nd Rec'd 12/08 - L2 Ace Hardware ePlan
Routing - PLAN CHECK12/8/2017 12/15/2017 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  12/15/2017 DONE
Route to Impact Fee Review12/6/201712/9/201712/7/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing Off Site - STRUCTURAL11/22/2017 12/6/2017 PASS
DetailsJulie Romig
Routing - Design Review11/22/2017 12/6/2017 PASS
DetailsKayCee Babb
Routing - PLAN CHECK11/22/2017 12/6/2017 FAIL
DetailsJulie Romig
Corrections required per ePlanReview
1st review completed  12/6/2017 FAIL
DetailsJulie Romig
Routing PW Environmental11/24/2017 12/5/2017 PASS
DetailsRick Christenson
Routing - PLANNING11/27/2017 11/27/2017 PASS
DetailsKayCee Babb
Routing - Erosion and Sediment11/22/2017 11/27/2017 PASS
DetailsMichael Zawacki
TI. Minor exterior work, no new disturbance. If stucco or paint used they will need to be properly disposed.
Routing - PLUMBING11/22/2017 11/27/2017 PASS
DetailsDaryl Spivey
Per plan and ISPC. Tempering device required on lavs.
Routing - FIRE11/22/201711/22/201711/24/2017 PASS
DetailsScott Arellano
Attached Fire Code comments to plans.
Routing - Addressing11/22/2017 11/24/2017 PASS
DetailsLaura Hunter
Corrected address to 10499 W Fairview Ave
Routing - PUBLIC WORKS11/22/2017 11/24/2017 PASS
DetailsRachael Beierle
Routing - MECHANICAL11/22/2017 11/24/2017 PASS
DetailsTroy James
Intake Approval  11/22/2017 PASS
DetailsJavier Guzman
Application received  11/17/2017 DONE
Application submitted via PDS Online on Nov 17 2017 4:04PM