Permit Information
Permit NumberBLD17-04228
StatusFinaled
Name LAUREN KING
Site Address 266 S COLE RD
Project NameOxidize Hair Co - Occupancy
Customer Number 
ePlanReviewNo
Description
(OXIDIZE HAIR COMPANY – BEAUTY SALON – OCCUPANCY – FRANKLIN BUSINESS PARK – BUILDING #7) This building does not have a fire sprinkler system. Application for inspection to determine the requirements for the issuance of a Certificate of Occupancy for an existing 727 square foot tenant space to be used for as a hair salon. Egress is directly to the outside at grade. No new work is authorized under this permit except for minor work that may be needed to correct noncompliant conditions that may exist. Separate permits are required for plumbing, mechanical, and electrical work. Based on a floor area of 525 square feet, at least 315 cfm of exhaust to the outside is required for a hair salon. A source of make-up air is also required. Painting, carpeting, counter tops, shelves, and similar finish work are not required to have a building permit. Compliance is required with the items listed in the plan review report under Referenced Code Sections because noncompliance with these items is believed to constitute a distinct hazard to life and safety or to discriminate against the disabled. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/28/20171/8/20181/8/2018APASS
DetailsMike Jordan
Will or Lauren Phone #: ###-####
Permanent Occupancy  1/8/2018 DONE
BLD-Final1/3/20181/3/20181/3/2018PPART
DetailsMike Jordan
Will or Lauren Phone #: ###-####. Needs to pull electrical permit and get electrical final. Will be ok for perm occ. once electrical signs off.
FIRE-Final Inspection12/28/20171/3/20181/3/2018APASS
DetailsTroy Cobbley
Life safety passed

Will or Lauren Phone #: ###-####
Plan assigned to (CJW)11/20/201711/20/201711/21/2017 PASS
DetailsCarl Westfall
x (Nov 27 - 5 days) Occupancy
Routing - PLAN CHECK11/20/2017 11/21/2017 PASS
DetailsCarl Westfall
1st review completed  11/21/2017 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/21/2017 DONE
Permit Ready to Issue  11/21/2017 DONE
Print Occupancy Form  11/21/2017 DONE
Telephone call  11/21/2017 DONE
Spoke with Lauren informing her that this permit is ready and whomever she speaks with will go over the required inspections
Issue PAID IN FULL permit  11/21/2017 DONE
Routing - PUBLIC WORKS11/20/2017 11/20/2017 PASS
DetailsRachael Beierle
Routing - Addressing11/20/2017 11/20/2017 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  11/20/2017 DONE
Recd Pcfee & Taken To Pln CK  11/20/2017 DONE
Intake Approval  11/20/2017 PASS
First Notice 1/18/2018   
Application received 11/20/2017