Letter of compliance/Occupancy | | | 1/4/2019 | | DONE |
|
|
|
no perm c of o can be given until we get approval from PW (JCT)
|
Letter of compliance/Occupancy | | | 1/4/2019 | | DONE |
|
|
|
no Permit C of O until approval from PW has been given
|
BLD-Final | 12/17/2018 | 12/18/2018 | 12/18/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell
|
DOC - Permit Finaled | 12/18/2018 | 12/18/2018 | 12/18/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 11/20/2018 | 11/20/2018 | 11/20/2018 | P | NR |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell Need ACHD and Mech.
|
BLD-Energy code compliance | 5/31/2018 | 6/1/2018 | 6/1/2018 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell
|
BLD-Energy code compliance | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell
|
BLD-Energy code compliance | 5/29/2018 | 5/31/2018 | 5/31/2018 | A | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell,, c/n not completed
|
BLD-Energy code compliance | 5/30/2018 | 5/31/2018 | 5/31/2018 | A | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell,, c/n not completed
|
BLD-Energy code compliance | 5/29/2018 | 5/30/2018 | 5/30/2018 | A | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell
|
BLD-Energy code compliance | 5/29/2018 | 5/29/2018 | 5/29/2018 | P | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell,, correction notice not completed
|
BLD-Framing/Rough-in | 5/23/2018 | 5/23/2018 | 5/23/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell See C/N
|
BLD-Wall Bracing | 5/10/2018 | 5/10/2018 | 5/11/2018 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell
|
BLD-Wall Bracing | 4/17/2018 | 4/17/2018 | 4/17/2018 | P | PART |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell 2nd flr 1 hr walls
|
BLD-Wall Bracing | 4/4/2018 | 4/4/2018 | 4/4/2018 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell,, main level firewall ok
|
BLD-Footing | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | PASS |
Dave Hannah
|
|
|
Huron Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/2/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/2/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 2/1/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 11/21/2017 | 11/21/2017 | 2/1/2018 | | DONE |
Brian McGowan
|
|
|
1st review complete -12/8 Townhome L2 paper
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/1/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/1/2018 | | DONE |
|
|
|
met
|
Routing - MECHANICAL | 1/29/2018 | | 2/1/2018 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 1/29/2018 | | 1/31/2018 | | PASS |
Sarah Schafer
|
|
|
|
Routing - PLAN CHECK | 1/29/2018 | | 1/30/2018 | | PASS |
Brian McGowan
|
|
|
|
Routing - PLANNING | 1/30/2018 | | 1/30/2018 | | PASS |
Brent Moore
|
|
|
Updated site plan approved 1/30/18.
|
1st review completed | | | 12/6/2017 | | FAIL |
Brian McGowan
|
|
|
Engineering as individual units required.
|
Routing - PLAN CHECK | | | 12/6/2017 | | FAIL |
Brian McGowan
|
|
|
Engineering as individual units required.
|
Routing - MECHANICAL | 11/24/2017 | | 11/24/2017 | | FAIL |
Troy James
|
|
|
|
Routing - PLANNING | 11/22/2017 | | 11/24/2017 | | PASS |
Brent Moore
|
|
|
PUD16-00031/DRH17-00039
|
Routing - Design Review | 11/24/2017 | | 11/24/2017 | | FAIL |
Sarah Schafer
|
|
|
The plans failed per the requirements of DRH17-00038. The side entry access to the unit adjacent to the parking area was not provided and the landscape plan shown on the cover sheet was not a detailed landscape plan nor did it match the plan in the DR file. Notes were made to the requirement for the entry and canopy on sheets A0.1, A03, A2.1 and A3.
|
Route to Impact Fee Review | 11/21/2017 | 11/24/2017 | 11/22/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 11/21/2017 | | 11/22/2017 | | PASS |
Laura Hunter
|
|
|
Corrected post type from Dr to Ln
|
Routing - PUBLIC WORKS | | | 11/22/2017 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/21/2017 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/21/2017 | | DONE |
|
|
|
|
Intake Approval | | | 11/21/2017 | | PASS |
|
|
|
|
Application received | | 11/20/2017 | | | |
|
|
|
|