PubWorks Occupancy Approval | 1/8/2019 | 1/8/2019 | 1/8/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
Inspection Record Card- Bld | | | 1/8/2019 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 1/8/2019 | | DONE |
|
|
|
as per Jason Taylor-ok with PW to get permit C of O
|
BLD-Final | 12/17/2018 | 12/18/2018 | 12/18/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell
|
DOC - Permit Finaled | 12/18/2018 | 12/18/2018 | 12/18/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 8/20/2018 | 8/20/2018 | 8/20/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell
|
BLD-Framing/Rough-in | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell
|
BLD-Framing/Rough-in | 8/6/2018 | 8/6/2018 | 8/6/2018 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell
|
BLD-Wall Bracing | 7/18/2018 | 7/18/2018 | 7/18/2018 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell
|
BLD-Wall Bracing | 6/12/2018 | 6/12/2018 | 6/12/2018 | P | PASS |
Tony Young
|
|
|
second story firewall // Nate Phone #: ###-####
|
BLD-Wall Bracing | 5/31/2018 | 5/31/2018 | 5/31/2018 | A | PASS |
Tony Young
|
|
|
Drywall Phone #: ###-#### Inspection requested via web by Nate Mitchell
|
BLD-Foundation | 1/23/2018 | 1/23/2018 | 1/23/2018 | P | PART |
Tony Young
|
|
|
Nate Phone #: ###-####
|
BLD-Footing | 1/22/2018 | 1/22/2018 | 1/22/2018 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Mitchell
|
Issue PAID IN FULL permit | | | 1/3/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/3/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 12/29/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 11/21/2017 | 11/21/2017 | 12/29/2017 | | DONE |
Brian McGowan
|
|
|
1st review complete –12/8 Townhome L2 paper
|
Routing - PLAN CHECK | 12/29/2017 | | 12/29/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/29/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 12/29/2017 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 12/19/2017 | | 12/27/2017 | | FAIL |
Brian McGowan
|
|
|
Structure did not match Architectural
|
Routing - Design Review | 12/19/2017 | | 12/20/2017 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH17-00039.
|
Routing - MECHANICAL | 12/19/2017 | | 12/19/2017 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 12/6/2017 | | FAIL |
Brian McGowan
|
|
|
Engineering as individual units required.
|
Routing - PLAN CHECK | | | 12/6/2017 | | FAIL |
Brian McGowan
|
|
|
Engineering as individual units required.
|
Routing - MECHANICAL | | | 11/24/2017 | | FAIL |
Troy James
|
|
|
|
Routing - PLANNING | 11/22/2017 | | 11/24/2017 | | PASS |
Jeff Lowe
|
|
|
PUD16-00031/DRH17-00039
|
Routing - Design Review | 11/24/2017 | | 11/24/2017 | | FAIL |
Sarah Schafer
|
|
|
The plans failed per the requirements of DRH17-00038. The side entry access to the unit adjacent to the parking area was not provided and the landscape plan shown on the cover sheet was not a detailed landscape plan nor did it match the plan in the DR file. Notes were made to the requirement for the entry and canopy on sheets A0.1, A03, A2.1 and A3.
|
Route to Impact Fee Review | 11/21/2017 | 11/24/2017 | 11/22/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 11/21/2017 | | 11/22/2017 | | PASS |
Laura Hunter
|
|
|
Corrected post type from Dr to Ln
|
Routing - PUBLIC WORKS | 11/21/2017 | | 11/22/2017 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/21/2017 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/21/2017 | | DONE |
|
|
|
|
Intake Approval | | | 11/21/2017 | | PASS |
|
|
|
|
Application received | | 11/20/2017 | | | |
|
|
|
|