Third Notice | | 3/12/2019 | 3/8/2019 | | DONE |
|
|
|
This permit finaled on the web by derek cooper
|
Third Notice | | 2/11/2019 | 3/7/2019 | | DONE |
|
|
|
Sent email to Jack (jack@rrccontractors) informing him that RRC Contractors will be put on hold if final values are not sent in by 5pm 3/8/19. Have been trying to get since 8/7/18
|
Third Notice | | 1/13/2019 | 2/6/2019 | | DONE |
|
|
|
sent email to Jack (jack@rrccontractors.com) 2-6-19
|
Third Notice | | 12/18/2018 | 1/8/2019 | | DONE |
|
|
|
Maild 1-11-19 with 3rd and final follow up letter
|
Third Follow up | | | 1/8/2019 | | DONE |
|
|
|
final letter
|
Third Notice | | 11/18/2018 | 12/13/2018 | | DONE |
|
|
|
mailed 12-14 with second follow up
|
Second Follow up | | | 12/13/2018 | | DONE |
|
|
|
|
Third Notice | | 10/17/2018 | 11/13/2018 | | DONE |
|
|
|
mailed 11-14
|
First Follow up | | | 11/13/2018 | | DONE |
|
|
|
|
Third Notice | | 9/15/2018 | 10/12/2018 | | DONE |
|
|
|
mailed 10-15-18
|
Second Notice | | 8/17/2018 | 9/10/2018 | | DONE |
|
|
|
mailed 9-11-18
|
First Notice | | 7/16/2018 | 8/7/2018 | | DONE |
|
|
|
mailed 8-10-18
|
Permanent Occupancy | | | 7/6/2018 | | DONE |
|
|
|
|
BLD-Final | 6/19/2018 | 6/20/2018 | 6/20/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Don Walker. Ok for temp occ. Will be ok for perm occ. once electrical signs perm.
|
FIRE-Final Inspection | 6/19/2018 | 6/20/2018 | 6/20/2018 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
Don Phone #: ###-####
|
BLD-Final | 6/13/2018 | 6/14/2018 | 6/14/2018 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Don Walker
|
BLD-Conference | 6/14/2018 | 6/14/2018 | 6/14/2018 | A | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Don Walker. Walk through prior to final. Needs to provide ADA portion of counter top at wine bar. Provide ADA bathroom signs.
|
FIRE-Final Inspection | 6/13/2018 | 6/14/2018 | 6/14/2018 | A | FAIL |
Troy Cobbley
|
|
|
Provide exit discharge lights per the approved plans. Mount the two fire extinguishers in the DIning Area and provide an additional one in the back corridor. Provide the two occupant load signs.
Phone #: ###-#### Inspection requested via web by Don Walker
|
FIRE-Conference | 5/23/2018 | 5/23/2018 | 5/23/2018 | P | DONE |
Troy Cobbley
|
|
|
The project superintendant and I went over the door hardware requirements and exit path requirements.
|
BLD-Ceiling Grid Inspection | 4/17/2018 | 4/18/2018 | 4/18/2018 | P | PASS |
Mike Jordan
|
|
|
Please call when headed our way. Phone #: ###-#### Inspection requested via web by Don Walker
|
BLD-Ceiling Grid Inspection | 3/22/2018 | 3/22/2018 | 3/22/2018 | P | PART |
Brandon Shaw
|
|
|
Inspection in hard lid ares in bathrooms, retail 1 and retail 2- OK to cover
|
BLD-Wall cover | 3/6/2018 | 3/7/2018 | 3/7/2018 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Don Walker
|
BLD-Framing/Rough-in | 3/7/2018 | 3/7/2018 | 3/7/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Don Walker. Interior steel stud framed walls and soffits only.
|
Issue PAID IN FULL permit | | | 1/12/2018 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 11/22/2017 | 11/22/2017 | 1/10/2018 | | DONE |
Julie Romig
|
|
|
**1st Rev Comp - 2nd Rec'd - Paper - L3 Chow Public Market
|
Pending Assignment by CDM | 11/21/2017 | | 1/10/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 1/10/2018 | | 1/10/2018 | | PASS |
Julie Romig
|
|
|
|
Case Summary (BLD) | | | 1/10/2018 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/10/2018 | | DONE |
|
|
|
All Met
|
Print Occupancy Form | | | 1/10/2018 | | DONE |
|
|
|
|
Routing - FIRE | 1/9/2018 | 1/9/2018 | 1/9/2018 | | PASS |
Erika Akin
|
|
|
Attached comments and redlined plan sheet I-4.0
|
Route to Impact Fee Review | 1/4/2018 | 1/7/2018 | 1/5/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan resubmittals received | | | 1/5/2018 | | DONE |
Christina Prado
|
|
|
Received three sest of plans sheets marked I-1.0, I-5.0, I-5.1, I-5.3, I-5.4 and 5 sets of sheet I-4.0; Plans stamped and take JAR for review
|
Routing Off Site - STRUCTURAL | 12/29/2017 | | 1/5/2018 | | PASS |
Julie Romig
|
|
|
|
Routing - FIRE | 1/3/2018 | 1/3/2018 | 1/4/2018 | | FAIL |
Scott Arellano
|
|
|
Attached comments to plans and case. Emailed the architect.
|
1st review completed | | | 1/4/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - MECHANICAL | 1/3/2018 | | 1/3/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 11/22/2017 | | 1/3/2018 | | FAIL |
Julie Romig
|
|
|
|
Plan Modification Accepted | | | 12/29/2017 | | DONE |
Christina Prado
|
|
|
Received third set of resubmittals and two additional stamped S1.0 drawings
|
Plan resubmittals received | | | 12/28/2017 | | DONE |
|
|
|
Two copies of I1.0 floor plan, I 2.0 reflected ceileing plan and S1.0 structural details. stamped and taken to julie R
|
Routing Off Site - STRUCTURAL | 12/14/2017 | | 12/18/2017 | | FAIL |
Julie Romig
|
|
|
2nd Review KPFF - new Structural Calcs received
|
Telephone call | | | 12/14/2017 | | DONE |
|
|
|
called courier for pick up of resub calcs to outside engineering
|
Plan resubmittals received | | | 12/13/2017 | | DONE |
|
|
|
resubmittals recieved 2 sets of struc calcs-took to Julie R
|
Routing Off Site - STRUCTURAL | 11/22/2017 | | 12/5/2017 | | PASS |
Julie Romig
|
|
|
No comments per structural email
|
Routing - PLUMBING | 11/30/2017 | | 12/5/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
additional cross connection protection may be required
|
Routing - MECHANICAL | 11/29/2017 | | 11/30/2017 | | FAIL |
Troy James
|
|
|
Need kitchen equipment plan and schedule
|
Routing - Erosion and Sediment | 11/28/2017 | | 11/29/2017 | | PASS |
Andy J. Long
|
|
|
No exterior disturbance or excavation described in scope. No ESC required. if found to be messy during construction will require permit.
|
Routing - PUBLIC WORKS | 11/27/2017 | | 11/28/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Environmental | 11/27/2017 | | 11/28/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - PLANNING | 11/28/2017 | | 11/28/2017 | | PASS |
Katelyn Menuge
|
|
|
Design Review CZC17-00294
|
Routing - Addressing | 11/22/2017 | | 11/27/2017 | | PASS |
Doug Chausow
|
|
|
|
Plan resubmittals received | | | 11/27/2017 | | DONE |
|
|
|
One copy G-0.0, I-0.1,I-1.0,I-2.0,I-3.0,I-4.0, I-5.0,I-5.1, I-5.2,I-5.3,I-5.4,I-6.0,1, M1.0, M1.1, M2.0, M3.0, M4.0, M5.0, M6.0,M7.0, E0.0, E2.0D, E2.0F, E2.0L, E2.0MP, E2.0P, E2.0S, E2.1, E3.0, E3.1, E4.0, E4.1, E4.2, S-1.0 AND A COPY OF CALCULATIONS taken to Carl M
|
Plans ACCEPTED BY PLAN TECH | | | 11/21/2017 | | DONE |
|
|
|
|
Intake Approval | | | 11/21/2017 | | PASS |
Julie Romig
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/21/2017 | | DONE |
|
|
|
|
Application received | | 11/21/2017 | | | |
|
|
|
|