Permit Information
Permit NumberBLD17-04274
StatusFinaled
Name RRC CONTRACTORS
Site Address 7609 W OVERLAND RD
Project NameChow Public Market
Customer Number 
ePlanReviewNo
Description
(CHOW PUBLIC MARKET – BOISE SPECTRUM – BUILDING C) **This building is fire sprinklered for building area increase and fire area. Permit to combine units 130, 140, 150, 160 to create a 7,200 sq ft open food court with 4 associated kitchen areas and retail sales area. Work to include: new interior nonbearing partitions; new exterior windows and overhead doors; relocated doors; new commercial kitchens; new plumbing, electrical, and mechanical; and new finishes to be in compliance with Ch. 8 of the 2012 IBC. Work is required to comply with the approved drawings, plan review report, and with all applicable codes and ordinances. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 3/12/20193/8/2019 DONE
This permit finaled on the web by derek cooper
Third Notice 2/11/20193/7/2019 DONE
Sent email to Jack (jack@rrccontractors) informing him that RRC Contractors will be put on hold if final values are not sent in by 5pm 3/8/19. Have been trying to get since 8/7/18
Third Notice 1/13/20192/6/2019 DONE
sent email to Jack (jack@rrccontractors.com) 2-6-19
Third Notice 12/18/20181/8/2019 DONE
Maild 1-11-19 with 3rd and final follow up letter
Third Follow up  1/8/2019 DONE
final letter
Third Notice 11/18/201812/13/2018 DONE
mailed 12-14 with second follow up
Second Follow up  12/13/2018 DONE
Third Notice 10/17/201811/13/2018 DONE
mailed 11-14
First Follow up  11/13/2018 DONE
Third Notice 9/15/201810/12/2018 DONE
mailed 10-15-18
Second Notice 8/17/20189/10/2018 DONE
mailed 9-11-18
First Notice 7/16/20188/7/2018 DONE
mailed 8-10-18
Permanent Occupancy  7/6/2018 DONE
BLD-Final6/19/20186/20/20186/20/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Don Walker. Ok for temp occ. Will be ok for perm occ. once electrical signs perm.
FIRE-Final Inspection6/19/20186/20/20186/20/2018APASS
DetailsTroy Cobbley
life safety passed

Don Phone #: ###-####
BLD-Final6/13/20186/14/20186/14/2018ACANC
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Don Walker
BLD-Conference6/14/20186/14/20186/14/2018ADONE
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Don Walker. Walk through prior to final. Needs to provide ADA portion of counter top at wine bar. Provide ADA bathroom signs.
FIRE-Final Inspection6/13/20186/14/20186/14/2018AFAIL
DetailsTroy Cobbley
Provide exit discharge lights per the approved plans. Mount the two fire extinguishers in the DIning Area and provide an additional one in the back corridor. Provide the two occupant load signs.

Phone #: ###-#### Inspection requested via web by Don Walker
FIRE-Conference5/23/20185/23/20185/23/2018PDONE
DetailsTroy Cobbley
The project superintendant and I went over the door hardware requirements and exit path requirements.
BLD-Ceiling Grid Inspection4/17/20184/18/20184/18/2018PPASS
DetailsMike Jordan
Please call when headed our way. Phone #: ###-#### Inspection requested via web by Don Walker
BLD-Ceiling Grid Inspection3/22/20183/22/20183/22/2018PPART
DetailsBrandon Shaw
Inspection in hard lid ares in bathrooms, retail 1 and retail 2- OK to cover
BLD-Wall cover3/6/20183/7/20183/7/2018ACANC
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Don Walker
BLD-Framing/Rough-in3/7/20183/7/20183/7/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Don Walker. Interior steel stud framed walls and soffits only.
Issue PAID IN FULL permit  1/12/2018 DONE
Plan assigned to (JAR)11/22/201711/22/20171/10/2018 DONE
DetailsJulie Romig
**1st Rev Comp - 2nd Rec'd - Paper - L3 Chow Public Market
Pending Assignment by CDM11/21/2017 1/10/2018 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK1/10/2018 1/10/2018 PASS
DetailsJulie Romig
Case Summary (BLD)  1/10/2018 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/10/2018 DONE
Permit Ready to Issue  1/10/2018 DONE
All Met
Print Occupancy Form  1/10/2018 DONE
Routing - FIRE1/9/20181/9/20181/9/2018 PASS
DetailsErika Akin
Attached comments and redlined plan sheet I-4.0
Route to Impact Fee Review1/4/20181/7/20181/5/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan resubmittals received  1/5/2018 DONE
DetailsChristina Prado
Received three sest of plans sheets marked I-1.0, I-5.0, I-5.1, I-5.3, I-5.4 and 5 sets of sheet I-4.0; Plans stamped and take JAR for review
Routing Off Site - STRUCTURAL12/29/2017 1/5/2018 PASS
DetailsJulie Romig
Routing - FIRE1/3/20181/3/20181/4/2018 FAIL
DetailsScott Arellano
Attached comments to plans and case. Emailed the architect.
1st review completed  1/4/2018 FAIL
DetailsJulie Romig
Routing - MECHANICAL1/3/2018 1/3/2018 PASS
DetailsTroy James
Routing - PLAN CHECK11/22/2017 1/3/2018 FAIL
DetailsJulie Romig
Plan Modification Accepted  12/29/2017 DONE
DetailsChristina Prado
Received third set of resubmittals and two additional stamped S1.0 drawings
Plan resubmittals received  12/28/2017 DONE
Two copies of I1.0 floor plan, I 2.0 reflected ceileing plan and S1.0 structural details. stamped and taken to julie R
Routing Off Site - STRUCTURAL12/14/2017 12/18/2017 FAIL
DetailsJulie Romig
2nd Review KPFF - new Structural Calcs received
Telephone call  12/14/2017 DONE
called courier for pick up of resub calcs to outside engineering
Plan resubmittals received  12/13/2017 DONE
resubmittals recieved 2 sets of struc calcs-took to Julie R
Routing Off Site - STRUCTURAL11/22/2017 12/5/2017 PASS
DetailsJulie Romig
No comments per structural email
Routing - PLUMBING11/30/2017 12/5/2017 PASS
DetailsBill VanDegrift
per plans and ISPC
additional cross connection protection may be required
Routing - MECHANICAL11/29/2017 11/30/2017 FAIL
DetailsTroy James
Need kitchen equipment plan and schedule
Routing - Erosion and Sediment11/28/2017 11/29/2017 PASS
DetailsAndy J. Long
No exterior disturbance or excavation described in scope. No ESC required. if found to be messy during construction will require permit.
Routing - PUBLIC WORKS11/27/2017 11/28/2017 PASS
DetailsRachael Beierle
Routing PW Environmental11/27/2017 11/28/2017 PASS
DetailsRick Christenson
Routing - PLANNING11/28/2017 11/28/2017 PASS
DetailsKatelyn Menuge
Design Review CZC17-00294
Routing - Addressing11/22/2017 11/27/2017 PASS
DetailsDoug Chausow
Plan resubmittals received  11/27/2017 DONE
One copy G-0.0, I-0.1,I-1.0,I-2.0,I-3.0,I-4.0, I-5.0,I-5.1, I-5.2,I-5.3,I-5.4,I-6.0,1, M1.0, M1.1, M2.0, M3.0, M4.0, M5.0, M6.0,M7.0, E0.0, E2.0D, E2.0F, E2.0L, E2.0MP, E2.0P, E2.0S, E2.1, E3.0, E3.1, E4.0, E4.1, E4.2, S-1.0 AND A COPY OF CALCULATIONS taken to Carl M
Plans ACCEPTED BY PLAN TECH  11/21/2017 DONE
Intake Approval  11/21/2017 PASS
DetailsJulie Romig
Recd Pcfee & Taken To Pln CK  11/21/2017 DONE
Application received 11/21/2017