Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD17-04288
StatusFinaled
Name ALPINE CONSTRUCTION INC
Site Address 11770 W PRESIDENT DR
Project NameBoise Rain Gutter - Suite G
Customer Number 
ePlanReviewYes
Description
(BOISE RAIN GUTTER – SUITE G) This building is fully fire sprinklered for area increase and non-separated uses. Permit is to remodel an existing 1,742 sq. ft. business/warehouse. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames and relocated, construction of select interior non-bearing walls to partition the warehouse from the office area, adding a new vertical grab bar and verify the existing restroom meets the requirements for an accessible restroom for the disabled, new light fixtures, electrical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 3/18/20183/20/2018 DONE
This permit finaled on the web by Garrett Bailey
Third Notice 2/17/20183/13/2018 DONE
mailed 3-14-18
Second Notice 1/22/20182/12/2018 DONE
Mailed 2-13-18
First Notice12/29/201712/29/20171/12/2018 DONE
DetailsBrandon Shaw
Mailed 1-12-18
BLD-Final12/28/201712/29/201712/29/2017PPASS
DetailsBrandon Shaw
call 30 min before // Garrett Phone #: ###-####
DOC - Permit Finaled12/29/201712/29/201712/29/2017PPASS
DetailsBrandon Shaw
FIRE-Final Inspection12/28/201712/29/201712/29/2017APASS
DetailsJim Page
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work complete.
Permanent Occupancy  12/29/2017 DONE
BLD-Framing/Rough-in12/19/201712/20/201712/20/2017APASS
DetailsMike Jordan
please call 30 minutes prior for access Phone #: ###-####
Print Occupancy Form  12/14/2017 DONE
Issue PAID IN FULL permit  12/14/2017 DONE
Plan assigned to (JG)12/7/201712/7/201712/13/2017 PASS
DetailsJavier Guzman
12/13 L1 BOISE RAIN GUTTER ePlan
Routing - PLAN CHECK12/7/2017 12/13/2017 PASS
DetailsJavier Guzman
1st review completed  12/13/2017 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  12/13/2017 DONE
Permit Ready to Issue  12/13/2017 DONE
NEED
GC FORM
REVISED CERT
Routing - FIRE12/7/201712/7/201712/12/2017 PASS
DetailsScott Arellano
Attached comments to case
Intake Approval  12/7/2017 PASS
DetailsJavier Guzman
Routing - Addressing12/7/2017 12/7/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS12/7/2017 12/7/2017 PASS
DetailsMorgan Webb
Application received  11/22/2017 DONE
Application submitted via PDS Online on Nov 22 2017 9:06AM