Telephone call | | | 12/10/2019 | | DONE |
|
|
|
left a message for keith about fee due as of july
|
Print Statement | | | 5/1/2019 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 3/19/2019 | | DONE |
|
|
|
|
Print Statement | | | 7/24/2018 | | DONE |
|
|
|
|
Third Notice | | 6/16/2018 | 7/10/2018 | | DONE |
|
|
|
mailed 7-11-18
|
Second Notice | | 5/21/2018 | 6/11/2018 | | DONE |
|
|
|
mailed 6-12
|
First Notice | 5/4/2018 | 5/4/2018 | 5/11/2018 | | DONE |
Mike Jordan
|
|
|
mailed 5-14
|
BLD-Final | 5/4/2018 | 5/4/2018 | 5/4/2018 | P | PASS |
Mike Jordan
|
|
|
Cody Phone #: ###-####
|
DOC - Permit Finaled | 5/4/2018 | 5/4/2018 | 5/4/2018 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 5/3/2018 | 5/4/2018 | 5/3/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Per verbal agreement the existing red fire lane painting will be extended to the west end of the building complex next week when stripping occurs.
Cody Phone #: ###-####
|
BLD-Framing/Rough-in | 3/8/2018 | 3/9/2018 | 3/9/2018 | A | PASS |
Mike Jordan
|
|
|
Cody-partial Phone #: ###-####
|
BLD-Framing/Rough-in | 2/23/2018 | 2/26/2018 | 2/26/2018 | A | PASS |
Mike Jordan
|
|
|
Partial/conference - Cody Phone #: ###-####. Exterior steel stud framing for ne facade at dead on archery main enterance, and remaining facade on north west corner of building.
|
BLD-Framing/Rough-in | 2/16/2018 | 2/16/2018 | 2/20/2018 | P | PASS |
Dave Hannah
|
|
|
Cody Phone #: ###-####
|
FIRE-Conference | 2/16/2018 | 2/16/2018 | 2/16/2018 | P | DONE |
Troy Cobbley
|
|
|
Conference was to discuss whether fire sprinkler protection would be required in the new canopy. Per the fire review comments none are required with conditions
Cody Phone #: ###-####
|
BLD-Framing/Rough-in | 2/13/2018 | 2/13/2018 | 2/13/2018 | P | PASS |
Mike Jordan
|
|
|
Bays 3 and 4 ok.
|
BLD-Framing/Rough-in | 2/7/2018 | 2/7/2018 | 2/7/2018 | P | PASS |
Mike Jordan
|
|
|
Cody-partial-infront of the Ace Hardware Phone #: ###-####. Exterior steel stud framing for new facade at bays 5 and 6.
|
BLD-Framing/Rough-in | 1/31/2018 | 1/31/2018 | 1/31/2018 | P | PASS |
Mike Jordan
|
|
|
Egor-Partial framing Phone #: ###-####. Exterior steel stud framed walls and for canopys and columns for new facade on space A and B.
|
Inspection Record Card- Bld | | | 1/26/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/26/2018 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 1/24/2018 | 1/25/2018 | 1/25/2018 | A | PASS |
Mike Jordan
|
|
|
Igor Phone #: ###-####. Bays 1 to 5 exterior flutting cover with steel studs ok. ok to cover with the 1/2 inch fire rated ply wood.
|
(F) Reprint permit | | | 1/12/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/12/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/11/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/11/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 1/10/2018 | | |
|
|
|
|
Routing - FIRE | 1/4/2018 | 1/4/2018 | 1/10/2018 | | PASS |
Scott Arellano
|
|
|
Attached comments to case
|
Plan assigned to (JAR) | 12/1/2017 | 12/1/2017 | 1/10/2018 | | DONE |
Julie Romig
|
|
|
**1st Rev Comp - 2nd Rec'd 01/04 - L3 Belmont Plaza Exterior Facade
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/10/2018 | | DONE |
|
|
|
MET-NEED
RP_MET
GC -MET
Rev cert of val-MET
|
Routing - PLAN CHECK | 1/4/2018 | | 1/8/2018 | | PASS |
Julie Romig
|
|
|
|
Routing Off Site - STRUCTURAL | 1/4/2018 | | 1/7/2018 | | PASS |
Julie Romig
|
|
|
|
Route to Impact Fee Review | 1/3/2018 | 1/6/2018 | 1/4/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - Design Review | 1/4/2018 | | 1/4/2018 | | PASS |
Katelyn Menuge
|
|
|
|
1st review completed | | | 1/3/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 12/1/2017 | | 1/3/2018 | | PASS |
Julie Romig
|
|
|
Pending approval by Structural, Fire, Design Review
|
Routing Off Site - STRUCTURAL | 12/1/2017 | | 12/13/2017 | | FAIL |
Julie Romig
|
|
|
|
Routing - FIRE | 12/1/2017 | 12/1/2017 | 12/6/2017 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect.
|
Routing - Erosion and Sediment | 12/1/2017 | | 12/6/2017 | | PASS |
Michael Zawacki
|
|
|
Waiver approved. Washout will need to be provided for any concrete used in construction or anchoring of new portico. Stucco and paint will need to be properly disposed off. Inlets will need protection if any flow from site may reach them.
|
Routing PW Drainage | 12/5/2017 | | 12/5/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - PUBLIC WORKS | 12/1/2017 | | 12/5/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 12/1/2017 | | 12/4/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - Design Review | 12/1/2017 | | 12/4/2017 | | FAIL |
Katelyn Menuge
|
|
|
Please remove stucco within three feet above grade.
|
Intake Approval | | | 12/1/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
pre screen accepted by Julie
|
Intake Approval | | | 11/24/2017 | | FAIL |
Julie Romig
|
|
|
Need: 1. Rotate all sheets to horizontal.
2. Completed Form 310 for Special Inspections.
|
Application received | | | 11/22/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 22 2017 12:11PM
|