Permit Information
Permit NumberBLD17-04316
StatusFinaled
Name THE RUSSELL CORPORATION
Site Address 7805 W GRATZ DR
Project NameLyle Pearson 2nd Flr Addition
Customer Number 
ePlanReviewYes
Description
(LYLE PEARSON JAGUAR/LAND ROVER/VOLVO - 2ND FLOOR ADDITION) **This building is fire sprinklered for area increase. Permit to add 447 sq ft of new second floor within the existing building footprint for offices and to remodel the existing second floor office area. Work to include: new structure for the second floor addition; new ceiling on first and second floors; new interior non-bearing partition walls; new doors; new interior relites; new electrical; new mechanical; new finishes to be in compliance with Ch. 8 of the 2012 IBC. Certificate of Occupancy issued only for new second floor addition; see BLD03-01135 for Certificate of Occupancy for rest of building. Special inspections are required per the attached Form 310. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Approval is contingent upon adhering to the approved plans on file and attached engineering. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 2/12/20202/18/2020 DONE
This permit finaled on the web by Caloub Huttash
Second Notice 1/9/20202/7/2020 DONE
mailed 2-10-20
First Notice12/9/201912/9/201912/30/2019 DONE
DetailsMike Jordan
mailed 1-1-20
BLD-Final12/6/201912/9/201912/9/2019APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Bob Thornton
DOC - Permit Finaled12/9/201912/9/201912/9/2019PPASS
DetailsMike Jordan
BLD-Final10/22/201810/22/201810/22/2018PPEND
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Bob Thornton. Needs special inspection final letter.
FIRE-Final Inspection10/18/201810/19/201810/19/2018APASS
DetailsTroy Cobbley
life safety passed


Phone #: ###-#### Inspection requested via web by Bob Thornton
FIRE-Final Inspection10/17/201810/18/201810/18/2018APART
DetailsTroy Cobbley
Life safety complete for the second floor. All emergency lights and exit signs have been repaired. Can't final the permit until the sprinkler permit is complete which is providing sprinkler protection at the ground level, at the stairs.

Phone #: ###-#### Inspection requested via web by Bob Thornton
FIRE-Final Inspection9/26/20189/28/20189/28/2018PFAIL
DetailsTroy Cobbley
Inspection was for the second floor. Need all exit signs and emergency lights for the entire facility repaired and the fire extinguishers provided with annual inspection.

Please call when you are on your way. Phone #: ###-#### Inspection requested via web by Bob Thornton
FIRE-Final Inspection9/26/20189/26/20189/26/2018PCANC
DetailsTroy Cobbley
Call me when you head this way. Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
BLD-Framing/Rough-in6/29/20186/29/20186/29/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Bob Thornton. @nd. floor interior steel stud framed walls ok.
BLD-Footing5/1/20185/2/20185/2/2018APASS
DetailsMike Jordan
We have concrete scheduled for 10 AM Phone #: ###-#### Inspection requested via web by Bob Thornton. Interior column pad footing for new column at mezz. addition.
Issue PAID IN FULL permit  3/13/2018 DONE
Print Occupancy Form  3/13/2018 DONE
DetailsChristina Prado
OVERRIDE  1/12/2018  
Route to Impact Fee Review1/4/20181/7/20181/12/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Permit Ready to Issue  1/12/2018 DONE
Need
RP

MET
Revised Cert of Value - met
GC Form - met
Plan assigned to (JAR)12/1/201712/1/20171/11/2018 DONE
DetailsJulie Romig
**1st Rev Comp - 2nd Rec'd 01/05 - L3 Lyle Pearson 2nd floor TI
Routing Off Site - STRUCTURAL1/5/2018 1/11/2018 PASS
DetailsJulie Romig
2nd Review
PLANS/APPL TAKEN TO FRONT DESK  1/11/2018 DONE
Routing - PLAN CHECK1/5/2018 1/5/2018 PASS
DetailsJulie Romig
1st review completed  1/4/2018 FAIL
DetailsJulie Romig
Routing - PLAN CHECK12/1/2017 1/4/2018 FAIL
DetailsJulie Romig
Routing Off Site - STRUCTURAL12/1/2017 12/15/2017 FAIL
DetailsJulie Romig
Corrections required per ePlanReview
Routing - FIRE12/1/201712/1/201712/4/2017 PASS
DetailsErika Akin
Attached comments to case
Routing - Erosion and Sediment12/1/2017 12/4/2017 PASS
DetailsMichael Zawacki
Waiver Approved
Routing - MECHANICAL12/1/2017 12/4/2017 PASS
DetailsTroy James
Routing - PLUMBING12/1/2017 12/4/2017 PASS
DetailsBill VanDegrift
no plumbing
Routing - Addressing12/1/2017 12/1/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS12/1/2017 12/1/2017 PASS
DetailsRachael Beierle
Intake Approval  12/1/2017 PASS
DetailsAdele J Schaffeld-Griffin
Javier accepted pre screen
Application received  11/27/2017 DONE
Application submitted via PDS Online on Nov 27 2017 3:22PM