Permit Information
Permit NumberBLD17-04338
StatusFinaled
Name SCOTT HEDRICK CONSTRUCTION
Site Address 1776 W COMMERCE AVE
Project NameBargreen Ellingson
Customer Number 
ePlanReviewYes
Description
(BARGREEN / ELLIGSON) Permit is to remodel an existing 2,949 sq. ft. business space within an existing 18,000 sq. ft. building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select walls, removal of select door/door frames, removal of select suspended acoustic ceiling, construction of select interior nonbearing walls to create (3) offices, a break room, a conference room, a storage room, an accessible restroom to the disabled, (6) offices with 60” half walls and select warehouse wall, select new door/door frames, select interior windows, millwork, select new gypsum and suspended acoustic ceilings, (3) new RTU’s plus (1) rooftop ERV and (1) rooftop VRF, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. Note: Structural engineering and modifications to the existing roof framing for the new RTU’s are attached. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  3/21/2019 DONE
Third Notice 2/12/20193/11/2019 DONE
mailed 3-12 mailed with third and final follow up
Third Follow up  3/11/2019 DONE
Third Notice 1/13/20192/7/2019 DONE
mailed 2-11-19 with second follow up letter
Second Follow up  2/7/2019 DONE
Third Notice 12/19/20181/8/2019 DONE
mailed 1-11-19 with first follow up letter
First Follow up  1/8/2019 DONE
Third Notice 11/12/201812/14/2018 DONE
mailed 12-17
Third Notice 10/17/201811/7/2018 DONE
mailed 11-12
Second Notice 9/17/201810/12/2018 DONE
mailed 10-15-18
First Notice9/5/20189/5/20189/7/2018 DONE
DetailsJim Storey
mailed 9-10-18
BLD-Final9/4/20189/5/20189/5/2018PPASS
DetailsJim Storey
Troy Phone #: ###-####
DOC - Permit Finaled9/5/20189/5/20189/5/2018PPASS
DetailsJim Storey
FIRE-Final Inspection9/4/20189/5/20189/5/2018APASS
DetailsJim Page
Previously noted items have been completed, final life fire safety inspection complete.

Troy Phone #: ###-####
BLD-Final7/6/20187/9/20187/9/2018ANR
DetailsJim Storey
Troy Phone #: ###-####
FIRE-Final Inspection7/6/20187/6/20187/6/2018PFAIL
DetailsTroy Cobbley
Provide the missing exit sign, provide single action hardware on the new restroom door and the east facing exterior exit door.


Troy Phone #: ###-####
BLD-Aging Inspection6/28/20186/28/20187/5/2018 PASS
DetailsJim Storey
nr
BLD-Aging Inspection6/27/20186/27/20187/5/2018 NR
DetailsJim Storey
FIRE-Alarm Testing4/12/20184/13/20184/13/2018ACANC
DetailsJim Page
This request is cancelled, inspection request was for fire sprinkler inspection.
BLD-Ceiling Grid Inspection3/16/20183/19/20183/19/2018APASS
DetailsJim Storey
This inspection is for the ceiling grid in the remodeled office area at Bargreen/Ellingson. Please contact Troy with any questions or concerns. Phone #: ###-#### Inspection requested via web by Troy Ballard
BLD-Framing/Rough-in2/13/20182/13/20182/13/2018PPASS
DetailsJim Storey
This inspection is for the structural support required to be added to support the HVAC Roof Top Units. Please contact Troy roughly an hour before inspection so that I can be present at time of inspection. The building is open for business until 5 pm, entry access through the front doors. Phone #: ###-#### Inspection requested via web by Troy Ballard roof supports instal per aproved plan pass
BLD-Framing/Rough-in1/22/20181/22/20181/22/2018PPART
DetailsJim Storey
When you get to the site ask for Matt at the front desk and he will direct you to the area that needs to be inspected. If Possible please call me about an hour before you are going to be on site and I will try to get there to meet you for the inspection. ###-#### Phone #: ###-#### Inspection requested via web by Troy Ballard// interior walls ok to cover/ pending perlins for roof and backing for bathroom.//ok to drywall.
Inspection Record Card- Bld  1/12/2018 DONE
Issue PAID IN FULL permit  1/12/2018 DONE
Plan assigned to (JG)12/1/201712/1/20171/8/2018 PASS
DetailsJavier Guzman
1st rev comp, 12/07 L1 Bargreen Ellingson Office ePlan, pend eng
Routing Off Site - STRUCTURAL1/3/2018 1/8/2018 PASS
DetailsJavier Guzman
signed off in ePlan by AHJ Engineers Chris Holladay
PLANS/APPL TAKEN TO FRONT DESK  1/8/2018 DONE
Permit Ready to Issue  1/8/2018 DONE
Need:
GC form
Revised value
Routing - PLAN CHECK1/3/2018 1/6/2018 PASS
DetailsJavier Guzman
Routing Off Site - STRUCTURAL12/20/2017 12/27/2017 FAIL
DetailsJavier Guzman
failed in ePlan by AHJ Engineers Chris Holladay
Routing - PLAN CHECK12/20/2017 12/20/2017 FAIL
DetailsJavier Guzman
Need engineering calcs for the new RTU
Routing - PLAN CHECK12/20/2017 12/20/2017 PASS
DetailsJavier Guzman
Route to Impact Fee Review12/9/201712/12/201712/11/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  12/9/2017 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK12/1/2017 12/9/2017 FAIL
DetailsJavier Guzman
Routing - PUBLIC WORKS12/1/2017 12/6/2017 PASS
DetailsMorgan Webb
Routing - MECHANICAL12/1/2017 12/5/2017 PASS
DetailsTroy James
Routing - FIRE12/1/201712/1/201712/4/2017 PASS
DetailsScott Arellano
Attached comments to case
Routing - Addressing12/1/2017 12/4/2017 PASS
DetailsDoug Chausow
Intake Approval  12/1/2017 PASS
DetailsJavier Guzman
Application received  11/29/2017 DONE
Application submitted via PDS Online on Nov 29 2017 9:39AM