BLD-Final | 9/6/2018 | 9/7/2018 | 9/7/2018 | A | PASS |
Brandon Shaw
|
|
|
This permit is for the installation of the pool and pool deck only. No occupancy at this time.
|
DOC - Permit Finaled | 9/7/2018 | 9/7/2018 | 9/7/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 9/5/2018 | 9/6/2018 | 9/6/2018 | A | FAIL |
Brandon Shaw
|
|
|
No access
|
FIRE-Final Inspection | 9/5/2018 | 9/5/2018 | 9/5/2018 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection complete.
|
BLD-Other | 6/6/2018 | 6/7/2018 | 6/7/2018 | A | CANC |
Brandon Shaw
|
|
|
Les---soffit Phone #: ###-####
|
BLD-Footing | 6/4/2018 | 6/5/2018 | 6/5/2018 | A | PASS |
Brandon Shaw
|
|
|
Brodie Phone #: ###-####
|
Print Occupancy Form | | | 6/1/2018 | | DONE |
|
|
|
|
PubWorks Subgrade Approval | 5/22/2018 | 5/22/2018 | 5/22/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 4/13/2018 | 4/16/2018 | 4/16/2018 | A | NR |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
|
BLD-Footing | 4/11/2018 | 4/12/2018 | 4/12/2018 | A | CANC |
Brandon Shaw
|
|
|
Per Kyles request
|
BLD-Footing | 4/5/2018 | 4/5/2018 | 4/5/2018 | P | CANC |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
|
Issue PAID IN FULL permit | | | 4/4/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/4/2018 | | DONE |
|
|
|
|
Telephone call | | | 4/3/2018 | | DONE |
|
|
|
emailed Jason that we still need more info in order to apply the remaining fees
|
Plan assigned to (JAR) | 1/5/2018 | 1/5/2018 | 3/23/2018 | | DONE |
Julie Romig
|
|
|
**1st Rev Comp - 4th Rec'd 03/20 - 538 Harris North Pool
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/23/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/23/2018 | | DONE |
|
|
|
all met-NEED
RP-MET
GC FORM-met
REVISED VALUE-met
|
Routing - PLAN CHECK | 3/8/2018 | | 3/14/2018 | | FAIL |
Julie Romig
|
|
|
Pending apporval of pool house permit BLD17-04354.
|
Routing - PLAN CHECK | 2/21/2018 | | 3/8/2018 | | FAIL |
Julie Romig
|
|
|
Pending approval of pool house permit BLD17-04354.
|
Routing Off Site - STRUCTURAL | 2/21/2018 | | 2/27/2018 | | PASS |
Julie Romig
|
|
|
2nd Review
|
Routing - MECHANICAL | 2/21/2018 | | 2/21/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 2/21/2018 | | 2/21/2018 | | PASS |
Bill VanDegrift
|
|
|
water to pool equipment will need to be isolated. This permit is for the pool only.
|
Routing - PLAN CHECK | 1/5/2018 | | 2/2/2018 | | FAIL |
Julie Romig
|
|
|
Review done under BLD17-04354, pool house permit. Upload revised drawings to pool permit BLD17-04347 to match pool house permit.
|
1st review completed | | | 2/2/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing PW Sewer Design | 1/5/2018 | | 1/23/2018 | | PASS |
Mike Sheppard
|
|
|
|
Routing PW Environmental | 1/5/2018 | | 1/11/2018 | | PASS |
Rick Christenson
|
|
|
|
Routing Off Site - STRUCTURAL | 1/5/2018 | | 1/10/2018 | | FAIL |
Julie Romig
|
|
|
Corrections required per ePlanReview
|
Routing PW Grading-Hillside | 1/5/2018 | | 1/9/2018 | | PASS |
Jason C. Taylor
|
|
|
No comments on pool shell. Review for site will be under BLD17-04354. JCT
|
Routing PW Drainage | 1/5/2018 | | 1/9/2018 | | CANC |
Jason C. Taylor
|
|
|
No comments on pool shell. Review for site will be under BLD17-04354. JCT
|
Routing - MECHANICAL | 1/5/2018 | | 1/8/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 1/5/2018 | | 1/5/2018 | | PASS |
Bill VanDegrift
|
|
|
pool only
|
Routing - Addressing | 1/5/2018 | | 1/5/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/5/2018 | | 1/5/2018 | | PASS |
Rachael Beierle
|
|
|
POOL ONLY
|
Routing - Design Review | 1/5/2018 | | 1/5/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Routing PW Street Lights | 1/5/2018 | | 1/5/2018 | | PASS |
Tom Marshall
|
|
|
|
Intake Approval | | | 1/5/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Julie accepted pre screen
|
Routing PW Solid Waste | 1/5/2018 | | 1/5/2018 | | PASS |
Evan Carpenter
|
|
|
|
Intake Approval | | | 12/8/2017 | | FAIL |
Julie Romig
|
|
|
Need: 1. Drawing sheets must be uploaded as individual sheet files. Re-upload PDF packages "Pool House Plans" and "Pool Plans" as individual sheets with files named per the City of Boise naming convention (ex. "L1.1_Layout & Materials Plan").
2. G1.1 cover sheet with Vicinity Map, Code Analysis, and Table of Contents.
3. Form 310 Special Inspections, stamped/signed by engineer.
4. Site Drainage Report.
5. Drainage System Operation and Maintenance Plan.
6. Plumbing Plans - indicated on checklist but not provided.
7. Electrical Plans with note per checklist and grounding and bonding details and notes.
8. Entrapment avoidance, suction outlets design, and atmospheric vacuum relief system, and dual drain separation (not found on sheet S1.1).
9. Energy Code Compliance Items - Time switches or exception to time switch, specification for pool cover. If pool will have lighting, provide lighting plan, fixture schedule, and lighting COMcheck.
|
Application received | | | 11/29/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 29 2017 12:36PM
|
First Notice | 9/7/2018 | 9/7/2018 | | | |
Brandon Shaw
|
|
|
|