Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD17-04347
StatusFinaled
Name S & E CEMENT INC
Site Address 5501 E HOOTOWL DR
Project NameHarris North Pool
Customer Number 
ePlanReviewYes
Description
(HARRIS NORTH POOL) Pemit for the installation of a new pool adjacent to the pool house building permitted under BLD17-04354. The perimeter fence barrier and exiting was addressed under BLD17-04354 as was the restroom fixture count. This permit is for the installation of the pool and pool deck only. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/6/20189/7/20189/7/2018APASS
DetailsBrandon Shaw
This permit is for the installation of the pool and pool deck only. No occupancy at this time.
DOC - Permit Finaled9/7/20189/7/20189/7/2018PPASS
DetailsBrandon Shaw
BLD-Final9/5/20189/6/20189/6/2018AFAIL
DetailsBrandon Shaw
No access
FIRE-Final Inspection9/5/20189/5/20189/5/2018APASS
DetailsJim Page
Final life fire safety inspection complete.
BLD-Other6/6/20186/7/20186/7/2018ACANC
DetailsBrandon Shaw
Les---soffit Phone #: ###-####
BLD-Footing6/4/20186/5/20186/5/2018APASS
DetailsBrandon Shaw
Brodie Phone #: ###-####
Print Occupancy Form  6/1/2018 DONE
PubWorks Subgrade Approval5/22/20185/22/20185/22/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Footing4/13/20184/16/20184/16/2018ANR
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
BLD-Footing4/11/20184/12/20184/12/2018ACANC
DetailsBrandon Shaw
Per Kyles request
BLD-Footing4/5/20184/5/20184/5/2018PCANC
DetailsBrandon Shaw
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
Issue PAID IN FULL permit  4/4/2018 DONE
Print Occupancy Form  4/4/2018 DONE
Telephone call  4/3/2018 DONE
emailed Jason that we still need more info in order to apply the remaining fees
Plan assigned to (JAR)1/5/20181/5/20183/23/2018 DONE
DetailsJulie Romig
**1st Rev Comp - 4th Rec'd 03/20 - 538 Harris North Pool
PLANS/APPL TAKEN TO FRONT DESK  3/23/2018 DONE
Permit Ready to Issue  3/23/2018 DONE
all met-NEED
RP-MET
GC FORM-met
REVISED VALUE-met
Routing - PLAN CHECK3/8/2018 3/14/2018 FAIL
DetailsJulie Romig
Pending apporval of pool house permit BLD17-04354.
Routing - PLAN CHECK2/21/2018 3/8/2018 FAIL
DetailsJulie Romig
Pending approval of pool house permit BLD17-04354.
Routing Off Site - STRUCTURAL2/21/2018 2/27/2018 PASS
DetailsJulie Romig
2nd Review
Routing - MECHANICAL2/21/2018 2/21/2018 PASS
DetailsTroy James
Routing - PLUMBING2/21/2018 2/21/2018 PASS
DetailsBill VanDegrift
water to pool equipment will need to be isolated. This permit is for the pool only.
Routing - PLAN CHECK1/5/2018 2/2/2018 FAIL
DetailsJulie Romig
Review done under BLD17-04354, pool house permit. Upload revised drawings to pool permit BLD17-04347 to match pool house permit.
1st review completed  2/2/2018 FAIL
DetailsJulie Romig
Routing PW Sewer Design1/5/2018 1/23/2018 PASS
DetailsMike Sheppard
Routing PW Environmental1/5/2018 1/11/2018 PASS
DetailsRick Christenson
Routing Off Site - STRUCTURAL1/5/2018 1/10/2018 FAIL
DetailsJulie Romig
Corrections required per ePlanReview
Routing PW Grading-Hillside1/5/2018 1/9/2018 PASS
DetailsJason C. Taylor
No comments on pool shell. Review for site will be under BLD17-04354. JCT
Routing PW Drainage1/5/2018 1/9/2018 CANC
DetailsJason C. Taylor
No comments on pool shell. Review for site will be under BLD17-04354. JCT
Routing - MECHANICAL1/5/2018 1/8/2018 PASS
DetailsTroy James
Routing - PLUMBING1/5/2018 1/5/2018 PASS
DetailsBill VanDegrift
pool only
Routing - Addressing1/5/2018 1/5/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/5/2018 1/5/2018 PASS
DetailsRachael Beierle
POOL ONLY
Routing - Design Review1/5/2018 1/5/2018 PASS
DetailsKatelyn Menuge
Routing PW Street Lights1/5/2018 1/5/2018 PASS
DetailsTom Marshall
Intake Approval  1/5/2018 PASS
DetailsAdele J Schaffeld-Griffin
Julie accepted pre screen
Routing PW Solid Waste1/5/2018 1/5/2018 PASS
DetailsEvan Carpenter
Intake Approval  12/8/2017 FAIL
DetailsJulie Romig
Need: 1. Drawing sheets must be uploaded as individual sheet files. Re-upload PDF packages "Pool House Plans" and "Pool Plans" as individual sheets with files named per the City of Boise naming convention (ex. "L1.1_Layout & Materials Plan").
2. G1.1 cover sheet with Vicinity Map, Code Analysis, and Table of Contents.
3. Form 310 Special Inspections, stamped/signed by engineer.
4. Site Drainage Report.
5. Drainage System Operation and Maintenance Plan.
6. Plumbing Plans - indicated on checklist but not provided.
7. Electrical Plans with note per checklist and grounding and bonding details and notes.
8. Entrapment avoidance, suction outlets design, and atmospheric vacuum relief system, and dual drain separation (not found on sheet S1.1).
9. Energy Code Compliance Items - Time switches or exception to time switch, specification for pool cover. If pool will have lighting, provide lighting plan, fixture schedule, and lighting COMcheck.

Application received  11/29/2017 DONE
Application submitted via PDS Online on Nov 29 2017 12:36PM
First Notice9/7/20189/7/2018   
DetailsBrandon Shaw