Permit Information
Permit NumberBLD17-04348
StatusExpired
Name ZAK CUTLER CONSTRUCTION
Site Address 5426 W HILL RD
Project Name 
Customer Number 
ePlanReviewNo
Description
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor 208-608-7171. Permit for 525sq' of ground-mounted, grid-tied Photo-voltaic panels with optimizers; 30 panels in 2 array. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **JAB**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection11/14/201811/14/201811/16/2018 CANC
DetailsTony Young
DOC - Permit Expired11/14/201811/14/201811/14/2018PPASS
DetailsTony Young
BLD-Aging Inspection11/13/201811/13/201811/14/2018 CANC
DetailsTony Young
BLD-Final1/23/20181/24/20181/24/2018ANR
DetailsTony Young
Zak Phone #: ###-####
BLD-Final1/23/20181/23/20181/23/2018PNR
DetailsTony Young
Zak Phone #: ###-####
BLD-Final1/22/20181/23/20181/23/2018ANR
DetailsTony Young
Zak Phone #: ###-####,, need hillside
Issue PAID IN FULL permit  12/29/2017 DONE
OVERRIDE  12/13/2017  
Plan assigned to (JAB) Josh11/29/201711/29/201712/13/2017 PASS
DetailsJosh Bogle
1st done - need footing engineering & ESC plan/waiver
Routing - PLAN CHECK12/13/2017 12/13/2017 PASS
DetailsJosh Bogle
Routing - Erosion and Sediment12/12/2017 12/13/2017 PASS
DetailsAndy J. Long
ESC plan waiver approved. Certified RP designated. No site prep inspection required
Case Summary (BLD)  12/13/2017 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  12/13/2017 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  12/13/2017 DONE
DetailsJosh Bogle
ESC yes - Energy no
Telephone call  12/13/2017 DONE
DetailsChristina Prado
Called Zak to advise permit is ready and gave fees due
Permit Ready to Issue  12/13/2017 DONE
DetailsChristina Prado
Plan resubmittals received  12/11/2017 DONE
Copy of foundation calculations and letter to Erosion Control Manager
Routing - PLAN CHECK11/29/2017 11/30/2017 FAIL
DetailsJosh Bogle
Routing PW Grading-Hillside11/29/2017 11/30/2017 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
1st review completed  11/30/2017 DONE
DetailsJosh Bogle
Routing Walk-In (Zoning)11/29/201711/29/201711/29/2017PPASS
DetailsJeff Lowe
complies with setbacks
Routing Walk-In (BLD)11/29/201711/29/201711/29/2017PPASS
DetailsJosh Bogle
took in as level 2 to asses Hillside footings
Application received 11/29/2017   
Routing - PLANNING11/29/2017   FAIL
Needs to meet R-1B setbacks