Third Notice | | 11/11/2018 | 11/19/2018 | | DONE |
|
|
|
This permit finaled on the web by BHH Drafter
|
Second Notice | | 10/21/2018 | 11/6/2018 | | DONE |
|
|
|
mailed 11-12
|
First Notice | | 9/29/2018 | 10/11/2018 | | DONE |
|
|
|
mailed 10-12-18
|
BLD-Final | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Brandon Shaw
|
|
|
Kyle Phone #: ###-####
|
DOC - Permit Finaled | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 9/19/2018 | 9/19/2018 | 9/19/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
Permanent Occupancy | | | 9/19/2018 | | DONE |
|
|
|
|
BLD-Final | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | CANC |
Brandon Shaw
|
|
|
Kyle Phone #: ###-####
|
BLD-Final | 9/14/2018 | 9/14/2018 | 9/14/2018 | P | NR |
Brandon Shaw
|
|
|
Need PW approval... No other issues...
|
FIRE-Final Inspection | 9/4/2018 | 9/5/2018 | 9/5/2018 | A | PASS |
Jim Page
|
|
|
Previously noted items have been completed, final life fire safety inspection complete.
Austin Phone #: ###-####
|
FIRE-Final Inspection | 8/31/2018 | 9/4/2018 | 9/4/2018 | A | FAIL |
Jim Page
|
|
|
Provide fire extinguisher with a current inspection tag as discussed. Provide proprerty address for building on road address side of street as discussed. (Building is a corner lot).
Please call ahead for access - Austin Phone #: ###-####
|
Print Occupancy Form | | | 8/29/2018 | | DONE |
|
|
|
|
BLD-Energy code compliance | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | PASS |
Brandon Shaw
|
|
|
Kyle Phone #: ###-####
|
BLD-Framing/Rough-in | 6/7/2018 | 6/8/2018 | 6/8/2018 | A | PASS |
Brandon Shaw
|
|
|
Kyle Phone #: ###-####
|
BLD-Framing/Rough-in | 6/6/2018 | 6/7/2018 | 6/7/2018 | P | PEND |
Brandon Shaw
|
|
|
Mech- gas line pressure test failed
No Framing issues...
|
BLD-Other | 6/6/2018 | 6/7/2018 | 6/7/2018 | A | PASS |
Brandon Shaw
|
|
|
Kyle--soffit Phone #: ###-####
|
BLD-Wall Bracing | 5/31/2018 | 6/1/2018 | 6/1/2018 | A | PASS |
Brandon Shaw
|
|
|
Kyle Phone #: ###-####
|
BLD-Foundation | 4/24/2018 | 4/24/2018 | 4/24/2018 | A | PEND |
Brandon Shaw
|
|
|
Pending Special Inspection, structural steel
|
BLD-Foundation | 4/23/2018 | 4/23/2018 | 4/23/2018 | P | CANC |
Dave Hannah
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Inspection cancelled via mobile web on Monday, April 23, 2018.
|
BLD-Footing | 4/17/2018 | 4/17/2018 | 4/17/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 4/16/2018 | 4/16/2018 | 4/16/2018 | P | CANC |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
|
BLD-Footing | 4/13/2018 | 4/13/2018 | 4/16/2018 | P | NR |
Brandon Shaw
|
|
|
|
PubWorks Subgrade Approval | 4/12/2018 | 4/12/2018 | 4/12/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 4/10/2018 | 4/11/2018 | 4/11/2018 | A | FAIL |
Brandon Shaw
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection.
|
Issue PAID IN FULL permit | | | 4/6/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/6/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 3/23/2018 | | |
|
|
|
|
Plan assigned to (JAR) | 12/14/2017 | 12/14/2017 | 3/23/2018 | | DONE |
Julie Romig
|
|
|
**1st Rev Comp - 4th Rec'd 03/20 - 502 Harris North pool house
|
Routing PW Drainage | 3/20/2018 | | 3/23/2018 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Grading-Hillside | 3/20/2018 | | 3/23/2018 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Jason Taylor ###-####.
|
Routing - PLAN CHECK | 3/20/2018 | | 3/23/2018 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/23/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/23/2018 | | DONE |
|
|
|
NEED
ACHD-met
RP - met
GC FORM - Met
REVISED VALUE -met
jstirtz@boisehunterhomes.com
|
Routing PW Drainage | 3/8/2018 | | 3/14/2018 | | FAIL |
Jason C. Taylor
|
|
|
see chagemarks in eplan
|
Routing - PLAN CHECK | 3/8/2018 | | 3/9/2018 | | PASS |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 2/21/2018 | | 3/8/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing PW Drainage | 2/21/2018 | | 2/27/2018 | | FAIL |
Jason C. Taylor
|
|
|
See change marks for geotech report
|
Routing PW Grading-Hillside | 2/21/2018 | | 2/27/2018 | | FAIL |
Jason C. Taylor
|
|
|
See change marks for geotech report
|
Routing Off Site - STRUCTURAL | 2/21/2018 | | 2/22/2018 | | PASS |
Julie Romig
|
|
|
2nd Review
|
Routing - PUBLIC WORKS | 2/21/2018 | | 2/21/2018 | | PASS |
Morgan Webb
|
|
|
|
Route to Impact Fee Review | 2/2/2018 | 2/5/2018 | 2/5/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 2/2/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 12/14/2017 | | 2/2/2018 | | FAIL |
Julie Romig
|
|
|
Corrections required per ePlanReview.
|
Routing Off Site - STRUCTURAL | 12/14/2017 | | 1/21/2018 | | FAIL |
Julie Romig
|
|
|
Corrections required per ePlanReview
|
Routing PW Drainage | 12/15/2017 | | 1/2/2018 | | FAIL |
Jason C. Taylor
|
|
|
|
Routing - FIRE | 12/14/2017 | 12/14/2017 | 12/22/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to case
|
Routing PW Grading-Hillside | 12/15/2017 | | 12/20/2017 | | FAIL |
Jason C. Taylor
|
|
|
I have reviewed the geotechnical report dated October 19, 2017 and have a few revisions needed. I understand that an addendum may be needed for the following items:
Report need to address the required items listed in the Boise City Hillside Manual (attached). In particular:
1. Note H. No conclusions or recommendations have been given for suitability of the site.
Please resubmit the report or addendum to your client for upload into the permitting system,
|
Routing PW Solid Waste | 12/15/2017 | | 12/19/2017 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Sewer Design | 12/15/2017 | | 12/18/2017 | | PASS |
Mike Sheppard
|
|
|
|
Routing PW Street Lights | 12/15/2017 | | 12/15/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing - PUBLIC WORKS | 12/14/2017 | | 12/15/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - MECHANICAL | 12/14/2017 | | 12/15/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 12/14/2017 | | 12/14/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - PLANNING | 12/14/2017 | | 12/14/2017 | | PASS |
Brent Moore
|
|
|
|
Routing - Addressing | 12/14/2017 | | 12/14/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - Design Review | 12/14/2017 | | 12/14/2017 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - Erosion and Sediment | 12/14/2017 | | 12/14/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan by certified PD approved. Need to designate RP for project. Site preparation inspection required.
|
Intake Approval | | | 12/14/2017 | | PASS |
|
|
|
|
Intake Approval | | | 12/8/2017 | | FAIL |
Julie Romig
|
|
|
Need: 1. Form 310 Special Inspections completed with Design Professional information, Owner information, and owner signature.
2. Verification of Legal Lot or Parcel completed with Subdivision Planner approval. Contact Todd Tucker at TTucker@cityofboise.org for approval.
3. Lighting COMcheck form.
|
Application received | | | 11/29/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 29 2017 2:52PM
|
Routing PW Grading-Hillside | 3/8/2018 | | | | FAIL |
Jason C. Taylor
|
|
|
see chagemarks in eplan
|