First Notice | 4/15/2019 | 4/15/2019 | 4/16/2019 | | DONE |
Jim Storey
|
|
|
This permit finaled on the web by Dwayne Robinson
|
BLD-Final | 4/12/2019 | 4/15/2019 | 4/15/2019 | P | PASS |
Jim Storey
|
|
|
Call prior to going Phone #: 8016688644 >> Inspection requested via mobile web by Elliott Ware
|
DOC - Permit Finaled | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 1/11/2019 | 1/11/2019 | 1/11/2019 | | PASS |
Jim Storey
|
|
|
Expires: 02/26/19
|
CHANGE STATUS TO (ISS) | | | 5/8/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/8/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/7/2018 | | DONE |
|
|
|
Plan Mod
DO NOT REISSUE
|
Plan assigned to (JG) | 5/2/2018 | 5/2/2018 | 5/5/2018 | | PASS |
Javier Guzman
|
|
|
Plan mod AT&T Wireless ePlan
|
Routing - PLAN CHECK | 5/4/2018 | | 5/5/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLANNING | 5/4/2018 | | 5/4/2018 | | PASS |
Celine Acord
|
|
|
|
Plan Modification Accepted | | | 5/2/2018 | | DONE |
|
|
|
Plan mod started to add to scope of work.
|
Telephone call | | | 3/5/2018 | | DONE |
|
|
|
emailed Jessica again that we need the signed permit back and if she wants to change the GC we will need both forms filled out again for both 302 & 306 forms
|
(F) Reprint permit | | | 3/5/2018 | | DONE |
|
|
|
|
Telephone call | | | 3/2/2018 | | DONE |
|
|
|
Jessica said that General Dynamics was going to be the GC but she gave me a different RCE #. I assigned Idaho Tower Construction to be GC and she will verify which one will be actually doing the work. If it's not Idaho Tower Construction, she will get a new GC form filled out
|
Issue PAID IN FULL permit | | | 2/26/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/26/2018 | | DONE |
|
|
|
|
Plan assigned to (JG) | 12/27/2017 | 12/27/2017 | 2/13/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 1/09 L2 AT&T antenna ePlan, pend planning
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/13/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/13/2018 | | DONE |
|
|
|
ALL MET 2-22-18 CAN-Need
GC Form
Revised Cert of Value
|
Routing - PLANNING | 2/2/2018 | | 2/9/2018 | | PASS |
Celine Acord
|
|
|
per CAA18-00014
|
Routing - PLAN CHECK | 2/2/2018 | | 2/2/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 1/30/2018 | | 2/2/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLANNING | 1/30/2018 | | 1/30/2018 | | FAIL |
Nicolette Womack
|
|
|
Appeal Period ends Feb 8, 2018. Route review to CA as they reviewed the CAA application.
|
Route to Impact Fee Review | 1/11/2018 | 1/14/2018 | 1/12/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 1/11/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 12/27/2017 | | 1/11/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLANNING | 12/27/2017 | | 12/27/2017 | | FAIL |
Nicolette Womack
|
|
|
Required to submit for Administrative Review.
|
Intake Approval | | | 12/27/2017 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 12/15/2017 | | FAIL |
Rob Patrick
|
|
|
12-15-17...
1. Please submit drawings on 18x24 sheets as a minimum. The reason this is a requirement is because our Automated Batch Stamp System will not work on sheet sizes smaller than that.
Thank you
Rob Patrick
|
Intake Approval | | | 12/7/2017 | | FAIL |
Rob Patrick
|
|
|
12-7-17...
1. The Professional Stamp and Signature are not loading when the drawings are opened. Please make sure all drawings will show the professional stamp and signature.
2. All drawings are to be submitted on 18x24 sheets as a minimum. Please refer to the Electronic Plan Review Submittal Standards.
3. Structural calculations are required to accompany the Structural Opinion Letter.
Thank you
Rob Patrick
|
Intake Approval | | | 12/6/2017 | | FAIL |
Rob Patrick
|
|
|
12-6-17...
1. Please upload dwgs with correct numbering convention specified in the Electronic Plan Review Submittal Standards on the City of Boise website.
2. Please have design professional stamp and sign all dwg sheets.
3. Checklist items need to have appropriate sheet number indicated to find information.
Thank you
Rob Patrick
|
Intake Approval | | | 11/30/2017 | | FAIL |
Rob Patrick
|
|
|
David: To complete the review please provide all the documents requested in the instructions. At minimum please provide the following:
1. #518 - Submittal Checklist
2. #304 - Registered Design Professional Form
|
Application received | | | 11/29/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 29 2017 11:13PM
|