FIRE-Conference | 11/6/2018 | 11/7/2018 | 11/6/2018 | A | DONE |
Troy Cobbley
|
|
|
I stopped at the job site and let the tenant know that a sprinkler analysis will be required. After further discussion with the plan reviewer the column protection will not be required unless the storage height exceeds 15'
|
BLD-Other | 10/31/2018 | 11/5/2018 | 11/2/2018 | A | CANC |
Mike Jordan
|
|
|
Pallet racking >> Inspection requested via web by Jeff Higgins Inspection cancelled from web by: Jeff Higgins
|
FIRE-Final Inspection | 10/31/2018 | 11/2/2018 | 11/2/2018 | A | FAIL |
Troy Cobbley
|
|
|
Provide revised plans showing all racking requiring permits, provide sprinkler protection of the columns in the double row racking as per NFPA 13 16.1.4
Inspection requested via web by Jeff Higgins
|
Issue PAID IN FULL permit | | | 12/27/2017 | | DONE |
|
|
|
|
Plan assigned to (JG) | 12/4/2017 | 12/4/2017 | 12/18/2017 | | PASS |
Javier Guzman
|
|
|
L2 12/13 Sentry Racking paper, pend fire
|
Routing - PLAN CHECK | 12/15/2017 | | 12/18/2017 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 12/18/2017 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/18/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/18/2017 | | DONE |
|
|
|
NEED
GC FORM
|
Inspection Record Card- Bld | | | 12/18/2017 | | DONE |
|
|
|
|
Telephone call | | | 12/18/2017 | | DONE |
|
|
|
called Jeff and told him permit is ready and fee due
|
Routing - FIRE | 12/15/2017 | | 12/15/2017 | | PASS |
Scott Arellano
|
|
|
Plans are approved. However, this building is fully fire sprinklered and it is recommeded that the building owner have an Idaho licensed fire sprinkler contractor confirm the existing fire sprinkler system design is appropriate for the proposed new storage. Any necessary modifications will require a separate fire sprinkler permit.
|
Case Summary (BLD) | | | 12/14/2017 | | DONE |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 12/4/2017 | | 12/14/2017 | | PASS |
Javier Guzman
|
|
|
|
Pending Assignment by CDM | 12/1/2017 | | 12/4/2017 | | DONE |
Carl D Madsen
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/30/2017 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 11/30/2017 | | PASS |
Carl Westfall
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/30/2017 | | DONE |
|
|
|
|
Application received | | 11/30/2017 | | | |
|
|
|
|