BLD-Final | 9/17/2018 | 9/18/2018 | 9/18/2018 | P | PASS |
Brandon Shaw
|
|
|
Please call when you are headed over so I can open house and make sure we are ok with sidewalk being scheduled and not compleated as we discussed. Phone #: ###-#### Inspection requested via web by Damion Jordan
|
DOC - Permit Finaled | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Wall cover | 6/7/2018 | 6/8/2018 | 6/8/2018 | P | PASS |
Jim Storey
|
|
|
Damion--as late as possible Phone #: ###-####
|
BLD-Conference | 6/5/2018 | 6/6/2018 | 6/6/2018 | A | PASS |
Jim Storey
|
|
|
Bob Phone #: ###-####
|
BLD-Framing/Rough-in | 6/5/2018 | 6/6/2018 | 6/6/2018 | A | PART |
Jim Storey
|
|
|
Bob Phone #: ###-#### remove plm vent from 48 inches of fire wall/ exstened fire wall thur soffit front and back.
|
BLD-Framing/Rough-in | 6/4/2018 | 6/5/2018 | 6/5/2018 | P | DEFR |
Jim Storey
|
|
|
Bob Phone #: ###-####
|
Plan Modification Accepted | | | 5/15/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 5/15/2018 | | 5/15/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 5/1/2018 | 5/2/2018 | 5/2/2018 | A | PASS |
Jim Storey
|
|
|
Bob Phone #: ###-#### fire wall not passing thru soffits yet
|
BLD-Conference | 4/3/2018 | 4/4/2018 | 4/4/2018 | A | PASS |
Jim Storey
|
|
|
Bob Phone #: ###-#### reviewed 2 hr wall details
|
BLD-Footing | 3/6/2018 | 3/6/2018 | 3/6/2018 | P | PASS |
Jim Storey
|
|
|
Call for plans- Dave Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/8/2018 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/8/2018 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 1/30/2018 | | DONE |
Brian McGowan
|
|
|
Carl did the final Plan Check for the resubmitted drawings on the Changemarks I requested since I was in Fort Hall attending classes.
|
OVERRIDE | | | 1/29/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 1/29/2018 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 12/6/2017 | 12/6/2017 | 1/26/2018 | | PASS |
Brian McGowan
|
|
|
1/15 resubmittal due 1st review complete - 12/25 sfd Townhome L2 ePlan
|
Routing - Design Review | 1/26/2018 | | 1/26/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - PLAN CHECK | 1/26/2018 | | 1/26/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/26/2018 | | DONE |
|
|
|
|
Routing - Design Review | 1/22/2018 | | 1/22/2018 | | FAIL |
Andrea Tuning
|
|
|
Submit a common wall agreement for the shared wall between the residence and the garage units.
|
Routing - PLAN CHECK | 1/16/2018 | | 1/16/2018 | | FAIL |
Brian McGowan
|
|
|
Did not make corrections for a Townhome
|
Routing - Design Review | 1/11/2018 | | 1/11/2018 | | FAIL |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 1/11/2018 | | 1/11/2018 | | FAIL |
Brian McGowan
|
|
|
Documents need to be uploaded correctly.
|
Routing - PLAN CHECK | 12/6/2017 | | 12/22/2017 | | FAIL |
Brian McGowan
|
|
|
Structural and fire rated wall issues
|
1st review completed | | | 12/22/2017 | | FAIL |
Brian McGowan
|
|
|
Structural and fire rated wall issues
|
Route to Impact Fee Review | 12/6/2017 | 12/9/2017 | 12/7/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 12/6/2017 | | 12/7/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 12/6/2017 | | 12/6/2017 | | FAIL |
Andrea Tuning
|
|
|
Close the existing driveway that intersects Robert Street with standard vertical curb, gutter and sidewalk to match the surrounding improvements.
Landscape the front yard up to the sidewalk on Robert Street.
Subbmit a common wall agreement for the shared wall between the residential units and the garages.
|
Routing - Addressing | 12/6/2017 | | 12/6/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/6/2017 | | 12/6/2017 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/6/2017 | | DONE |
|
|
|
|
Intake Approval | | | 12/6/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/6/2017 | | DONE |
|
|
|
|
Application received | | | 12/1/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 1 2017 6:47PM
|