BLD-Final | 3/19/2019 | 3/20/2019 | 3/20/2019 | A | PASS |
Brandon Shaw
|
|
|
Marian Phone #: ###-####
|
DOC - Permit Finaled | 3/20/2019 | 3/20/2019 | 3/20/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 8/23/2018 | 8/23/2018 | 8/23/2018 | | DEFR |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Aging Inspection | 8/22/2018 | 8/22/2018 | 8/22/2018 | | DONE |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Framing/Rough-in | 4/9/2018 | 4/10/2018 | 4/10/2018 | P | PASS |
Brandon Shaw
|
|
|
Lonn Phone #: ###-####
|
BLD-Framing/Rough-in | 2/28/2018 | 3/1/2018 | 3/2/2018 | P | NR |
Brandon Shaw
|
|
|
Framing OK, need plumbing rough in
|
BLD-Other | 2/6/2018 | 2/7/2018 | 2/7/2018 | P | PASS |
Brandon Shaw
|
|
|
Wall brace
|
BLD-Wall Bracing | 1/30/2018 | 1/30/2018 | 1/30/2018 | P | PART |
Brandon Shaw
|
|
|
Hold downs in place, sheathing to be checked at framing rough in
|
BLD-Framing/Rough-in | 1/29/2018 | 1/30/2018 | 1/30/2018 | P | CANC |
Brandon Shaw
|
|
|
r./i and shear // Lonn Leitch Phone #: ###-####
|
BLD-Foundation | 1/3/2018 | 1/4/2018 | 1/4/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
Routing Walk-In (BLD) | 12/12/2017 | 12/12/2017 | 12/12/2017 | P | DONE |
Josh Bogle
|
|
|
|
Routing Walk-In (BLD) | 12/11/2017 | 12/11/2017 | 12/12/2017 | P | FAIL |
Brian McGowan
|
|
|
See notes with plans, I'm not sure what Josh required last time.
|
Routing - PLAN CHECK | 12/12/2017 | | 12/12/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 12/12/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 12/12/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/12/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 12/12/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/12/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 12/4/2017 | 12/4/2017 | 12/4/2017 | A | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 12/4/2017 | 12/4/2017 | 12/4/2017 | A | FAIL |
Josh Bogle
|
|
|
needs more detail
|
Routing - PLAN CHECK | 12/4/2017 | | 12/4/2017 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 12/4/2017 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 12/4/2017 | | | |
|
|
|
|