Permit Information
Permit NumberBLD17-04408
StatusFinaled
Name CANYON CREST HOMES
Site Address 4004 N GOSHAWK PL
Project Name8-4 Eyrie Canyon
Customer Number 
ePlanReviewYes
Description
**PLAN MODIFICATION TO INCREASE THE HEIGHT OF THE RETAINING WALL** Permit for the construction of a new 3,163 sq. ft., two story (first story 2,353 sq. ft., second story 810 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 614 sq. ft. of covered patio/porch and a 958 sq. ft. attached garage per the approved plans and any notations. A-1 zoning and setbacks per planning. This structure shall comply with BMC 7-01-69 for WUI zone "A" which includes maintaining a minimum 30 feet of defensible space from structure to undeveloped land. Prescriptive Energy. ***RDP***
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/17/20187/18/20187/18/2018PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by David Wipper
DOC - Permit Finaled7/18/20187/18/20187/18/2018PPASS
DetailsTony Young
PubWorks Occupancy Approval7/18/20187/18/20187/18/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
OVERRIDE  7/16/2018  
Plan assigned to (RDP)7/12/20187/12/20187/16/2018 DONE
DetailsRob Patrick
Plan Mod - retaining wall (grading plan) update. Installed retaining wall higher than originally proposed. Route to BLD & PW
Routing - PLAN CHECK7/12/2018 7/16/2018 PASS
DetailsRob Patrick
CHANGE STATUS TO (ISS)  7/16/2018 DONE
Plan Mod
Inspection Record Card- Bld  7/16/2018 DONE
Routing PW Grading-Hillside7/12/2018 7/16/2018 PASS
DetailsMelissa Jannusch
Plan modification to retaining wall approved
PLANS/APPL TAKEN TO FRONT DESK  7/16/2018 DONE
Permit Ready to Issue  7/16/2018 DONE
plan mod so please do not re issue
Routing - PUBLIC WORKS7/12/2018 7/12/2018 PASS
DetailsMorgan Webb
Plan Modification Accepted  7/12/2018 DONE
Retaining wall (grading plan) update. Installed retaining wall higher than originally proposed. Route to BLD & PW
BLD-Wall cover5/11/20185/11/20185/11/2018PPART
DetailsTony Young
Please inspect fire rated soffit at exterior eves Phone #: ###-#### Inspection requested via web by David Wipper,, work in progress,, ok so far
BLD-Wall cover5/1/20185/2/20185/2/2018ANR
DetailsTony Young
Progress inspection for fire rated exterior soffit Phone #: ###-#### Inspection requested via web by David Wipper
BLD-Wall cover4/30/20185/1/20185/1/2018ANR
DetailsTony Young
Progress inspection for fire rated exterior soffit Phone #: ###-#### Inspection requested via web by David Wipper,, no work has been started on the soffits
BLD-Wall Bracing4/19/20184/19/20184/19/2018PPASS
DetailsTony Young
INTERIOR OSB SHEAR INSPECTION Phone #: ###-#### Inspection requested via web by David Wipper
BLD-Energy code compliance4/18/20184/18/20184/18/2018PPART
DetailsTony Young
Larry Phone #: ###-####,, need a soffit and possibly an interior shear inspection,, ok to cover interior
BLD-Framing/Rough-in4/16/20184/16/20184/17/2018PPASS
DetailsDave Hannah
Larry Phone #: ###-#### ok to insulate but needs fire place rough in
Plan Modification Accepted  4/6/2018 DONE
revised acca report
Routing - MECHANICAL4/6/2018 4/6/2018 PASS
DetailsChad Schwendiman
revised acca report
BLD-Wall Bracing4/3/20184/4/20184/4/2018APASS
DetailsTony Young
Larry Phone #: ###-####,, exterior ok
BLD-Wall Bracing4/3/20184/3/20184/3/2018PNR
DetailsTony Young
Larry Phone #: ###-####,, need to redo some areas
BLD-Foundation2/12/20182/13/20182/13/2018PPART
DetailsTony Young
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo,, work in progress
BLD-Foundation2/12/20182/13/20182/12/2018PCANC
DetailsTony Young
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Inspection cancelled via mobile web on Monday, February 12, 2018.
BLD-Footing2/9/20182/12/20182/12/2018PPART
DetailsTony Young
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo,, work in progress,, ok
PubWorks Subgrade Approval2/9/20182/9/20182/9/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Issue PAID IN FULL permit  2/1/2018 DONE
Inspection Record Card- Bld  2/1/2018 DONE
OVERRIDE  1/30/2018  
Plan assigned to (RDP)1/3/20181/3/20181/30/2018 DONE
DetailsRob Patrick
1st review completed 1/22 sfd L2 ePlan
1/11 Failed
PLANS/APPL TAKEN TO FRONT DESK  1/30/2018 DONE
DetailsRob Patrick
Permit Ready to Issue  1/30/2018 DONE
Waiting for unresolved changed marks to be fixed
Routing PW Grading-Hillside1/29/2018 1/29/2018 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
Routing - PLAN CHECK1/23/2018 1/23/2018 PASS
DetailsRob Patrick
Routing - PLAN CHECK1/3/2018 1/11/2018 FAIL
DetailsRob Patrick
1st review completed  1/11/2018 FAIL
DetailsRob Patrick
Fire needs to review plan.
Plan Reviewer's activity  1/11/2018 FAIL
DetailsRob Patrick
Routing PW Grading-Hillside1/3/2018 1/9/2018 FAIL
DetailsJason C. Taylor
see changemarks for details. JCT
Routing - FIRE1/3/20181/3/20181/5/2018 PASS
DetailsScott Arellano
This structure shall comply with BMC 7-01-69 for WUI zone "A" which includes maintaining a minimum 30 feet of defensible space from structure to undeveloped land.
Route to Impact Fee Review1/3/20181/6/20181/4/2018 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PLANNING1/3/2018 1/4/2018 PASS
DetailsSusan Riggs
Sue cummings reviewed permit
Routing - Addressing1/3/2018 1/3/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/3/2018 1/3/2018 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment1/3/2018 1/3/2018 PASS
DetailsAndy J. Long
ESC plan approved. Certified RP designated. Site preparation inspection required.
Routing - MECHANICAL1/3/2018 1/3/2018 PASS
DetailsChad Schwendiman
Plans ACCEPTED BY PLAN TECH  1/3/2018 DONE
Recd Pcfee & Taken To Pln CK  1/3/2018 DONE
Intake Approval  1/3/2018 PASS
Intake Approval  12/27/2017 FAIL
CFH17-00070 Must wait until appeal period has been satisfied on January 2, 2018 at 5:00pm
Intake Approval  12/15/2017 FAIL
DetailsChristina Prado
CFH17-00070 applied for, but not yet approved. Must wait until approval and appeal period are satisfied to start review
Intake Approval  12/5/2017 FAIL
Application #114 will need to be filled out and turned in to the Planning & Zoning. Once the application has been approved by P&Z please upload the approval letter and then this building permit case can be routed for approval.
Application received  12/4/2017 DONE
Application submitted via PDS Online on Dec 4 2017 3:36PM