BLD-Final | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | PASS |
Brandon Shaw
|
|
|
Please call for access. Phone #: ###-#### Inspection requested via web by Damion Jordan
|
DOC - Permit Finaled | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Wall cover | 6/7/2018 | 6/8/2018 | 6/8/2018 | P | PASS |
Jim Storey
|
|
|
Damion--as late as possible Phone #: ###-####
|
BLD-Conference | 6/5/2018 | 6/6/2018 | 6/6/2018 | A | PASS |
Jim Storey
|
|
|
Bob Phone #: ###-####
|
BLD-Framing/Rough-in | 6/5/2018 | 6/6/2018 | 6/6/2018 | A | PART |
Jim Storey
|
|
|
Bob Phone #: ###-#### exstened fire wall thur soffit front and back.
|
BLD-Framing/Rough-in | 6/4/2018 | 6/5/2018 | 6/5/2018 | P | DEFR |
Jim Storey
|
|
|
Bob Phone #: ###-####
|
Plan Modification Accepted | | | 5/15/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 5/15/2018 | | 5/15/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Footing | 3/6/2018 | 3/6/2018 | 3/6/2018 | P | PASS |
Jim Storey
|
|
|
Call for plans- Dave Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/8/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/8/2018 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 1/30/2018 | | DONE |
Brian McGowan
|
|
|
Carl did the final Plan Check for the resubmitted drawings on the Changemarks I requested since I was in Fort Hall attending classes.
|
OVERRIDE | | | 1/29/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 1/29/2018 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 12/6/2017 | 12/6/2017 | 1/26/2018 | | DONE |
Brian McGowan
|
|
|
1/15 resubmittal due. 1st review complete - 12/25 sfd Townhome L2 ePlan
|
Routing - Design Review | 1/26/2018 | | 1/26/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - PLAN CHECK | 1/26/2018 | | 1/26/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/26/2018 | | DONE |
|
|
|
|
Routing - Design Review | 1/22/2018 | | 1/22/2018 | | FAIL |
Andrea Tuning
|
|
|
Submit a common wall agreement for the shared wall between the residence and the garage units.
|
Routing - PLAN CHECK | 1/16/2018 | | 1/16/2018 | | FAIL |
Brian McGowan
|
|
|
Did not make corrections for a Townhome
|
Routing - PLAN CHECK | 1/11/2018 | | 1/11/2018 | | FAIL |
Brian McGowan
|
|
|
Documents need to be uploaded correctly.
|
Routing - MECHANICAL | 12/6/2017 | | 12/26/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 12/6/2017 | | 12/22/2017 | | FAIL |
Andrea Tuning
|
|
|
Close the existing driveway that intersects Robert Street with standard vertical curb, gutter and sidewalk to match the surrounding improvements.
Landscape the front yard up to the sidewalk on Robert Street.
Subbmit a common wall agreement for the shared wall between the residential units and the garages.
|
1st review completed | | | 12/22/2017 | | FAIL |
Brian McGowan
|
|
|
Structural and fire rated wall issues
|
Routing - PLAN CHECK | 12/6/2017 | | 12/22/2017 | | FAIL |
Brian McGowan
|
|
|
Structural and fire rated wall issues
|
Route to Impact Fee Review | 12/7/2017 | 12/10/2017 | 12/8/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | 12/6/2017 | | 12/6/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 12/6/2017 | | 12/6/2017 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/6/2017 | | DONE |
|
|
|
|
Intake Approval | | | 12/6/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/6/2017 | | DONE |
|
|
|
|
Application received | | 12/6/2017 | | | |
|
|
|
|
Application received | | 12/6/2017 | | | |
|
|
|
|