First Notice | | 8/19/2018 | 9/10/2018 | | DONE |
|
|
|
mailed 9-11-18
|
Permanent Occupancy | | | 8/9/2018 | | DONE |
|
|
|
|
BLD-Final | 8/8/2018 | 8/8/2018 | 8/8/2018 | A | PASS |
Jim Storey
|
|
|
|
BLD-Final | 6/14/2018 | 6/18/2018 | 6/18/2018 | A | PASS |
Jim Storey
|
|
|
Tim Phone #: ###-#### final ok pending ele
|
Temporary Occupancy | 6/18/2018 | 9/16/2018 | 6/18/2018 | | DONE |
Tiffany Carson-Herker
|
|
|
|
Zoning Approval | 6/18/2018 | 6/18/2018 | 6/18/2018 | | PASS |
Katelyn Menuge
|
|
|
|
FIRE-Final Inspection | 6/14/2018 | 6/15/2018 | 6/15/2018 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection complete.
Tim Phone #: ###-####
|
BLD-Final | 6/14/2018 | 6/14/2018 | 6/14/2018 | P | PART |
Jim Storey
|
|
|
Call prior to going Phone #: 2088634071 >> Inspection requested via mobile web by Dave Minegar
|
FIRE-Final Inspection | 6/14/2018 | 6/14/2018 | 6/14/2018 | P | FAIL |
Jim Page
|
|
|
FIR permit for fire alarms needs to be finaled, contractor for HVAC control was not able to be contacted at time of inspection, a re-inspection will be required for fire alarm to final FIR permit.
Dave Phone #: ###-####
|
FIRE-Conference | 6/5/2018 | 6/6/2018 | 6/6/2018 | A | DONE |
Jim Page
|
|
|
Fire conference complete.
John ---look at fire dept access Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Jim Storey
|
|
|
John Phone #: ###-#### ceilling ok to cover.
|
BLD-Conference | 4/6/2018 | 4/6/2018 | 4/6/2018 | A | PASS |
Jim Storey
|
|
|
fire stopping at fire pump room ok
|
BLD-Framing/Rough-in | 3/20/2018 | 3/26/2018 | 3/26/2018 | A | PASS |
Jim Storey
|
|
|
John-Layton Phone #: ###-#### rfi for plm hole sizing center bearing wall/ deck screw ok
|
Issue PAID IN FULL permit | | | 2/28/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/28/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/28/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/28/2018 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 12/12/2017 | 12/12/2017 | 2/26/2018 | | PASS |
Carl Westfall
|
|
|
(2nd done) (Dec 29 - 15 days) (38 sheets) Applied Materials and Testing
|
Routing PW Sewer Design | 2/16/2018 | | 2/26/2018 | | PASS |
Mike Sheppard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/26/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/26/2018 | | |
|
|
|
ALL MET-NEED ACHD
met-GC FORM
met-REVISE CERT
|
Routing - PLUMBING | 2/16/2018 | | 2/21/2018 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Plan resubmittals received | | | 2/16/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/16/2018 | | 2/16/2018 | | PASS |
Carl Westfall
|
|
|
|
Route to Impact Fee Review | 2/10/2018 | 2/13/2018 | 2/13/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 2/10/2018 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 2/10/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/12/2017 | | 2/10/2018 | | FAIL |
Carl Westfall
|
|
|
|
Routing PW Sewer Design | 12/12/2017 | | 1/4/2018 | | FAIL |
Mike Sheppard
|
|
|
|
Routing Off Site - STRUCTURAL | 12/12/2017 | | 12/21/2017 | | PASS |
Carl Westfall
|
|
|
Chris Holladay
|
Routing - FIRE | 12/12/2017 | 12/12/2017 | 12/19/2017 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing PW Environmental | 12/12/2017 | | 12/18/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Solid Waste | 12/12/2017 | | 12/14/2017 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Street Lights | 12/12/2017 | | 12/13/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing - Erosion and Sediment | 12/12/2017 | | 12/13/2017 | | PASS |
Andy J. Long
|
|
|
Construction in this building covered under active ESC permit for Gowen Industrial Park (ESC17-01200, ESC17-01043). No new ESC permit required.
|
Routing - MECHANICAL | 12/12/2017 | | 12/13/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 12/12/2017 | | 12/13/2017 | | FAIL |
Bill VanDegrift
|
|
|
ISPC 407.3 mixing valve to lavs must be ASSE 1070 listed
|
Routing - Addressing | 12/12/2017 | | 12/12/2017 | | PASS |
Doug Chausow
|
|
|
Per request, added Ste 110
|
Routing - PUBLIC WORKS | 12/12/2017 | | 12/12/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - Design Review | 12/12/2017 | | 12/12/2017 | | PASS |
Katelyn Menuge
|
|
|
Office use approved through CUP17-00079. Appeal period ends 12-15-17.
|
Intake Approval | | | 12/12/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Julie completed pre screen
|
Routing PW Drainage | 12/12/2017 | | 12/12/2017 | | PASS |
Brian Murphy
|
|
|
SEE APPROVAL OFGRADING PLAN ODI3663
|
Application received | | | 12/7/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 7 2017 1:12PM
|