Permit Information
Permit NumberBLD17-04457
StatusFinaled
Name LAYTON CONSTRUCTION
Site Address 6675 S EISENMAN RD Unit: 110
Project NameApplied Materials and Testing
Customer Number 
ePlanReviewYes
Description
(APPLIED MATERIALS AND TESTING – OFFICE AND WAREHOUSE) (DRH17-00567) (CUP17-00079) The fire sprinkler system is used for building area increase and for fire area. To create a 20,341 square foot office and warehouse tenant space within an existing 41,146 square foot building constructed under permit BLD17-02765. Work is to include interior nonbearing walls, two multi-user toilet/shower rooms accessible to the disabled, a single user toilet room accessible to the disabled, interior doors, interior windows, suspended acoustical ceilings, millwork, and finishes. A mechanical mezzanine accessed only by a ladder will be constructed within this building above the restrooms. Work related to the mezzanine includes thickened concrete floor slabs below bearing walls, steel stud bearing walls, sheet steel shear walls, and a concrete mezzanine floor on a steel pan deck. An exterior pedestrian ramp accessible to the disabled and an exterior vehicular ramp will also be constructed. Work related to the ramps includes concrete footings, concrete stem walls, concrete floor slab, steel guards, and steel handrails. Several exterior tilt-up concrete wall panels have been redesigned from what was proposed under the shell permit. The new panels have more openings in the East and South exterior walls. Special Inspection is required for concrete tilt-up panels (including reinforcing steel), anchors post-installed in hardened concrete, and steel (including welding). A separate permit is required for racks that are over 8 feet tall. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 8/19/20189/10/2018 DONE
mailed 9-11-18
Permanent Occupancy  8/9/2018 DONE
BLD-Final8/8/20188/8/20188/8/2018APASS
DetailsJim Storey
BLD-Final6/14/20186/18/20186/18/2018APASS
DetailsJim Storey
Tim Phone #: ###-#### final ok pending ele
Temporary Occupancy6/18/20189/16/20186/18/2018 DONE
DetailsTiffany Carson-Herker
Zoning Approval6/18/20186/18/20186/18/2018 PASS
DetailsKatelyn Menuge
FIRE-Final Inspection6/14/20186/15/20186/15/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection complete.

Tim Phone #: ###-####
BLD-Final6/14/20186/14/20186/14/2018PPART
DetailsJim Storey
Call prior to going Phone #: 2088634071 >> Inspection requested via mobile web by Dave Minegar
FIRE-Final Inspection6/14/20186/14/20186/14/2018PFAIL
DetailsJim Page
FIR permit for fire alarms needs to be finaled, contractor for HVAC control was not able to be contacted at time of inspection, a re-inspection will be required for fire alarm to final FIR permit.

Dave Phone #: ###-####
FIRE-Conference6/5/20186/6/20186/6/2018ADONE
DetailsJim Page
Fire conference complete.

John ---look at fire dept access Phone #: ###-####
BLD-Ceiling Grid Inspection4/30/20184/30/20184/30/2018PPASS
DetailsJim Storey
John Phone #: ###-#### ceilling ok to cover.
BLD-Conference4/6/20184/6/20184/6/2018APASS
DetailsJim Storey
fire stopping at fire pump room ok
BLD-Framing/Rough-in3/20/20183/26/20183/26/2018APASS
DetailsJim Storey
John-Layton Phone #: ###-#### rfi for plm hole sizing center bearing wall/ deck screw ok
Issue PAID IN FULL permit  2/28/2018 DONE
Print Occupancy Form  2/28/2018 DONE
Print Occupancy Form  2/28/2018 DONE
(F) Reprint permit  2/28/2018 DONE
Plan assigned to (CJW)12/12/201712/12/20172/26/2018 PASS
DetailsCarl Westfall
(2nd done) (Dec 29 - 15 days) (38 sheets) Applied Materials and Testing
Routing PW Sewer Design2/16/2018 2/26/2018 PASS
DetailsMike Sheppard
PLANS/APPL TAKEN TO FRONT DESK  2/26/2018 DONE
Permit Ready to Issue  2/26/2018  
ALL MET-NEED ACHD
met-GC FORM
met-REVISE CERT
Routing - PLUMBING2/16/2018 2/21/2018 PASS
DetailsBill VanDegrift
per plans and ISPC
Plan resubmittals received  2/16/2018 DONE
Routing - PLAN CHECK2/16/2018 2/16/2018 PASS
DetailsCarl Westfall
Route to Impact Fee Review2/10/20182/13/20182/13/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  2/10/2018 DONE
Plan resubmittals requested  2/10/2018 DONE
Routing - PLAN CHECK12/12/2017 2/10/2018 FAIL
DetailsCarl Westfall
Routing PW Sewer Design12/12/2017 1/4/2018 FAIL
DetailsMike Sheppard
Routing Off Site - STRUCTURAL12/12/2017 12/21/2017 PASS
DetailsCarl Westfall
Chris Holladay
Routing - FIRE12/12/201712/12/201712/19/2017 PASS
DetailsErika Akin
Attached comments to case
Routing PW Environmental12/12/2017 12/18/2017 PASS
DetailsRick Christenson
Routing PW Solid Waste12/12/2017 12/14/2017 PASS
DetailsEvan Carpenter
Routing PW Street Lights12/12/2017 12/13/2017 PASS
DetailsTom Marshall
Routing - Erosion and Sediment12/12/2017 12/13/2017 PASS
DetailsAndy J. Long
Construction in this building covered under active ESC permit for Gowen Industrial Park (ESC17-01200, ESC17-01043). No new ESC permit required.
Routing - MECHANICAL12/12/2017 12/13/2017 PASS
DetailsTroy James
Routing - PLUMBING12/12/2017 12/13/2017 FAIL
DetailsBill VanDegrift
ISPC 407.3 mixing valve to lavs must be ASSE 1070 listed
Routing - Addressing12/12/2017 12/12/2017 PASS
DetailsDoug Chausow
Per request, added Ste 110
Routing - PUBLIC WORKS12/12/2017 12/12/2017 PASS
DetailsMorgan Webb
Routing - Design Review12/12/2017 12/12/2017 PASS
DetailsKatelyn Menuge
Office use approved through CUP17-00079. Appeal period ends 12-15-17.
Intake Approval  12/12/2017 PASS
DetailsAdele J Schaffeld-Griffin
Julie completed pre screen
Routing PW Drainage12/12/2017 12/12/2017 PASS
DetailsBrian Murphy
SEE APPROVAL OFGRADING PLAN ODI3663
Application received  12/7/2017 DONE
Application submitted via PDS Online on Dec 7 2017 1:12PM