Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-04459
StatusFinaled
Name PRESTIGE HOMES INC
Site Address 2625 S GATEWOOD LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 1702 sq. ft. Townhouse with 3 bedrooms, 2 bathrooms, approximately 208 sq. ft. of covered patio/porch and a 530 sq. ft. attached garage per the approved plans, notations, engineering, & local code. R-1A zoning and setbacks per planning. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/16/20198/22/20198/22/2019APASS
DetailsMike Jordan
Garage code 0813. Thank you Mike! Scott Phone #: ###-#### Inspection requested via web by Scott Zierler
DOC - Permit Finaled8/22/20198/22/20198/22/2019PPASS
DetailsMike Jordan
BLD-Blower Door Test Results8/22/20198/22/20198/22/2019ADONE
DetailsMike Jordan
4.0
Letter of compliance/Occupancy  8/22/2019 DONE
BLD-Energy code compliance5/13/20195/14/20195/14/2019APASS
DetailsMike Jordan
Thanks! Phone #: ###-#### Inspection requested via web by Scott Zierler
BLD-Framing/Rough-in5/9/20195/10/20195/10/2019APASS
DetailsMike Jordan
Plans will be on the fireplace like next door. Sorry I couldnt have it ready at the same time as the other. Thanks!
Scott Phone #: ###-#### Inspection requested via web by Scott Zierler
BLD-Wall Bracing4/4/20194/5/20194/5/2019PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Foundation8/23/20188/24/20188/24/2018APASS
DetailsMike Jordan
As early as possible Phone #: 2089495359 >> Inspection requested via mobile web by Aggregate construction Ri
BLD-Footing8/14/20188/15/20188/15/2018APASS
DetailsDave Hannah
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
Issue PAID IN FULL permit  1/25/2018 DONE
OVERRIDE  1/12/2018  
Inspection Record Card- Bld  1/12/2018 DONE
Telephone call  1/12/2018 DONE
called Scott to let know permit is ready and how much is owed-left message on his voice mail
Case Summary (BLD)  1/12/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  1/12/2018  
Plan assigned to (JAB) Josh12/22/201712/22/20171/11/2018 PASS
DetailsJosh Bogle
1st done - missing just one 2hr wall detail
Plan resubmittals received  1/11/2018 DONE
2 copy of each A-3 foundation plan, A-3a foundation plan, A-4 Floor plan and A-5 Truss plan. Stamped and taken to JAB
Routing - PLAN CHECK1/11/2018 1/11/2018 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  1/11/2018 DONE
DetailsJosh Bogle
1st review completed  12/22/2017 FAIL
DetailsJosh Bogle
Plan assigned to (BJM)12/7/2017 12/22/2017 DEFR
DetailsBrian McGowan
12/27 Townhome L2 paper
Routing - PLAN CHECK12/8/2017 12/22/2017 FAIL
DetailsJosh Bogle
Route to Impact Fee Review12/7/201712/10/201712/8/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL  12/8/2017 PASS
DetailsTroy James
Routing - PLANNING12/8/2017 12/8/2017 PASS
DetailsJeff Lowe
setback to garage to be 20FT
Routing - Addressing12/7/2017 12/8/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS  12/8/2017 PASS
Plans ACCEPTED BY PLAN TECH  12/7/2017 DONE
DetailsChristina Prado
Intake Approval  12/7/2017 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  12/7/2017 DONE
DetailsChristina Prado
Application received 12/7/2017