Letter of compliance/Occupancy | | | 8/14/2019 | | DONE |
|
|
|
|
BLD-Final | 8/13/2019 | 8/13/2019 | 8/13/2019 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 8/13/2019 | 8/13/2019 | 8/13/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 8/13/2019 | 8/13/2019 | 8/13/2019 | P | DONE |
Mike Jordan
|
|
|
4.0
|
BLD-Final | 8/8/2019 | 8/9/2019 | 8/9/2019 | P | FAIL |
Mike Jordan
|
|
|
Garage code 0813 Phone #: ###-#### Inspection requested via web by Scott Zierler. Provide Blower door test results. everything else ok.
|
BLD-Energy code compliance | 3/29/2019 | 3/29/2019 | 4/1/2019 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 3/29/2019 | 3/29/2019 | 3/29/2019 | P | PASS |
Jim Sly
|
|
|
Actual energy code inspection this time! Insulators will be there at noon today. Hope we can wait until later PM for inspection. Thank you. Scott Phone #: ###-#### Inspection requested via web by Scott Zierler Previous inspection should have been framing insp. Mike passed that.......
|
BLD-Energy code compliance | 3/28/2019 | 4/1/2019 | 3/29/2019 | A | CANC |
Mike Jordan
|
|
|
Thanks. This time it is actually for the energy code inspection! Walls are to be insulated 3/29/19. Phone #: ###-#### >> Inspection requested via web by Scott Zierler Inspection cancelled from web by: Scott Zierler
|
BLD-Energy code compliance | 3/27/2019 | 3/28/2019 | 3/28/2019 | A | PASS |
Mike Jordan
|
|
|
Thank you. Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD-Other | 3/20/2019 | 3/20/2019 | 3/20/2019 | P | PASS |
Mike Jordan
|
|
|
Inspection of insulation in common wall between units. Thanks! Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD-Other | 3/1/2019 | 3/4/2019 | 3/4/2019 | A | PASS |
Mike Jordan
|
|
|
Inspection of rated soffits. Thanks. Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD-Wall Bracing | 2/5/2019 | 2/6/2019 | 2/6/2019 | A | PASS |
Jim Sly
|
|
|
Thanks! Phone #: ###-#### Inspection requested via web by Scott Zierler Exterior nailing only.....OK.
|
BLD-Other | 1/18/2019 | 1/22/2019 | 1/22/2019 | A | PASS |
Jim Sly
|
|
|
Inspection of fire wall Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD-Foundation | 5/16/2018 | 5/17/2018 | 5/17/2018 | P | PART |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira
|
BLD-Footing | 5/15/2018 | 5/16/2018 | 5/16/2018 | P | PART |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Lira
|
Issue PAID IN FULL permit | | | 1/25/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 1/12/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 12/22/2017 | 12/22/2017 | 1/12/2018 | | PASS |
Josh Bogle
|
|
|
1st done - townhouse, need one 2hr detail
|
Inspection Record Card- Bld | | | 1/12/2018 | | DONE |
|
|
|
|
Telephone call | | | 1/12/2018 | | DONE |
|
|
|
called Scott to let know permit is ready and how much is owed-left message on his voice mail
|
Routing - PLAN CHECK | 1/12/2018 | | 1/12/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/12/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 1/12/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 1/12/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/11/2018 | | DONE |
|
|
|
2 copies of A-3 Foundation Plan, A-3a foundation plan, A-4 Floor plan andA-5 Truss plan. Stamped and taken to JAB
|
1st review completed | | | 12/22/2017 | | FAIL |
Josh Bogle
|
|
|
|
Plan assigned to (BJM) | 12/7/2017 | | 12/22/2017 | | DEFR |
Brian McGowan
|
|
|
12/27 Townhome L2 paper
|
Routing - PLAN CHECK | 12/8/2017 | | 12/22/2017 | | FAIL |
Josh Bogle
|
|
|
|
Route to Impact Fee Review | 12/7/2017 | 12/10/2017 | 12/8/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 12/8/2017 | | 12/8/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 12/8/2017 | | 12/8/2017 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 12/7/2017 | | 12/8/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | | | 12/8/2017 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/7/2017 | | DONE |
|
|
|
|
Intake Approval | | | 12/7/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/7/2017 | | DONE |
|
|
|
|
Application received | | 12/7/2017 | | | |
|
|
|
|