Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD17-04469
StatusFinaled
Name DAVID HIGHTOWER
Site Address 3139 E BOISE AVE
Project NameHightower Addition
Customer Number 
ePlanReviewYes
Description
MODIFICATION TO PLAN ADDS 40SQ' TO THE GARAGE AND 32SQ' TO THE MUD ROOM **jab** Permit for a foundation (placing a moved home on the foundation) & the addition of a garage and mudroom. All work per plans, engineering, & local code. Separate electrical, plumbing, & mechanical permits required. **JAB**

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor 208-608-7171.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Jason Taylor 208-608-7171.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/4/201910/4/201910/4/2019PPASS
DetailsBrandon Shaw
DOC - Permit Finaled10/4/201910/4/201910/4/2019PPASS
DetailsBrandon Shaw
BLD-Conference8/30/20199/6/20199/6/2019AFAIL
DetailsBrandon Shaw
Need Mech final...
BLD-Final8/22/20199/6/20199/6/2019PCANC
DetailsBrandon Shaw
Dave Phone #: ###-####
Routing Walk-In (BLD)8/22/20198/22/20198/22/2019PPASS
DetailsJosh Bogle
question on code for stair railing
BLD-Aging Inspection6/18/20196/18/20196/18/2019 PASS
DetailsJim Storey
BLD-Framing/Rough-in2/4/20192/4/20192/4/2019PPASS
DetailsJim Storey
David Phone #: ###-#### garage and utilty rm ok to insulate.
BLD-Wall Bracing11/19/201811/19/201811/19/2018PPASS
DetailsDave Hannah
shear // david or ###-#### luke Phone #: ###-####
Routing - MECHANICAL9/10/2018 9/10/2018 PASS
DetailsTroy James
manual j report
BLD-Foundation7/16/20187/17/20187/17/2018PPASS
DetailsJim Storey
Chuck Phone #: ###-####
BLD-Foundation7/10/20187/11/20187/11/2018APASS
DetailsJim Storey
please call with inspection results // Chuck Phone #: ###-####
CHANGE STATUS TO (ISS)  6/18/2018 DONE
(F) Reprint permit  6/18/2018 DONE
OVERRIDE  6/14/2018  
Plan assigned to (JAB) Josh6/5/20186/5/20186/14/2018 PASS
DetailsJosh Bogle
Plan Mod - extend square footage of garage/mud
Routing - PLAN CHECK6/6/2018 6/14/2018 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  6/14/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  6/14/2018 DONE
plan mod-please do not re issue
Routing PW Grading-Hillside6/6/2018 6/13/2018 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
BLD-Foundation6/5/20186/6/20186/6/2018APASS
DetailsJim Storey
wall- late morning- Chuck Phone #: ###-####
Routing - PLANNING6/6/2018 6/6/2018 PASS
DetailsJeff Lowe
version 2 of the site plan appears to be the same as approved previously
Plan Modification Accepted  6/5/2018  
DetailsChristina Prado
Plan Mod requested - extend square footage of garage/mud
BLD-Foundation5/21/20185/22/20185/22/2018APART
DetailsJim Storey
late morning- Chuck Phone #: ###-#### ft ok pending public works aproval
Routing Walk-In (BLD)5/21/20185/21/20185/21/2018PPASS
DetailsJosh Bogle
Case Summary (BLD)  5/18/2018 DONE
Case Summary (BLD)  5/18/2018 DONE
PubWorks Subgrade Approval5/16/20185/16/20185/16/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Fees Due Hold1/25/2018 3/9/2018 DONE
DetailsTisha Gallop
Telephone call  1/24/2018 DONE
1/24/18 10AM: Called David and spoke to him about balance on project. ACH and PRK impact fees missed, have balance on project of $5524.42. Balance must be paid prior to any inspections. He said will pay as soon as possible, will come in with check. Please give him inspection card and explain insp process to him when he comes in.
Telephone call  1/24/2018 DONE
1/24/18 2:30PM; left vm for David new balance including energy code insp fee is $5551.98. Also emailed him new balance and fee breakdown. (per Josh B. energy is yes)
Telephone call  1/18/2018 DONE
emailed the building permit again to be signed
(F) Reprint permit  1/18/2018 DONE
Issue PAID IN FULL permit  1/16/2018 DONE
Inspection Record Card- Bld  1/16/2018 DONE
OVERRIDE  1/11/2018  
Plan assigned to (JAB) Josh12/12/201712/12/20171/11/2018 PASS
DetailsJosh Bogle
1st done - need foundation engineering, Hillside
Routing PW Grading-Hillside1/3/2018 1/11/2018 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Jason Taylor ###-####.
Routing - PLAN CHECK1/3/2018 1/11/2018 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  1/11/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  1/11/2018 DONE
ALL MET 1-16-18
Need
GC form
RP
Routing PW Grading-Hillside1/2/2018 1/3/2018 FAIL
DetailsJason C. Taylor
see changemarks on grading plan. JCT
Routing - PLAN CHECK1/2/2018 1/3/2018 FAIL
DetailsJosh Bogle
good for structural, failed cycle with grading
Routing - PLANNING1/2/2018 1/2/2018 PASS
DetailsJeff Lowe
version 2 site plan approved
Routing PW Grading-Hillside12/12/2017 12/19/2017 FAIL
DetailsJason C. Taylor
see changemarks in eplan. JCT
1st review completed  12/19/2017 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK12/12/2017 12/15/2017 FAIL
DetailsJosh Bogle
will need foundation engineering
Routing - PLANNING12/12/2017 12/12/2017 FAIL
DetailsJosh Bogle
eaves cannot extend into setback by more than 2-feet
Routing - Erosion and Sediment12/12/2017 12/12/2017 PASS
DetailsMichael Zawacki
RP needed
Routing - PUBLIC WORKS12/12/2017 12/12/2017 PASS
DetailsRachael Beierle
Plans ACCEPTED BY PLAN TECH  12/12/2017 DONE
Recd Pcfee & Taken To Pln CK  12/12/2017 DONE
no fee taken at intake, 406
Intake Approval  12/12/2017 PASS
Intake Approval  12/11/2017 FAIL
Project grading plan needs revised. Cannot review a plan that has "Not for Construction" printed on it. also, a scale needs placed on the grading plan to make sure set backs have been met. Please upload revised grading plan. Jason Taylor ###-####
Application received  12/8/2017 DONE
Application submitted via PDS Online on Dec 8 2017 2:01AM