BLD-Final | 1/18/2018 | 1/19/2018 | 1/19/2018 | A | PASS |
Jim Sly
|
|
|
Final can be done at anytime. There are three of these right next to each other. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
DOC - Permit Finaled | 1/19/2018 | 1/19/2018 | 1/19/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Footing | 12/19/2017 | 12/20/2017 | 12/20/2017 | A | PASS |
Jim Sly
|
|
|
Footing inspection can be done at anytime tomorrow. Aaron will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
Issue PAID IN FULL permit | | | 12/11/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 12/8/2017 | | |
|
|
|
|
Application received | | | 12/8/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 8 2017 9:26AM
|
Plan assigned to (JAB) Josh | 12/8/2017 | 12/8/2017 | 12/8/2017 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 12/8/2017 | | 12/8/2017 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLANNING | 12/8/2017 | | 12/8/2017 | | PASS |
Sue Cummings
|
|
|
|
1st review completed | | | 12/8/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/8/2017 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 12/8/2017 | | DONE |
|
|
|
met
|
Plans ACCEPTED BY PLAN TECH | | | 12/8/2017 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/8/2017 | | DONE |
|
|
|
no fee taken at intake, 406
|
Intake Approval | | | 12/8/2017 | | PASS |
|
|
|
|