Second Notice | | 7/20/2018 | 9/6/2018 | | DONE |
|
|
|
mailed 9-10-18
|
Print Statement | | | 8/20/2018 | | DONE |
|
|
|
|
First Notice | | 6/29/2018 | 7/10/2018 | | DONE |
|
|
|
mailed 7-11-18
|
Permanent Occupancy | | | 6/19/2018 | | DONE |
|
|
|
|
BLD-Final | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PASS |
Dave Hannah
|
|
|
Clarence Phone #: ###-####-key lock code is 12340 and pull out for key on the inside and please put back
|
FIRE-Final Inspection | 6/15/2018 | 6/18/2018 | 6/18/2018 | A | PASS |
Jim Page
|
|
|
No fire sprinkler modifications, no fire alarm modifications, fire extinguisher is in place with a current inspection tag. Thumbturn deadbolt on main entry will be changed to a double key deadbolt before final BLD inspection. Final life fire safety inspection complete.
Call for access // Clearance Phone #: ###-####
|
BLD-Final | 6/14/2018 | 6/15/2018 | 6/18/2018 | P | NR |
Dave Hannah
|
|
|
Clarence Phone #: ###-####-key lock code is 12340 and pull out for key on the inside and please put back needs fire life safty
|
Issue PAID IN FULL permit | | | 2/16/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/16/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/16/2018 | | DONE |
|
|
|
|
Plan assigned to (JG) | 2/1/2018 | 2/1/2018 | 2/15/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, Mosses Coffee Shop, pend plumb and PW envior
|
Routing PW Environmental | 2/7/2018 | | 2/15/2018 | | PASS |
Rick Christenson
|
|
|
Grease trap shown
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/15/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/15/2018 | | DONE |
|
|
|
METNeed
GC Form-MET
(need revised value if Evergreen Construction is not the GC)
Evergreen is not the GC so we need the rev cert of val-MET
|
Telephone call | | | 2/15/2018 | | DONE |
|
|
|
emailed Chris that we need the GC form and attached the form. Told him he could send it back to myself or Tiffany
|
Routing - PLUMBING | 2/7/2018 | | 2/12/2018 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Route to Impact Fee Review | 2/7/2018 | 2/10/2018 | 2/7/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 2/7/2018 | | 2/7/2018 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 2/3/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 12/27/2017 | | 2/3/2018 | | FAIL |
Javier Guzman
|
|
|
|
Plan assigned to (CJW) | 12/27/2017 | 12/27/2017 | 2/1/2018 | | DEFR |
Carl Westfall
|
|
|
(Jan 11 - 15 days) (5 sheets) Mosses Coffee Shop
|
Routing - FIRE | 12/27/2017 | 12/27/2017 | 1/3/2018 | | PASS |
Scott Arellano
|
|
|
Attached comments to case
|
Routing PW Environmental | 12/27/2017 | | 12/29/2017 | | PASS |
Rick Christenson
|
|
|
Needs under the sink grease abatement.
|
Routing - PLUMBING | 12/27/2017 | | 12/28/2017 | | FAIL |
Bill VanDegrift
|
|
|
provide a code compliant plumbing plan by a licensed engineer
|
Routing - PLANNING | 12/27/2017 | | 12/27/2017 | | PASS |
Leon Letson
|
|
|
|
Routing - Addressing | 12/27/2017 | | 12/27/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/27/2017 | | 12/27/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - MECHANICAL | 12/27/2017 | | 12/27/2017 | | PASS |
Troy James
|
|
|
|
Intake Approval | | | 12/22/2017 | | PASS |
|
|
|
|
Intake Approval | | | 12/13/2017 | | FAIL |
Michael Hanson
|
|
|
CDHD approval required - Provided letter, or stamp and signature on plans, or report with approval from CDHD.
|
Application received | | | 12/11/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 11 2017 2:39PM
|