First Notice | | 5/28/2018 | 6/11/2018 | | DONE |
|
|
|
mailed 6-12
|
BLD-Final | 5/17/2018 | 5/18/2018 | 5/18/2018 | A | PASS |
Mike Jordan
|
|
|
Thanks- we finished! Randy Phone #: ###-#### Inspection requested via web by Dennis Harmon. OK for perm occ.
|
Permanent Occupancy | | | 5/18/2018 | | DONE |
|
|
|
|
BLD-Final | 5/14/2018 | 5/16/2018 | 5/16/2018 | A | FAIL |
Mike Jordan
|
|
|
Please call when onsite. Thanks Randy Phone #: ###-#### Inspection requested via web by Dennis Harmon. Install the exit lights as shown on approved plans. either remove exit signs on store front doors or provide paddles on egress side.
|
FIRE-Final Inspection | 5/14/2018 | 5/15/2018 | 5/15/2018 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire aparms, fire extinguishers are in place with current inspection tags, storage shelves are below 8 feet with storage not exceeding 12 feet. Final life fire safety inspection for permitted area complete.
Please call when on site. Thanks Randy Phone #: ###-#### Inspection requested via web by Dennis Harmon
|
BLD-Framing/Rough-in | 3/7/2018 | 3/8/2018 | 3/8/2018 | A | PASS |
Mike Jordan
|
|
|
Randy Phone #: ###-####. Interior stel stud framed walls ok. Needs mech permit for duct work on batroom vent fan and noted to contractor that a seperate permit and engineering is required for the racking that exceeds 8ft. in height.
|
Telephone call | | | 2/9/2018 | | DONE |
|
|
|
emailed Dennis Harmon the fees due and let him know we still need the valuation for the ele since the plan reviewer checked yes in signatures required
|
Issue PAID IN FULL permit | | | 2/9/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/9/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/16/2018 | | DONE |
|
|
|
MET-Need:
GC form-MET
Revised Value-MET
|
Plan assigned to (JG) | 12/15/2017 | 12/15/2017 | 1/13/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 12/28 L2 Lupo Motors ePlan
|
Routing - PLAN CHECK | 1/9/2018 | | 1/13/2018 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/13/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/5/2018 | 1/8/2018 | 1/5/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 1/5/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 12/15/2017 | | 1/5/2018 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 12/15/2017 | 12/15/2017 | 12/22/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to case
|
Routing - PLANNING | 12/15/2017 | | 12/18/2017 | | PASS |
Cody Riddle
|
|
|
|
Routing - MECHANICAL | 12/15/2017 | | 12/18/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 12/15/2017 | | 12/18/2017 | | PASS |
Bill VanDegrift
|
|
|
1) Verify premise protection
2) verify public works approval of grease abatement
3) no unprotected water use in shop indicated
|
Routing PW Environmental | 12/15/2017 | | 12/18/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - Addressing | 12/15/2017 | | 12/15/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/15/2017 | | 12/15/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 12/15/2017 | | 12/15/2017 | | PASS |
Andy J. Long
|
|
|
No ESC permit required. Interior work only.
|
Intake Approval | | | 12/15/2017 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 12/12/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 12 2017 10:06AM
|