Permit Information
Permit NumberBLD17-04518
StatusFinaled
Name BRIGHT STAR ENERGY MANAGEMENT LLC
Site Address 983 E PARKCENTER BLVD
Project NameBoise Juice Company
Customer Number 
ePlanReviewYes
Description
(BOISE JUICE COMPANY) //Plan Modification to remove the existing grease interceptor and plumbing modifications. 4-6-2018 JG// Permit is to remodel an existing 1,105 sq. ft. business space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of millwork, removal of select plumbing fixtures, construction of interior non-bearing walls to create a kitchen area, a hallway area and infill wall openings, select new millwork, electrical work, plumbing work, and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is Not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  9/21/2018 DONE
First Notice 8/12/20189/6/2018 DONE
mailed 9-10-18
Permanent Occupancy  8/2/2018 DONE
BLD-Final8/1/20188/1/20188/1/2018PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Andrew Clark
FIRE-Final Inspection7/31/20188/1/20188/1/2018ADONE
DetailsJim Page
Life fire safety inspection completed on 6/22/2018.

Andrew Phone #: ###-####
BLD-Final6/22/20186/22/20186/22/2018PPART
DetailsJim Storey
Andrew Phone #: ###-#### temp ok need ada signage/ handle reversed tank side/protection under sink
FIRE-Final Inspection6/22/20186/22/20186/22/2018PPASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguisher is in place with a current inspection tag. Final life fire safety inspection complete.

Phone #: ###-#### Inspection requested via web by Andrew Clark
Temporary Occupancy6/22/20189/20/20186/22/2018 DONE
DetailsBrittany Hill
BLD-Other6/22/20186/22/20186/22/2018PCANC
DetailsJim Storey
Need temp certificate of occupancy Phone #: ###-#### >> Inspection requested via web by Andrew Clark
BLD-Framing/Rough-in5/29/20185/30/20185/30/2018APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Andrew Clark
CHANGE STATUS TO (ISS)  5/21/2018 DONE
Print Occupancy Form  5/21/2018 DONE
Plan assigned to (JG)5/9/20185/9/20185/17/2018 PASS
DetailsJavier Guzman
Plan Mod Boise Juice Company ePlan
Routing - PLUMBING5/15/2018 5/17/2018 PASS
DetailsBill VanDegrift
1) move expansion tank to the water heater side of the check valve.
2) verify water heater sizing with the health department.
Permit Ready to Issue  5/17/2018 DONE
plan mod-please do not re issue-no rev cert of val needed for plan mod
Routing PW Environmental5/15/2018 5/16/2018 PASS
DetailsRick Christenson
No grease abatement required at this time. Should menu change, grease abatement requirements will be reviewed.
Routing - PUBLIC WORKS5/15/2018 5/15/2018 PASS
DetailsRachael Beierle
Routing - PLAN CHECK5/15/2018 5/15/2018 PASS
DetailsJavier Guzman
Plan Modification Accepted  5/9/2018 DONE
DetailsChristina Prado
Plan Mod 2 - Plumbing updates for water heater
Telephone call  5/8/2018 DONE
called Andrew about the plan mod he brought in-left message with the office. I didn't realize while he was here that the permit was sibmitted through e plan so he needs to fill out the 522 app and email to me and I'll start the plan mod so he can go in and upload the drawings
CHANGE STATUS TO (ISS)  4/11/2018 DONE
attached new sign off card to e plan
Print Occupancy Form  4/11/2018 DONE
Plan assigned to (JG)3/28/20183/28/20184/6/2018 PASS
DetailsJavier Guzman
Plan Mod Boise Juice Company ePlan
Routing - PLAN CHECK3/29/2018 4/6/2018 PASS
DetailsJavier Guzman
Permit Ready to Issue  4/6/2018 DONE
please do not re issue
NEED
Rev Cert of Val
i added the plan mod fees but wasn't sure if the valuation changed
Routing PW Environmental3/29/2018 4/6/2018 PASS
DetailsRick Christenson
Any future menu change will require review for grease abatement.
Telephone call  4/3/2018 DONE
was emaild from Troy wanting to know how much longer until he gets his plan mod- I emailed him back taht it went threw several plan reviewers and is now back to JG so it shouldn't be too much longer
Routing - PLUMBING3/29/2018 3/29/2018 PASS
DetailsBill VanDegrift
Verify premise protection
additional cross connection may be required
Per plan and ISPC.
Routing - PUBLIC WORKS3/29/2018 3/29/2018 PASS
DetailsRachael Beierle
Plan Modification Accepted  3/28/2018 DONE
plan mod accepted in e plan for plumbing (new 4" line route, omit grease interceptor, 3 sinks direct drain, no copper lines-sheets P1.0 & P2.0
Issue PAID IN FULL permit  2/20/2018 DONE
Print Occupancy Form  2/20/2018 DONE
Plan assigned to (JG)12/19/201712/19/20171/18/2018 PASS
DetailsJavier Guzman
1/12 L2 Boise Juice Co. ePlan******
Routing - PLAN CHECK1/3/2018 1/18/2018 PASS
DetailsJavier Guzman
1st review completed  1/18/2018 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  1/18/2018 DONE
Permit Ready to Issue  1/18/2018 DONE
NEED
GC FORM -met
REVISED CERT - met
Routing PW Environmental1/3/2018 1/11/2018 PASS
DetailsRick Christenson
JUST IN CASE. I SAW THE WORDS GREASE INTERCEPTOR. BUT ITS JUST A SMOOTHIE AND JUICE COMPANY. ACCORDING TO THE MENU.
Routing - FIRE1/3/20181/3/20181/9/2018 PASS
DetailsScott Arellano
Attached comments to case
Routing - PLUMBING1/3/2018 1/5/2018 PASS
DetailsBill VanDegrift
1) verify premise protection
2) additional cross connection protection may be required.
3) fixture schedule calls for floor sinks at the drop in sinks.
Routing - Addressing1/3/2018 1/3/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/3/2018 1/3/2018 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment1/3/2018 1/3/2018 PASS
DetailsAndy J. Long
No ESC permit required, minimal external disturbance.
Route to Impact Fee Review12/19/201712/22/201712/20/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK12/19/2017 12/19/2017 FAIL
DetailsJavier Guzman
Need to route to appropriate dept. when plumbing plans come in
1st review completed  12/19/2017 FAIL
DetailsJavier Guzman
no Plumbing plans were uploaded
Intake Approval  12/19/2017 PASS
DetailsJavier Guzman
Application received  12/12/2017 DONE
Application submitted via PDS Online on Dec 12 2017 11:34AM