Permit Information
Permit NumberBLD17-04524
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 5533 E HOOTOWL DR
Project NameWhitman HN39-1
Customer Number 
ePlanReviewYes
Description
***HILLSIDE, WUI ZONE "A" REQUIREMENTS CLASS "A" ROOF / 1 HOUR RATED SOFFITS / NON-COMBUSTIBLE EXTERIOR*** Permit for the construction of a new 3028 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 364 sq. ft. of covered patio/porch and a 901 sq. ft. attached garage per the approved plans, plan review report and any notations. SP-01 zoning and setbacks per planning. MDH..A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor 208-608-7171.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Jason Taylor 208-608-7171.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/28/20186/29/20186/29/2018PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Weston Wagner
DOC - Permit Finaled6/29/20186/29/20186/29/2018PPASS
DetailsBrandon Shaw
BLD-Final6/28/20186/28/20186/28/2018PCANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by Weston Wagner Inspection cancelled from web by: Weston Wagner
PubWorks Occupancy Approval6/28/20186/28/20186/28/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Other4/10/20184/11/20184/11/2018APASS
DetailsBrandon Shaw
Rollo-sofit Phone #: ###-####
BLD-Other4/10/20184/10/20184/10/2018PCANC
DetailsBrandon Shaw
WUI soffit insp // Rollo Phone #: ###-####
BLD-Energy code compliance4/4/20184/5/20184/5/2018APASS
DetailsBrandon Shaw
Rollo Phone #: ###-####
BLD-Framing/Rough-in4/2/20184/3/20184/3/2018APASS
DetailsBrandon Shaw
Rollo Phone #: ###-####
BLD-Wall Bracing3/13/20183/14/20183/14/2018APASS
DetailsBrandon Shaw
Rollo Phone #: ###-####
BLD-Foundation2/7/20182/7/20182/8/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Footing2/6/20182/6/20182/6/2018APASS
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing2/5/20182/5/20182/6/2018PCANC
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
PubWorks Subgrade Approval2/6/20182/6/20182/6/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
BLD-Footing2/1/20182/2/20182/2/2018PNR
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Footing2/1/20182/1/20182/1/2018PCANC
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Inspection cancelled via mobile web on Thursday, February 01, 2018.
OVERRIDE  1/12/2018  
Issue PAID IN FULL permit  1/12/2018 DONE
Inspection Record Card- Bld  1/12/2018 DONE
Plan assigned to (M_H)12/21/2017 1/12/2018 DONE
DetailsMichael Hanson
01/02 sfd L2 ePlan - 1st review completed. RTA - Missing tall wall calculations. MDH
Routing - PLAN CHECK12/22/2017 1/12/2018 PASS
DetailsMichael Hanson
Routing PW Grading-Hillside1/12/2018 1/12/2018 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Jason Taylor ###-####.
PLANS/APPL TAKEN TO FRONT DESK  1/12/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  1/12/2018 DONE
met
Plan Reviewer's activity  12/22/2017 DONE
DetailsMichael Hanson
1st review completed  12/22/2017 FAIL
DetailsMichael Hanson
RTA - Missing tall wall calculations. MDH
Routing - PLAN CHECK12/13/2017 12/22/2017 FAIL
DetailsMichael Hanson
RTA - Missing tall wall calculations. MDH
Plan assigned to (BJM)12/13/201712/13/201712/21/2017 DEFR
DetailsBrian McGowan
1/2 sfd L2 ePlan
Routing PW Grading-Hillside12/13/2017 12/20/2017 FAIL
DetailsJason C. Taylor
I have reviewed the geotechnical report dated December 12, 2017 and have a few revisions needed. I understand that an addendum may be needed for the following items:

Report need to address the required items listed in the Boise City Hillside Manual (attached). In particular:

1. Note H. No conclusions or recommendations have been given for suitability of the site.

Please resubmit the report or addendum to your client for upload into the permitting system,
Routing - FIRE12/14/201712/14/201712/18/2017 PASS
DetailsScott Arellano
Approved. No comments attached.
Route to Impact Fee Review12/13/201712/16/201712/15/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Erosion and Sediment12/14/2017 12/14/2017 PASS
DetailsAndy J. Long
ESC plan approved. Site preparation inspection required.
Routing - MECHANICAL12/13/2017 12/14/2017 PASS
DetailsTroy James
Routing - Addressing12/13/2017 12/14/2017 PASS
DetailsDoug Chausow
Application received  12/13/2017 DONE
Application submitted via PDS Online on Dec 13 2017 12:35PM
Plans ACCEPTED BY PLAN TECH  12/13/2017 DONE
Intake Approval  12/13/2017 PASS
Recd Pcfee & Taken To Pln CK  12/13/2017 DONE
Routing - PUBLIC WORKS12/13/2017 12/13/2017 PASS
DetailsMorgan Webb
Routing - PLANNING12/13/2017 12/13/2017 PASS
DetailsJeff Lowe