BLD-Final | 6/28/2018 | 6/29/2018 | 6/29/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner
|
DOC - Permit Finaled | 6/29/2018 | 6/29/2018 | 6/29/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 6/28/2018 | 6/28/2018 | 6/28/2018 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Weston Wagner Inspection cancelled from web by: Weston Wagner
|
PubWorks Occupancy Approval | 6/28/2018 | 6/28/2018 | 6/28/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Other | 4/10/2018 | 4/11/2018 | 4/11/2018 | A | PASS |
Brandon Shaw
|
|
|
Rollo-sofit Phone #: ###-####
|
BLD-Other | 4/10/2018 | 4/10/2018 | 4/10/2018 | P | CANC |
Brandon Shaw
|
|
|
WUI soffit insp // Rollo Phone #: ###-####
|
BLD-Energy code compliance | 4/4/2018 | 4/5/2018 | 4/5/2018 | A | PASS |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
BLD-Framing/Rough-in | 4/2/2018 | 4/3/2018 | 4/3/2018 | A | PASS |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
BLD-Wall Bracing | 3/13/2018 | 3/14/2018 | 3/14/2018 | A | PASS |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
BLD-Foundation | 2/7/2018 | 2/7/2018 | 2/8/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 2/6/2018 | 2/6/2018 | 2/6/2018 | A | PASS |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 2/5/2018 | 2/5/2018 | 2/6/2018 | P | CANC |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion
|
PubWorks Subgrade Approval | 2/6/2018 | 2/6/2018 | 2/6/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 2/1/2018 | 2/2/2018 | 2/2/2018 | P | NR |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | CANC |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Inspection cancelled via mobile web on Thursday, February 01, 2018.
|
OVERRIDE | | | 1/12/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/12/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/12/2018 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 12/21/2017 | | 1/12/2018 | | DONE |
Michael Hanson
|
|
|
01/02 sfd L2 ePlan - 1st review completed. RTA - Missing tall wall calculations. MDH
|
Routing - PLAN CHECK | 12/22/2017 | | 1/12/2018 | | PASS |
Michael Hanson
|
|
|
|
Routing PW Grading-Hillside | 1/12/2018 | | 1/12/2018 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Jason Taylor ###-####.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/12/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 1/12/2018 | | DONE |
|
|
|
met
|
Plan Reviewer's activity | | | 12/22/2017 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 12/22/2017 | | FAIL |
Michael Hanson
|
|
|
RTA - Missing tall wall calculations. MDH
|
Routing - PLAN CHECK | 12/13/2017 | | 12/22/2017 | | FAIL |
Michael Hanson
|
|
|
RTA - Missing tall wall calculations. MDH
|
Plan assigned to (BJM) | 12/13/2017 | 12/13/2017 | 12/21/2017 | | DEFR |
Brian McGowan
|
|
|
1/2 sfd L2 ePlan
|
Routing PW Grading-Hillside | 12/13/2017 | | 12/20/2017 | | FAIL |
Jason C. Taylor
|
|
|
I have reviewed the geotechnical report dated December 12, 2017 and have a few revisions needed. I understand that an addendum may be needed for the following items:
Report need to address the required items listed in the Boise City Hillside Manual (attached). In particular:
1. Note H. No conclusions or recommendations have been given for suitability of the site.
Please resubmit the report or addendum to your client for upload into the permitting system,
|
Routing - FIRE | 12/14/2017 | 12/14/2017 | 12/18/2017 | | PASS |
Scott Arellano
|
|
|
Approved. No comments attached.
|
Route to Impact Fee Review | 12/13/2017 | 12/16/2017 | 12/15/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Erosion and Sediment | 12/14/2017 | | 12/14/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Site preparation inspection required.
|
Routing - MECHANICAL | 12/13/2017 | | 12/14/2017 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 12/13/2017 | | 12/14/2017 | | PASS |
Doug Chausow
|
|
|
|
Application received | | | 12/13/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 13 2017 12:35PM
|
Plans ACCEPTED BY PLAN TECH | | | 12/13/2017 | | DONE |
|
|
|
|
Intake Approval | | | 12/13/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/13/2017 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 12/13/2017 | | 12/13/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLANNING | 12/13/2017 | | 12/13/2017 | | PASS |
Jeff Lowe
|
|
|
|