Permit Information
Permit NumberBLD17-04526
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2415 S TRAPPER PL
Project NameHN 5-1 Cypress
Customer Number 
ePlanReviewYes
Description
***HILLSIDE, WUI ZONE "A" REQUIREMENTS CLASS "A" ROOF / 1 HOUR RATED SOFFITS / NON-COMBUSTIBLE EXTERIOR*** Permit for the construction of a new 3192 sq. ft., two story (first story 1379 sq. ft., second story 1813 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 739 sq. ft. of covered patio/porch and a 795 sq. ft. attached garage per the approved plans, plan review report and any notations. SP-01 zoning and setbacks per planning. MDH. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor 208-608-7171.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Jason Taylor 208-608-7171.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/12/20189/12/20189/12/2018PPASS
DetailsBrandon Shaw
Les Phone #: ###-####
DOC - Permit Finaled9/12/20189/12/20189/12/2018PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results9/12/20189/12/20189/12/2018PDONE
DetailsBrandon Shaw
ACH50- 3.30
ACH50- 3.30
PubWorks Occupancy Approval9/11/20189/11/20189/11/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.

PubWorks Subgrade Approval8/29/20188/29/20188/29/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
BLD-Wall Bracing6/5/20186/5/20186/5/2018PNR
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Energy code compliance5/23/20185/24/20185/24/2018APASS
DetailsBrandon Shaw
Luz Phone #: ###-####
BLD-Framing/Rough-in5/21/20185/22/20185/22/2018APASS
DetailsBrandon Shaw
OK to insulate
BLD-Other5/21/20185/22/20185/22/2018APASS
DetailsBrandon Shaw
WUI soffit // Les Phone #: ###-####
BLD-Wall Bracing5/1/20185/2/20185/2/2018PPEND
DetailsBrandon Shaw
A35 clips- garage interior shear
Strap needed- Up stairts balcony

See red paint and plans
BLD-Foundation4/6/20184/6/20184/6/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Footing4/5/20184/5/20184/5/2018PPASS
DetailsBrandon Shaw
Work in progress
Issue PAID IN FULL permit  1/25/2018 DONE
OVERRIDE  1/24/2018  
PLANS/APPL TAKEN TO FRONT DESK  1/24/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  1/24/2018 DONE
DO NOT RE ISSUE. PLAN MOD
Plan assigned to (M_H)1/16/2018 1/24/2018 DONE
DetailsMichael Hanson
Plan modification - New grading and drainage plan.
Routing - PLAN CHECK1/17/2018 1/24/2018 PASS
DetailsMichael Hanson
Routing PW Grading-Hillside1/17/2018 1/23/2018 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
Routing - PUBLIC WORKS1/17/2018 1/17/2018 PASS
DetailsMorgan Webb
CHANGE STATUS TO (REV)  1/16/2018 DONE
resubmittals were uploaded before permit was made issue so i changed the permit from RDY to REV and assigned it to Mike H
Issue PAID IN FULL permit  1/16/2018 DONE
Inspection Record Card- Bld  1/16/2018 DONE
Plan Modification Accepted  1/16/2018 DONE
plan mod started in e plan-submitting new drawings for grading and dreainage for the retaining wall
CHANGE ISSUED DATE  1/16/2018 DONE
DetailsRita DeYoung
reset issued date
OVERRIDE  1/12/2018  
Plan assigned to (M_H)12/22/2017 1/12/2018 DONE
DetailsMichael Hanson
01/02 sfd L2 ePlan - 1st review completed. RTA - hillside resubmittal required. MDH
Routing - PLAN CHECK12/26/2017 1/12/2018 PASS
DetailsMichael Hanson
Routing PW Grading-Hillside1/12/2018 1/12/2018 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Jason Taylor ###-####.
PLANS/APPL TAKEN TO FRONT DESK  1/12/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  1/12/2018 DONE
Met
Plan Reviewer's activity  12/26/2017 DONE
DetailsMichael Hanson
1st review completed  12/26/2017 FAIL
DetailsMichael Hanson
Hillside resubmittal required. MDH
Routing - PLAN CHECK12/13/2017 12/26/2017 FAIL
DetailsBrian McGowan
Hillside resubmittal required. MDH
Plan assigned to (BJM)12/13/201712/13/201712/22/2017 DEFR
DetailsBrian McGowan
1/2 sfd L2 ePlan
Routing PW Grading-Hillside12/13/2017 12/20/2017 FAIL
DetailsJason C. Taylor
I have reviewed the geotechnical report dated November 22, 2017 and have a few revisions needed. I understand that an addendum may be needed for the following items:

Report need to address the required items listed in the Boise City Hillside Manual (attached). In particular:

1. Note H. No conclusions or recommendations have been given for suitability of the site.

Please resubmit the report or addendum to your client for upload into the permitting system,
Routing - FIRE12/14/201712/14/201712/18/2017 PASS
DetailsScott Arellano
No comments attached.
Route to Impact Fee Review12/13/201712/16/201712/15/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Erosion and Sediment12/14/2017 12/14/2017 PASS
DetailsAndy J. Long
ESC plan approved. Valid RP & PD; site preparation inspection required.
Routing - MECHANICAL12/13/2017 12/14/2017 PASS
DetailsTroy James
Routing - PLANNING12/13/2017 12/14/2017 PASS
DetailsSue Cummings
Routing - Addressing12/13/2017 12/14/2017 PASS
DetailsDoug Chausow
Application received  12/13/2017 DONE
Application submitted via PDS Online on Dec 13 2017 2:35PM
Intake Approval  12/13/2017 FAIL
Missing ResCheck
Plans ACCEPTED BY PLAN TECH  12/13/2017 DONE
Intake Approval  12/13/2017 PASS
Recd Pcfee & Taken To Pln CK  12/13/2017 DONE
Routing - PUBLIC WORKS12/13/2017 12/13/2017 PASS
DetailsMorgan Webb