BLD-Final | 8/28/2018 | 8/28/2018 | 8/28/2018 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Beck
|
DOC - Permit Finaled | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Wall cover | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | PASS |
Brandon Shaw
|
|
|
Request is for inspection, per Tony Young''s request, of drywall on lid of patio cover before we install fire treated wood paneling Phone #: ###-#### Inspection requested via web by Gary Beck
|
BLD-Framing/Rough-in | 7/26/2018 | 7/26/2018 | 7/26/2018 | A | PASS |
Tony Young
|
|
|
patio cover lid Phone #: ###-#### Inspection requested via web by Gary Beck,, frame ok,, will need to see soffit cover
|
BLD-Footing | 5/23/2018 | 5/24/2018 | 5/25/2018 | P | PASS |
Dave Hannah
|
|
|
Early pm if possible. Thanks!
Phone #: ###-#### Inspection requested via web by Gary Beck
|
PubWorks Subgrade Approval | 5/24/2018 | 5/24/2018 | 5/24/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 5/1/2018 | 5/2/2018 | 5/2/2018 | A | CANC |
Tony Young
|
|
|
Late morning please. Phone #: ###-#### >> Inspection requested via web by Gary Beck Inspection cancelled from web by: Gary Beck
|
BLD-Energy code compliance | 4/5/2018 | 4/6/2018 | 4/6/2018 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Beck
|
BLD-Wall cover | 4/5/2018 | 4/5/2018 | 4/6/2018 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Beck
|
BLD-Wall cover | 3/27/2018 | 3/28/2018 | 3/28/2018 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Beck,, interior shear on south
|
BLD-Wall cover | 3/26/2018 | 3/27/2018 | 3/27/2018 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Beck,, work in progress
|
BLD-Wall cover | 3/25/2018 | 3/26/2018 | 3/26/2018 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Beck,, see other notes
|
BLD-Energy code compliance | 3/25/2018 | 3/26/2018 | 3/26/2018 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Beck,, ok,, need interior shear on south wall.. needs rims done,, seal fireblocking
|
BLD-Framing/Rough-in | 3/19/2018 | 3/19/2018 | 3/19/2018 | P | PART |
Dave Hannah
|
|
|
Aaron Beck Phone #: ###-#### ok to insulate but needs to fire block top of arcs on groung floor hall wal and bothsides of fire place
|
CHANGE STATUS TO (ISS) | | | 3/19/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 3/16/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 3/12/2018 | 3/12/2018 | 3/16/2018 | | PASS |
Josh Bogle
|
|
|
1st done - need ESC waiver, structural, & #310
|
Inspection Record Card- Bld | | | 3/16/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/14/2018 | | 3/16/2018 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/16/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/16/2018 | | DONE |
|
|
|
DO NOT ISSUE. PLAN MOD
|
Routing - Erosion and Sediment | 3/12/2018 | | 3/14/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Site preparation inspection required.
|
Plan resubmittals received | | | 3/13/2018 | | DONE |
|
|
|
two copies of esc narratives. taken to josh b
|
Routing - PLAN CHECK | 3/8/2018 | | 3/12/2018 | | FAIL |
Josh Bogle
|
|
|
see e-mail 3/12/18
|
Routing - PLANNING | 3/12/2018 | | 3/12/2018 | | PASS |
Colleen T Carroll
|
|
|
|
Routing PW Grading-Hillside | 3/12/2018 | | 3/12/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
|
Routing Walk-In (BLD) | 2/23/2018 | 2/23/2018 | 2/23/2018 | P | PASS |
Josh Bogle
|
|
|
talked about potential patio cover
|
BLD-Footing | 12/17/2017 | 12/18/2017 | 12/18/2017 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Beck,, interior footings ok
|
Routing Walk-In (BLD) | 12/14/2017 | 12/14/2017 | 12/14/2017 | P | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 12/14/2017 | | 12/14/2017 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 12/14/2017 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 12/14/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 12/14/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/14/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 12/14/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/14/2017 | | DONE |
|
|
|
|
Application received | | 12/14/2017 | | | |
|
|
|
|