Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD17-04584
StatusFinaled
Name ST LUKES HEALTH SYSTEM LTD
Site Address 190 E BANNOCK ST
Project NameSt. Lukes - MI Waiting Room
Customer Number 
ePlanReviewYes
Description
ST. LUKES – GROUND FLOOR - MI WAITING ROOM) Permit is to remodel an existing 350 sq. ft. area within the ground floor of the existing building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of select millwork, removal of select suspended acoustic ceiling, removal of select light fixtures, construction of interior non-bearing walls to create an open waiting room, select new suspended acoustic ceiling, select new light fixtures, electrical work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  8/13/2020 DONE
1st past due
Meeting  4/9/2020 DONE
waiting for hear back from curtis on the electrical value total, how to divide the mechanical value with the two companies and who did the plumbing since no plm attached to bld.
Third Notice 3/14/20204/3/2020 DONE
emailed curtis 4-3-2020
Second Notice 2/17/20203/9/2020 DONE
emailed curtis 3-9-20
First Notice 1/19/20202/7/2020 DONE
emailed victoria and curtis 2-7-20
Letter of compliance/Occupancy  1/9/2020 DONE
DOC - Permit Finaled  1/9/2020 DONE
Permit Finaled 3/29/18
(F) Reprint permit  8/16/2019 DONE
BLD-Final3/28/20183/29/20183/29/2018APASS
DetailsDave Hannah
Daryl Phone #: ###-####
FIRE-Final Inspection3/23/20183/27/20183/26/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete.
BLD-Ceiling Grid Inspection3/16/20183/19/20183/19/2018APASS
DetailsDave Hannah
Darly Phone #: ###-####
BLD-Conference2/27/20182/28/20182/28/2018ADONE
DetailsDave Hannah
Fire wall // Daryl Phone #: ###-####
BLD-Framing/Rough-in2/21/20182/21/20182/21/2018PPEND
DetailsDave Hannah
Daryl Phone #: ###-#### ok to cover after elec rough in
Issue PAID IN FULL permit  2/14/2018 DONE
Inspection Record Card- Bld  2/14/2018 DONE
Permit Ready to Issue  1/8/2018 DONE
DetailsChristina Prado
Need:
GC form - met
Revised Value - met
Plan assigned to (JG)12/29/201712/29/20171/6/2018 PASS
DetailsJavier Guzman
1st rev comp, 12/26 L1 MI WAITING ROOM RELOCATION ePlan
Routing - PLAN CHECK1/3/2018 1/6/2018 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  1/6/2018 DONE
Route to Impact Fee Review12/29/20171/1/20181/2/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan assigned to (JG)12/20/201712/20/201712/29/2017 PASS
DetailsJavier Guzman
1st rev comp, 12/26 L1 MI WAITING ROOM RELOCATION ePlan
Routing - PLAN CHECK12/20/2017 12/29/2017 FAIL
DetailsJavier Guzman
1st review completed  12/29/2017 FAIL
DetailsJavier Guzman
Routing - Addressing12/28/2017 12/28/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS12/28/2017 12/28/2017 PASS
DetailsRachael Beierle
Routing - FIRE12/20/201712/20/201712/26/2017 PASS
DetailsScott Arellano
Attached comments to case
Routing - MECHANICAL12/20/2017 12/26/2017 PASS
DetailsTroy James
Routing - PLUMBING12/20/2017 12/20/2017 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Intake Approval  12/20/2017 PASS
DetailsJavier Guzman
Application received  12/19/2017 DONE
Application submitted via PDS Online on Dec 19 2017 2:23PM