BLD-Framing/Rough-in | 1/8/2018 | 1/9/2018 | 1/9/2018 | A | PART |
Jim Sly
|
|
|
Framing inspection for half of the basement Phone #: ###-#### Inspection requested via web by Tyler Miller East half of basement.....Frame and Energy......OK.
|
Routing - PLAN CHECK | 12/20/2017 | | 12/20/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 12/20/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 12/20/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 12/20/2017 | | DONE |
|
|
|
met
|
Telephone call | | | 12/20/2017 | | DONE |
|
|
|
called Tyler to let know permit is ready and how much is owed-left message on his phone
|
Issue PAID IN FULL permit | | | 12/20/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 12/19/2017 | 12/19/2017 | 12/19/2017 | P | FAIL |
Brian McGowan
|
|
|
Need beam and header sizes. Applicant needs to verify if trusses bear on the bearing wall in the Basement. I took in the plans. He will call me with the information.
|
1st review completed | | | 12/19/2017 | | FAIL |
Brian McGowan
|
|
|
Need beam and header sizes. Applicant needs to verify if trusses bear on the bearing wall in the Basement. I took in the plans. He will call me with the information.
|
Routing - PLAN CHECK | 12/19/2017 | | 12/19/2017 | | FAIL |
Brian McGowan
|
|
|
Need beam and header sizes. Applicant needs to verify if trusses bear on the bearing wall in the Basement. I took in the plans. He will call me with the information.
|
Application received | | 12/19/2017 | | | |
|
|
|
|