Print Statement | | | 5/16/2019 | | DONE |
|
|
|
|
Second Notice | | 4/18/2019 | 5/6/2019 | | DONE |
|
|
|
mailed 5-10-19
|
First Notice | | 3/31/2019 | 4/8/2019 | | DONE |
|
|
|
mailed 4-11-19
|
BLD-Final | 3/21/2019 | 3/21/2019 | 3/21/2019 | P | PASS |
Mike Jordan
|
|
|
Randy Phone #: ###-####
|
Permanent Occupancy | | | 3/21/2019 | | DONE |
|
|
|
|
Zoning Approval | 3/20/2019 | 3/20/2019 | 3/20/2019 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 1/15/2019 | 1/16/2019 | 1/16/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Randy Phone #: ###-####
|
FIRE-Final Inspection | 1/4/2019 | 1/4/2019 | 1/4/2019 | P | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to pass when the project related fire sprinkler permit is passed
Randy Phone #: ###-####
|
BLD-Final | 1/4/2019 | 1/4/2019 | 1/4/2019 | P | NR |
Jim Sly
|
|
|
Randy Phone #: ###-#### Need Fir18-00609 sprinkler. Zoning and Fire life safety.
|
FIRE-Final Inspection | 1/4/2019 | 1/4/2019 | 1/4/2019 | P | FAIL |
Troy Cobbley
|
|
|
Need small documents and the project related fire sprinkler permit finaled.
|
FIRE-Conference | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | DONE |
Troy Cobbley
|
|
|
Randy and I went over basic life safety requirements for his project.
|
PubWorks Occupancy Approval | 11/5/2018 | 11/5/2018 | 11/5/2018 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Wall Bracing | 6/28/2018 | 6/29/2018 | 6/29/2018 | A | PASS |
Jim Sly
|
|
|
Jeff Phone #: ###-#### East 1/2 of Foundation Wall.....OK
|
BLD-Footing | 6/26/2018 | 6/27/2018 | 6/27/2018 | A | PART |
Jim Sly
|
|
|
Jeff Phone #: ###-#### East 1/2 of bldg.......OK. verified anchor bolts 24" long.
|
BLD-Foundation | 6/4/2018 | 6/5/2018 | 6/5/2018 | A | PART |
Jim Sly
|
|
|
Jeff Phone #: ###-#### No Special Inspection required. PART West 1/2 of Bldg. OK.
|
BLD-Footing | 5/31/2018 | 6/1/2018 | 6/1/2018 | P | PASS |
Jim Sly
|
|
|
Jeff Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/8/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/8/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 5/3/2018 | | |
|
|
|
|
Plan assigned to (CJW) | 2/24/2018 | 2/24/2018 | 5/3/2018 | | PASS |
Carl Westfall
|
|
|
(3rd done) (Mar 30 - 25 days) (Feb 24 PI) (28 sheets) Davinci Stone Addition
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/3/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/3/2018 | | DONE |
|
|
|
Need:
GC form- met
Revised value from GC-met
RP-met
|
Routing - PLAN CHECK | 5/1/2018 | | 5/2/2018 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLANNING | 5/2/2018 | | 5/2/2018 | | PASS |
David Moser
|
|
|
|
Routing - Design Review | 5/2/2018 | | 5/2/2018 | | PASS |
Andrea Tuning
|
|
|
|
Plan resubmittals received | | | 5/1/2018 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 4/14/2018 | | DONE |
|
|
|
|
Routing PW Solid Waste | 4/11/2018 | | 4/13/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing - PLANNING | 4/11/2018 | | 4/12/2018 | | FAIL |
David Moser
|
|
|
need to make sure the west side building setbacks are the same on SP1.0, SP2.0 and C1.0 site plans
|
Route to Impact Fee Review | 4/10/2018 | 4/13/2018 | 4/11/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan resubmittals received | | | 4/11/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/11/2018 | | 4/11/2018 | | PASS |
Carl Westfall
|
|
|
|
Routing - Design Review | 4/11/2018 | | 4/11/2018 | | FAIL |
Andrea Tuning
|
|
|
Provide a copy of a recorded cross access and shared parking agreement allowing this parcel to utilize the drive aisles and parking throughout the neighboring property. The applicant will be required to continue to provide a total of 14-parking spaces on this parcel in perpetuity or obtain other off-site parking meeting the required criteria. The agreement should be reviewed and approved By the City of Boise's Legal Department prior to being recorded.
|
Plan resubmittals requested | | | 4/10/2018 | | DONE |
|
|
|
Other agencies have items that need to be resolved.
|
1st review completed | | | 4/10/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/24/2018 | | 4/10/2018 | | PASS |
Carl Westfall
|
|
|
1st IBC plan review completed and approved
|
Routing PW Drainage | 3/12/2018 | | 3/12/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing Off Site - STRUCTURAL | 2/24/2018 | | 3/8/2018 | | PASS |
Carl Westfall
|
|
|
Dave Haugland (AHJ)
|
Routing PW Drainage | 2/26/2018 | | 3/5/2018 | | FAIL |
Brian Murphy
|
|
|
apendx j
|
Routing PW Environmental | 2/26/2018 | | 3/5/2018 | | PASS |
Rick Christenson
|
|
|
Storage only
|
Routing - FIRE | 2/24/2018 | 2/24/2018 | 3/2/2018 | | PASS |
Scott Arellano
|
|
|
Attached comments to case
|
Routing - MECHANICAL | 2/24/2018 | | 2/27/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 2/24/2018 | | 2/26/2018 | | FAIL |
David Moser
|
|
|
The site plan SP2.0 does not match the site plan C1.0. Remove note 11 from parcel 1655 Bryson since the outdoor gravel storage area is not approved.
|
Routing - Addressing | 2/24/2018 | | 2/26/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/24/2018 | | 2/26/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 2/24/2018 | | 2/26/2018 | | PASS |
Michael Zawacki
|
|
|
Valid RP needed prior to any ground disturbing activities. Plan designer will need to update schedule and BMPs as stated in schedule section of SWPPP.
Site inspection required before work begins.
|
Routing PW Solid Waste | 2/26/2018 | | 2/26/2018 | | FAIL |
Evan Carpenter
|
|
|
The solid waste enclosure must have at least 12 feet of unobstructed clearance between gate posts (measured from the innermost points).
|
Routing - Design Review | 2/24/2018 | | 2/26/2018 | | FAIL |
Andrea Tuning
|
|
|
Provide a copy of a recorded cross access and shared parking agreement allowing this parcel to utilize the drive aisles and parking throughout the neighboring property. The applicant will be required to continue to provide a total of 14-parking spaces on this parcel in perpetuity or obtain other off-site parking meeting the required criteria.
|
Intake Approval | | | 2/24/2018 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 2/20/2018 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 2/5/2018 | | FAIL |
|
|
|
(2-5-18) Please refer to the circled items (without an OK in the circle) in the plan intake checklist. Please resolve each item as directed. CJW
|
Intake Approval | | | 1/10/2018 | | FAIL |
|
|
|
(1-10-18) Please refer to the circled items in the plan intake checklist. Please resolve each item as directed. CJW
|
Intake Approval | | | 12/22/2017 | | FAIL |
|
|
|
Nothing but the application was uploaded
|
Application received | | | 12/19/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 19 2017 4:40PM
|