BLD-Conference | 12/11/2018 | 12/18/2018 | 12/18/2018 | A | DEFR |
Brandon Shaw
|
|
|
Occupying structure with no CO, need to demo existing home before move in. See BLD18-01808 Phone #: ###-#### Demo to be completed by the ene of the week, 18Dec2018...
|
BLD-Conference | 11/28/2018 | 12/11/2018 | 12/11/2018 | A | PEND |
Tony Young
|
|
|
Occupying structure with no CO, need to demo existing home before move in. See BLD18-01808 Phone #: ###-####// status review
|
BLD-Conference | 11/20/2018 | 11/28/2018 | 11/28/2018 | A | NR |
Tony Young
|
|
|
Occupying structure with no CO, need to demo existing home before move in. See BLD18-01808 Phone #: ###-####// status review
|
BLD-Conference | 11/19/2018 | 11/20/2018 | 11/20/2018 | A | PEND |
Tony Young
|
|
|
Occupying structure with no CO, need to demo existing home before move in. See BLD18-01808 Phone #: ###-####,, C/N posted,, owner called and said that he was next on the demo guys list
|
BLD-Final | 5/23/2018 | 5/23/2018 | 5/24/2018 | P | PASS |
Jim Storey
|
|
|
demo permit is pulled for exiising house, need co for new house so owner can move in and then demo old house // call if no one there for garage code // Rick Phone #: ###-#### final ok on new house co issued// pending demo of exsiting house.
|
Telephone call | | | 5/21/2018 | | DONE |
|
|
|
spoke with Rick from Sherburne-Marrs. Demo permit for old house needs to be pulled and issued prior to scheduling final inspection for new house.
|
BLD-Conference | 3/14/2018 | 3/15/2018 | 3/15/2018 | A | PASS |
Tony Young
|
|
|
Rick Phone #: ###-####,, address,, egress,, tempered glass,, framer making changes,, old home at 3401 will be removed and that address will go away
|
BLD-Conference | 3/14/2018 | 3/15/2018 | 3/15/2018 | A | CANC |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 3/13/2018 | 3/14/2018 | 3/14/2018 | P | PART |
Tony Young
|
|
|
Rick Phone #: ###-####,, needs egress in north/west bedroom,, needs tempered glass by back door,, needs address looked at,, out of order,, ok to start sheetrock
|
BLD-Framing/Rough-in | 3/12/2018 | 3/13/2018 | 3/13/2018 | A | PASS |
Brandon Shaw
|
|
|
Framing and shear
OK to insulate
|
Plan Modification Accepted | | | 3/6/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 3/6/2018 | | 3/6/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Footing | 1/24/2018 | 1/25/2018 | 1/25/2018 | A | PASS |
Jim Storey
|
|
|
Jared Phone #: ###-####
|
Meeting | | | 1/23/2018 | | DONE |
Christina Prado
|
|
|
Notified GC of conditional hold on final CO. Per attached email from Todd Tucker 11/29/17, final CO cannot be granted until a demolition permit is applied for on the existing SFD. Home Builder & Demo contractor will differ, hold to verify two SFD will not existing on one parcel
|
Meeting | | | 1/8/2018 | | DONE |
|
|
|
called Doug in addressing to let know that the parcel info is not in the parcel area of this permit-left message on his phone
|
Issue PAID IN FULL permit | | | 1/8/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/8/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 1/5/2018 | | |
|
|
|
|
Plan assigned to (M_H) | 12/27/2017 | | 1/5/2018 | | DONE |
Michael Hanson
|
|
|
01/04 sfd L1 ePlan - 1st review completed 12/28 Mech=open MDH
|
Routing - PLAN CHECK | 1/4/2018 | | 1/5/2018 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/5/2018 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 1/5/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/28/2017 | | 1/4/2018 | | FAIL |
Michael Hanson
|
|
|
RTA - Structural deficiencies. MDH
|
Plan Reviewer's activity | | | 1/4/2018 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 1/4/2018 | | FAIL |
Michael Hanson
|
|
|
RTA - Structural deficiencies. MDH
|
Routing - MECHANICAL | 12/21/2017 | | 1/3/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 12/21/2017 | | 12/28/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - PLAN CHECK | 12/21/2017 | | 12/28/2017 | | FAIL |
Michael Hanson
|
|
|
RTA - Structural deficiencies MDH
|
Route to Impact Fee Review | 12/21/2017 | 12/24/2017 | 12/27/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plan assigned to (BJM) | 12/21/2017 | 12/21/2017 | 12/27/2017 | | DEFR |
Brian McGowan
|
|
|
1/4 sfd L1 ePlan
|
Routing - Addressing | 12/21/2017 | | 12/21/2017 | | PASS |
Doug Chausow
|
|
|
Updated new address: 3405 N Tamarack Dr (to be retired after old house is demo'd)
|
Routing - PUBLIC WORKS | 12/21/2017 | | 12/21/2017 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/21/2017 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/21/2017 | | DONE |
|
|
|
|
Intake Approval | | | 12/21/2017 | | PASS |
|
|
|
|
Application received | | | 12/20/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 20 2017 2:06PM
|
Intake Approval | | | 12/20/2017 | | FAIL |
|
|
|
Plans need to be in lanscape, drawings need to be minimum of 24x18 and need RES check or prescriptive on plans
|