Permit Information
Permit NumberBLD17-04605
StatusFinaled
Name EIGHTH & MAIN CONDOMINIUM ASSOC INC
Site Address 800 W MAIN ST Unit: 1420
Project NameGS Strategy Group Suite #1420
Customer Number 
ePlanReviewYes
Description
(GS STRATEGY GROUP – SUITE #1420) Fire sprinklers used for high rise. Permit is to create a 2,848 sq. ft. office tenant space on the 14th story of a new high rise building. Approval is contingent upon adhering to the approved plans on file. Work to include: construction of interior non-bearing walls to create (7) offices, open office areas, a conference room, a print room and a break room, new door/doorframes, new interior storefront windows, millwork, suspended acoustical ceilings, light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  5/18/2018 DONE
First Notice 5/3/20185/11/2018 DONE
mailed 5-14
Permanent Occupancy  4/23/2018 DONE
BLD-Final4/19/20184/20/20184/20/2018APASS
DetailsDave Hannah
Larren Phone #: ###-####
BLD-Final3/15/20183/15/20183/16/2018PPART
DetailsDave Hannah
Larren Phone #: ###-#### ok for temp occ needs to install doors
Temporary Occupancy3/16/20186/14/20183/16/2018 DONE
DetailsChristina Prado
FIRE-Final Inspection3/14/20183/14/20183/14/2018PPASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguisher is in place with a current inspection tag. Final life fire safety inspection for area of work complete.
BLD-Framing/Rough-in1/23/20181/24/20181/24/2018APASS
DetailsDave Hannah
Larrin Phone #: ###-####
Issue PAID IN FULL permit  1/23/2018 DONE
Print Occupancy Form  1/23/2018 DONE
Permit Ready to Issue  1/19/2018 DONE
NEED

Rev Cert of Val
Route to Impact Fee Review1/17/20181/20/20181/18/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan assigned to (JG)12/28/201712/28/20171/18/2018 PASS
DetailsJavier Guzman
1st rev comp, 1/10 L2 GS Strategy Group ePlan
Routing - PLAN CHECK1/18/2018 1/18/2018 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  1/18/2018 DONE
1st review completed  1/17/2018 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK12/28/2017 1/17/2018 FAIL
DetailsJavier Guzman
Routing - FIRE12/28/201712/28/20171/5/2018 PASS
DetailsScott Arellano
Attached comments to case
Routing - PLUMBING12/28/2017 1/3/2018 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - MECHANICAL12/28/2017 1/2/2018 PASS
DetailsTroy James
Routing - Addressing12/28/2017 12/28/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS12/28/2017 12/28/2017 PASS
DetailsRachael Beierle
Intake Approval  12/28/2017 PASS
DetailsJavier Guzman
Application received  12/20/2017 DONE
Application submitted via PDS Online on Dec 20 2017 4:09PM