Permit Information
Permit NumberBLD17-04616
StatusFinaled
Name BELFOR USA GROUP INC
Site Address 1680 N PHILLIPPI ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(BOND STREET APARTMENTS) (UNIT 122) Permit to repair an exiting apartment unit after damage caused by fire. All wor to be a like for like replacement af all damaged elements. This is a scope of work permit only with a certificate of completion to be issued upon completion of the project. A pre-construction inspection is required with the building inspectior prior to the comencement of any work. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 6/16/20187/10/2018 DONE
mailed 7-11-18
Second Notice 5/20/20186/11/2018 DONE
mailed 6-12
First Notice4/16/20184/16/20185/10/2018 DONE
DetailsJim Sly
mailed 5-11-18
BLD-Final4/16/20184/16/20184/16/2018PPASS
DetailsJim Sly
Steve Phone #: ###-####
DOC - Permit Finaled4/16/20184/16/20184/16/2018PPASS
DetailsJim Sly
FIRE-Final Inspection4/13/20184/16/20184/16/2018APASS
DetailsJim Page
No fire sprinklers, smoke detector is stand-alone and not monitored, fire extinguisher is in common area with a current inspection tag. Final life fire safety inspection for area of work complete.
BLD-Final4/11/20184/13/20184/13/2018ANR
DetailsJim Sly
Steve Phone #: ###-####
OK to final when Fire signs off.
FIRE-Final Inspection4/11/20184/12/20184/12/2018AFAIL
DetailsTroy Cobbley
Missing plans, need annual inspection for the fire extinguisher, need to relocate the smoke alarm to atleast 3' from the bathroom door.

Steve Phone #: ###-####
BLD-Final4/4/20184/6/20184/6/2018ANR
DetailsJim Sly
Steve Phone #: ###-####
Need Electrical final.......When that is verified, You can final BLD permit. Already looked at it.
BLD-Energy code compliance2/2/20182/2/20182/2/2018PPASS
DetailsJim Sly
Steve Phone #: ###-####
BLD-Framing/Rough-in1/30/20181/31/20181/31/2018APASS
DetailsJim Sly
Steve Phone #: ###-####
BLD-Conference1/10/20181/11/20181/11/2018PDONE
DetailsJim Sly
Steve Phone #: ###-####
Issue PAID IN FULL permit  1/9/2018 DONE
Route to Impact Fee Review1/6/20181/9/20181/8/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Inspection Record Card- Bld  1/8/2018 DONE
Permit Ready to Issue  1/8/2018 DONE
Need
GC FORM
Telephone call  1/8/2018 DONE
DetailsChristina Prado
Called Chad tyo advise permit is ready to issue pending GC form and gave fees due
Plan assigned to (CDM)12/21/201712/21/20171/6/2018 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK12/21/2017 1/6/2018 PASS
DetailsCarl D Madsen
1st review completed  1/6/2018 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/6/2018 DONE
Case Summary (BLD)  1/6/2018 DONE
Plans ACCEPTED BY PLAN TECH  12/21/2017 DONE
Intake Approval  12/21/2017 PASS
per CDM
Recd Pcfee & Taken To Pln CK  12/21/2017 DONE
Application received 12/21/2017