Third Notice | | 6/16/2018 | 7/10/2018 | | DONE |
|
|
|
mailed 7-11-18
|
Second Notice | | 5/20/2018 | 6/11/2018 | | DONE |
|
|
|
mailed 6-12
|
First Notice | 4/16/2018 | 4/16/2018 | 5/10/2018 | | DONE |
Jim Sly
|
|
|
mailed 5-11-18
|
BLD-Final | 4/16/2018 | 4/16/2018 | 4/16/2018 | P | PASS |
Jim Sly
|
|
|
Steve Phone #: ###-####
|
DOC - Permit Finaled | 4/16/2018 | 4/16/2018 | 4/16/2018 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 4/13/2018 | 4/16/2018 | 4/16/2018 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, smoke detector is stand-alone and not monitored, fire extinguisher is in common area with a current inspection tag. Final life fire safety inspection for area of work complete.
|
BLD-Final | 4/11/2018 | 4/13/2018 | 4/13/2018 | A | NR |
Jim Sly
|
|
|
Steve Phone #: ###-#### OK to final when Fire signs off.
|
FIRE-Final Inspection | 4/11/2018 | 4/12/2018 | 4/12/2018 | A | FAIL |
Troy Cobbley
|
|
|
Missing plans, need annual inspection for the fire extinguisher, need to relocate the smoke alarm to atleast 3' from the bathroom door.
Steve Phone #: ###-####
|
BLD-Final | 4/4/2018 | 4/6/2018 | 4/6/2018 | A | NR |
Jim Sly
|
|
|
Steve Phone #: ###-#### Need Electrical final.......When that is verified, You can final BLD permit. Already looked at it.
|
BLD-Energy code compliance | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | PASS |
Jim Sly
|
|
|
Steve Phone #: ###-####
|
BLD-Framing/Rough-in | 1/30/2018 | 1/31/2018 | 1/31/2018 | A | PASS |
Jim Sly
|
|
|
Steve Phone #: ###-####
|
BLD-Conference | 1/10/2018 | 1/11/2018 | 1/11/2018 | P | DONE |
Jim Sly
|
|
|
Steve Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/9/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/6/2018 | 1/9/2018 | 1/8/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Inspection Record Card- Bld | | | 1/8/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/8/2018 | | DONE |
|
|
|
Need
GC FORM
|
Telephone call | | | 1/8/2018 | | DONE |
Christina Prado
|
|
|
Called Chad tyo advise permit is ready to issue pending GC form and gave fees due
|
Plan assigned to (CDM) | 12/21/2017 | 12/21/2017 | 1/6/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 12/21/2017 | | 1/6/2018 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 1/6/2018 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/6/2018 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/6/2018 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/21/2017 | | DONE |
|
|
|
|
Intake Approval | | | 12/21/2017 | | PASS |
|
|
|
per CDM
|
Recd Pcfee & Taken To Pln CK | | | 12/21/2017 | | DONE |
|
|
|
|
Application received | | 12/21/2017 | | | |
|
|
|
|