Permanent Occupancy | | | 10/22/2019 | | DONE |
|
|
|
|
BLD-Aging Inspection | 10/14/2019 | 10/14/2019 | 10/16/2019 | | PASS |
Jim Storey
|
|
|
|
Zoning Approval | 10/14/2019 | 10/14/2019 | 10/14/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Temporary Occupancy | 9/25/2019 | 12/24/2019 | 9/25/2019 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd temp c of o ext good until 11/15/19
|
Telephone call | | | 9/12/2019 | | DONE |
|
|
|
talked to Bob Miller about the temp c of o expiring-he will take care of it when he gets back in the office on 9-17-16
|
BLD-Aging Inspection | 8/13/2019 | 8/13/2019 | 8/15/2019 | | PASS |
Jim Storey
|
|
|
zoning temp.
|
Temporary Occupancy | 6/14/2019 | 9/12/2019 | 6/14/2019 | | DONE |
Tiffany Carson-Herker
|
|
|
|
BLD-Final | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Jim Storey
|
|
|
issues resolved. re-inspection for Building final Phone #: ###-#### Inspection requested via web by J.C. Murray final ok
|
BLD-Final | 6/11/2019 | 6/12/2019 | 6/12/2019 | P | NR |
Jim Storey
|
|
|
Building final. Phone #: ###-#### Inspection requested via web by J.C. Murray need handrail 12 inches top and bottom// under stair protection.
|
BLD-Final | 6/11/2019 | 6/11/2019 | 6/11/2019 | P | NR |
Jim Storey
|
|
|
Building final. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
PubWorks Occupancy Approval | 6/7/2019 | 6/7/2019 | 6/7/2019 | | DONE |
Tiffany Lowery
|
|
|
Bonding in place for additional drainage installation.
|
PubWorks Temp Occupancy Appr | 6/6/2019 | 6/6/2019 | 6/6/2019 | | DONE |
Mike Sheppard
|
|
|
|
Zoning Approval Temp | 6/3/2019 | 6/3/2019 | 6/3/2019 | | DONE |
Katelyn Menuge
|
|
|
Temporary Occupancy - BND19-00086
|
BLD-Final | 5/30/2019 | 5/31/2019 | 5/31/2019 | P | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by J.C. Murray
|
FIRE-Final Inspection | 5/30/2019 | 5/31/2019 | 5/31/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire al;arm inspection complete, fire extinguishers are placed with current inspection tags, knox box is located by fire sprinkler riser room. Final life fire safety inspection complete, fire alarms must be monitored after occupancy.
Fire / Life ; Safety Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Ceiling Grid Inspection | 2/14/2019 | 2/14/2019 | 2/14/2019 | P | PASS |
Jim Storey
|
|
|
Building B south 12 units. drop ceiling for cover. fire caulking. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Wall cover | 2/1/2019 | 2/1/2019 | 2/1/2019 | P | PASS |
Jim Storey
|
|
|
Building B - north 12 units. drop ceiling for cover, fire caulking. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Energy code compliance | 1/10/2019 | 1/11/2019 | 1/11/2019 | A | PASS |
Mike Jordan
|
|
|
Bld B - south 12 energy, insulation and tenting. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 12/28/2018 | 12/28/2018 | 12/28/2018 | P | PASS |
Jim Storey
|
|
|
Bld B - south 12 fire caulking/ framing Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Energy code compliance | 12/28/2018 | 12/28/2018 | 12/28/2018 | P | PASS |
Jim Storey
|
|
|
Bld -B: north 12 units. insulation and RC Channel Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | PASS |
Jim Storey
|
|
|
Bld B - north 12 unit framing and fire caulking. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 12/6/2018 | 12/7/2018 | 12/7/2018 | P | PASS |
Jim Storey
|
|
|
Bld B - interior framing and fire caulking Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | PASS |
Jim Storey
|
|
|
Bld B - roof truss engineering Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | PART |
Jim Storey
|
|
|
Bld B - roof truss engineering and interior framing. Phone #: ###-#### Inspection requested via web by J.C. Murray no engineering
|
BLD-Framing/Rough-in | 11/12/2018 | 11/13/2018 | 11/13/2018 | A | CANC |
Jim Sly
|
|
|
Bld B rough framing interior, truss engineering . Phone #: ###-#### Inspection requested via web by J.C. Murray Called in wrong Bldg.
|
BLD-Framing/Rough-in | 11/6/2018 | 11/7/2018 | 11/7/2018 | A | PASS |
Jim Storey
|
|
|
Building B. exterior nailing, straps Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 11/1/2018 | 11/2/2018 | 11/2/2018 | A | PASS |
Jim Storey
|
|
|
Bld B; foundation to building anchor bolts, hold downs and titan bolts. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 9/14/2018 | 9/19/2018 | 9/19/2018 | A | PASS |
Jim Storey
|
|
|
slab on grade shear walls, center and south sections.
Building B Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 9/4/2018 | 9/5/2018 | 9/5/2018 | P | PART |
Jim Sly
|
|
|
partial 1st floor shear wall north end. Bld B. Inspection requested via web by J.C. Murray Interior layers.....OK.
|
BLD-Foundation | 7/25/2018 | 7/25/2018 | 7/25/2018 | P | PASS |
Jim Storey
|
|
|
Manual Phone #: ###-####
|
BLD-Footing | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | PASS |
Jim Storey
|
|
|
manuel Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 7/10/2018 | | DONE |
|
|
|
plan mod
|
OVERRIDE | | | 7/3/2018 | | |
|
|
|
|
Plan assigned to (AJS) | 6/26/2018 | 6/26/2018 | 7/3/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - MECHANICAL | 7/2/2018 | | 7/3/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLUMBING | 7/2/2018 | | 7/3/2018 | | CANC |
Adele J Schaffeld-Griffin
|
|
|
|
Permit Ready to Issue | | | 7/3/2018 | | DONE |
|
|
|
PLAN MOD (17-04623, 04624, 4625, 4627, 4628, 4630, 4631)
|
Routing - PLAN CHECK | 7/2/2018 | | 7/2/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
PLAN MOD RELOCATE WAHER/DRYER FROM BATHROOM TO HALLWAY ADD CLOSED DOOR AS NOTED ON APPROVED PLANS 7-2-18**AJS**
|
Plan Modification Accepted | | | 6/26/2018 | | DONE |
|
|
|
started workflow for modification; Type 2 - Relocate the wsher/dryer from the bathroom to the hallway. Add pocket door to bedroom closet. Type 2-HC - Add pocket door to bedroom closet. Type 5 - Relocate the washer dryer from the bathroom to the hallway and reconfigure bathroom. Type 5-HC - Remove closet adjacent to kitchen counter.
|
Issue PAID IN FULL permit | | | 5/16/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/16/2018 | | DONE |
|
|
|
|
Expiration Notice | 5/15/2018 | 6/5/2018 | 5/15/2018 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 5/2/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 5/2/2018 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Plan assigned to (AJS) | 1/9/2018 | 1/9/2018 | 5/1/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Skyline Apartments
|
Routing - PLAN CHECK | 5/1/2018 | | 5/1/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 5/1/2018 | | 5/1/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2018 | | DONE |
|
|
|
|
Routing - Design Review | 4/2/2018 | | 4/2/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Route to Impact Fee Review | 2/12/2018 | 2/15/2018 | 2/13/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLUMBING | 1/9/2018 | | 2/13/2018 | | PASS |
Bill VanDegrift
|
|
|
|
Routing - PLAN CHECK | 1/9/2018 | | 2/12/2018 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 1/9/2018 | | 2/12/2018 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 2/12/2018 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Sewer Design | 1/9/2018 | | 1/25/2018 | | PASS |
Mike Sheppard
|
|
|
Sewer plans have not been approved
approval per ePlan
|
Routing - Erosion and Sediment | 1/9/2018 | | 1/23/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Petra needs to designate their own RP. Site preparation inspection required. See also ESC17-01754
|
Routing - FIRE | 1/9/2018 | 1/9/2018 | 1/10/2018 | | PASS |
Scott Arellano
|
|
|
See Fire Code plan review comments previously approved under BLD15-03954.
|
Routing - MECHANICAL | 1/9/2018 | | 1/10/2018 | | PASS |
Troy James
|
|
|
|
Routing PW Sewer Rating | 1/9/2018 | | 1/10/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLANNING | 1/9/2018 | | 1/10/2018 | | PASS |
Nicolette Womack
|
|
|
Required to provide 192 bicycle spaces.
|
Routing - Addressing | 1/9/2018 | | 1/9/2018 | | PASS |
Doug Chausow
|
|
|
Address: 2120 S Hudson Ave
|
Routing - PUBLIC WORKS | 1/9/2018 | | 1/9/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 1/9/2018 | | 1/9/2018 | | FAIL |
Katelyn Menuge
|
|
|
Corrections to landscape and light pole locations required.
|
Intake Approval | | | 1/9/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Solid Waste | 1/9/2018 | | 1/9/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Drainage | 1/9/2018 | | 1/9/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 1/9/2018 | | 1/9/2018 | | PASS |
Tom Marshall
|
|
|
|
Application received | | | 12/22/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 22 2017 11:30AM
|
First Notice | | 11/1/2019 | | | |
|
|
|
|