Permanent Occupancy | | | 10/22/2019 | | DONE |
|
|
|
|
Zoning Approval | 10/14/2019 | 10/14/2019 | 10/14/2019 | | PASS |
Katelyn Menuge
|
|
|
|
BLD-Aging Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 | | PASS |
Jim Storey
|
|
|
|
Temporary Occupancy | 9/25/2019 | 12/24/2019 | 9/25/2019 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd temp c of o ext good until 11/15/19
|
Telephone call | | | 9/12/2019 | | DONE |
|
|
|
talked to Bob Miller about the temp c of o expiring-he will take care of it when he gets back in the office on 9-17-16
|
BLD-Aging Inspection | 8/6/2019 | 8/6/2019 | 8/6/2019 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | PASS |
Jim Storey
|
|
|
Building Final Phone #: ###-#### Inspection requested via web by J.C. Murray
|
Temporary Occupancy | 6/7/2019 | 9/5/2019 | 6/7/2019 | | DONE |
Judith Amador
|
|
|
|
Temporary Occupancy | 6/7/2019 | 9/5/2019 | 6/7/2019 | | DONE |
Judith Amador
|
|
|
|
Temporary Occupancy | 6/7/2019 | 9/5/2019 | 6/7/2019 | | DONE |
Judith Amador
|
|
|
|
PubWorks Occupancy Approval | 6/7/2019 | 6/7/2019 | 6/7/2019 | | DONE |
Tiffany Lowery
|
|
|
Bonding in place for additional drainage requirements.
|
PubWorks Temp Occupancy Appr | 6/6/2019 | 6/6/2019 | 6/6/2019 | | DONE |
Mike Sheppard
|
|
|
|
Zoning Approval Temp | 6/3/2019 | 6/3/2019 | 6/3/2019 | | DONE |
Katelyn Menuge
|
|
|
Temporary Occupancy - BND19-00086
|
BLD-Final | 5/30/2019 | 5/31/2019 | 5/31/2019 | P | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by J.C. Murray
|
FIRE-Final Inspection | 5/30/2019 | 5/31/2019 | 5/31/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire al;arm inspection complete, fire extinguishers are placed with current inspection tags, knox box is located by fire sprinkler riser room. Final life fire safety inspection complete, fire alarms must be monitored after occupancy.
Fire / Life ; Safety Phone #: ###-#### Inspection requested via web by J.C. Murray
|
FIRE-Final Inspection | 5/9/2019 | 5/10/2019 | 5/10/2019 | A | CANC |
Troy Cobbley
|
|
|
Not ready for life safety. Still need sprinkler final and paving has not been started yet for fire dept access. Bld C - FIRE / LIFE ; SAFETY re-inspection patched sprinkler holes Phone #: ###-#### Inspection requested via web by J.C. Murray
|
FIRE-Final Inspection | 5/8/2019 | 5/9/2019 | 5/9/2019 | A | CANC |
Troy Cobbley
|
|
|
Not ready for final. Need the project related fire sprinkler permit finaled and ceiling repaired prior to an inspection
Bld C - FIRE / LIFE ; SAFETY Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Ceiling Grid Inspection | 1/14/2019 | 1/15/2019 | 1/15/2019 | P | PASS |
Jim Storey
|
|
|
Bld C; south 12 units, drop ceilings for cover. fire caulking Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Wall cover | 12/28/2018 | 12/28/2018 | 12/28/2018 | P | PASS |
Jim Storey
|
|
|
Bld C - drop ceilings for cover, B-Units Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Ceiling Grid Inspection | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | PASS |
Jim Storey
|
|
|
Bld C - D-Units, north 6. ceiling grid for cover drop ceilings. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Other | 12/11/2018 | 12/12/2018 | 12/12/2018 | A | PASS |
Mike Jordan
|
|
|
rc channel // clint Phone #: ###-####. RC channel for floor ceilng assemblies and corridor.
|
BLD-Energy code compliance | 12/6/2018 | 12/7/2018 | 12/7/2018 | P | PASS |
Jim Storey
|
|
|
Bld C - south 12. B-Units and D-Units. all three floors. insulation for cover. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 12/4/2018 | 12/5/2018 | 12/5/2018 | P | PASS |
Jim Storey
|
|
|
Bld C - south units B and D. south 12 for fire caulking and framing. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 12/4/2018 | 12/4/2018 | 12/4/2018 | P | DEFR |
Jim Storey
|
|
|
Bld C - south units B and D. south 12 for fire caulking and framing. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Jim Storey
|
|
|
Bld C - north B-Units recheck on fire caulking in furnace cavities. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Energy code compliance | 11/30/2018 | 11/30/2018 | 11/30/2018 | P | PASS |
Jim Storey
|
|
|
Bld C - north B-Units 1st, 2nd, 3rd floors 6 Units Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 11/28/2018 | 11/29/2018 | 11/29/2018 | A | NR |
Jim Storey
|
|
|
revised Bld C inspection for North (6) B-Units framing and fire caulking. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 11/27/2018 | 11/28/2018 | 11/28/2018 | P | CANC |
Jim Storey
|
|
|
Bld C - interior framing/ fire caulking B-Units and south D-Units Phone #: ###-#### Inspection requested via web by J.C. Murray north b 6 units ok to insulate.
|
BLD-Framing/Rough-in | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | PASS |
Jim Storey
|
|
|
Bld C- roof truss engineering Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | DEFR |
Jim Storey
|
|
|
Bld C- roof truss engineering and interior framing. Phone #: ###-#### Inspection requested via web by J.C. Murray no plans
|
BLD-Framing/Rough-in | 10/16/2018 | 10/16/2018 | 10/16/2018 | P | PASS |
Jim Storey
|
|
|
exterior shear nailing and strapping Building C Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 9/20/2018 | 9/21/2018 | 9/21/2018 | A | PART |
Brandon Shaw
|
|
|
Perimeter anchor bolts and hold downs.
|
BLD-Energy code compliance | 8/7/2018 | 8/8/2018 | 8/8/2018 | P | PASS |
Jim Storey
|
|
|
Building C - foundation insulation and vapor barrier Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Foundation | 7/13/2018 | 7/13/2018 | 7/13/2018 | P | PASS |
Jim Storey
|
|
|
WALL // Manny Phone #: ###-####
|
BLD-Footing | 7/10/2018 | 7/10/2018 | 7/10/2018 | P | PASS |
Jim Storey
|
|
|
JC Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 7/10/2018 | | DONE |
|
|
|
plan mod
|
Plan assigned to (AJS) | 6/26/2018 | 6/26/2018 | 7/3/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - MECHANICAL | 7/2/2018 | | 7/3/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLUMBING | 7/2/2018 | | 7/3/2018 | | CANC |
Adele J Schaffeld-Griffin
|
|
|
|
Permit Ready to Issue | | | 7/3/2018 | | DONE |
|
|
|
PLAN MOD (17-04623, 04624, 4625, 4627, 4628, 4630, 4631)
|
Routing - PLAN CHECK | 7/2/2018 | | 7/2/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
PLAN MOD RELOCATE WAHER/DRYER FROM BATHROOM TO HALLWAY ADD CLOSED DOOR AS NOTED ON APPROVED PLANS 7-2-18**AJS**
|
Plan Modification Accepted | | | 6/26/2018 | | DONE |
|
|
|
started workflow for modification; Type 2 - Relocate the wsher/dryer from the bathroom to the hallway. Add pocket door to bedroom closet. Type 2-HC - Add pocket door to bedroom closet. Type 5 - Relocate the washer dryer from the bathroom to the hallway and reconfigure bathroom. Type 5-HC - Remove closet adjacent to kitchen counter.
|
Issue PAID IN FULL permit | | | 5/16/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/16/2018 | | DONE |
|
|
|
|
Expiration Notice | 5/15/2018 | 6/5/2018 | 5/15/2018 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 5/2/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 5/2/2018 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Plan assigned to (AJS) | 1/9/2018 | 1/9/2018 | 5/1/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Skyline Apartments
|
Routing - PLAN CHECK | 5/1/2018 | | 5/1/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 5/1/2018 | | 5/1/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2018 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Design Review | 4/2/2018 | | 4/2/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Route to Impact Fee Review | 2/12/2018 | 2/15/2018 | 2/13/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLUMBING | 1/9/2018 | | 2/13/2018 | | PASS |
Bill VanDegrift
|
|
|
|
Routing - PLAN CHECK | 1/9/2018 | | 2/12/2018 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 1/9/2018 | | 2/12/2018 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 2/12/2018 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Sewer Design | 1/9/2018 | | 1/25/2018 | | PASS |
Mike Sheppard
|
|
|
Sewer plans have not been approved
approval per ePlan
|
Routing - Erosion and Sediment | 1/9/2018 | | 1/23/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Petra needs to designate their own RP. Site preparation inspection required. See also ESC17-01754
|
Routing - FIRE | 1/9/2018 | 1/9/2018 | 1/10/2018 | | PASS |
Scott Arellano
|
|
|
See fire code comments attached to BLD15-03955. Previously approved.
|
Routing - MECHANICAL | 1/9/2018 | | 1/10/2018 | | PASS |
Troy James
|
|
|
|
Routing PW Sewer Rating | 1/9/2018 | | 1/10/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLANNING | 1/9/2018 | | 1/10/2018 | | PASS |
Nicolette Womack
|
|
|
Required to provide 192 bicycle spaces.
|
Routing - Addressing | 1/9/2018 | | 1/9/2018 | | PASS |
Doug Chausow
|
|
|
Address: 2090 S Hudson Ave
|
Routing - PUBLIC WORKS | 1/9/2018 | | 1/9/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 1/9/2018 | | 1/9/2018 | | FAIL |
Katelyn Menuge
|
|
|
Corrections to landscape and light pole locations required.
|
Intake Approval | | | 1/9/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Solid Waste | 1/9/2018 | | 1/9/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Drainage | 1/9/2018 | | 1/9/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 1/9/2018 | | 1/9/2018 | | PASS |
Tom Marshall
|
|
|
|
Application received | | | 12/22/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 22 2017 11:30AM
|
First Notice | | 11/1/2019 | | | |
|
|
|
|