BLD-Final | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | PASS |
Jim Storey
|
|
|
Building Final Phone #: ###-#### Inspection requested via web by J.C. Murray
|
PubWorks Occupancy Approval | 6/7/2019 | 6/7/2019 | 6/7/2019 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 6/7/2019 | | DONE |
|
|
|
|
PubWorks Temp Occupancy Appr | 6/6/2019 | 6/6/2019 | 6/6/2019 | | DONE |
Mike Sheppard
|
|
|
|
BLD-Final | 5/30/2019 | 5/31/2019 | 5/31/2019 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by J.C. Murray perm final ok
|
FIRE-Final Inspection | 5/30/2019 | 5/31/2019 | 5/31/2019 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection completed 01APRIL2019.
Fire / Life ; safety Phone #: ###-#### Inspection requested via web by J.C. Murray
|
Zoning Approval | 5/28/2019 | 5/28/2019 | 5/28/2019 | | PASS |
Katelyn Menuge
|
|
|
FINAL
|
BLD-Final | 4/1/2019 | 4/1/2019 | 4/1/2019 | P | PASS |
Jim Storey
|
|
|
Mechanical (Jack) Inspection did not get set for morning. He will be first after lunch. Phone #: ###-#### Inspection requested via web by J.C. Murray tco pending others for final perm
|
BLD-Final | 3/29/2019 | 4/1/2019 | 4/1/2019 | A | CANC |
Jim Storey
|
|
|
Bld D TCO Phone #: ###-#### >> Inspection requested via web by J.C. Murray Inspection cancelled from web by: J.C. Murray
|
FIRE-Final Inspection | 3/29/2019 | 4/1/2019 | 4/1/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire al;arm inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete, fire alarms must be monitored after occupancy.
fire, Life ; Safety Phone #: ###-#### Inspection requested via web by J.C. Murray
|
FIRE-Final Inspection | 3/28/2019 | 3/29/2019 | 3/29/2019 | A | CANC |
Jim Page
|
|
|
Fire sprinkler ispection is scheduled for 01APR2019, this inspection will be rescheduled to coincide with fire sprinkler final, this request is cancelled per conversation with poiunt of contact.
Fire, life ; Safety Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Final | 3/28/2019 | 3/29/2019 | 3/29/2019 | P | CANC |
Tony Young
|
|
|
Structural TCO Phone #: ###-#### Inspection requested via web by J.C. Murray// canc. per JC
|
Zoning Approval Temp | 3/29/2019 | 3/29/2019 | 3/29/2019 | | PASS |
Katelyn Menuge
|
|
|
Temp Occupancy for leasing office/model unit in Building D.
Bond under BND19-00054.
|
FIRE-Final Inspection | 3/27/2019 | 3/28/2019 | 3/28/2019 | A | CANC |
Jim Page
|
|
|
Fire sprinkler did not pass inspection, this request cancelled per conversation with point of contact.
fire , Life ; Safety. fire sprinkler is scheduled for tomorrow am. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
FIRE-Final Inspection | 3/26/2019 | 3/27/2019 | 3/27/2019 | P | CANC |
Jim Page
|
|
|
FIR permits for fire sprinkler (1 permit for overhead and 1 permit for undergorund) and fire alarm need to be finaled before life fire safety inspection can be completed, this request is cancelled and life fire safety inspection will need to be scheduled to coincide with fire alarm and fire sprinkler inspection.
Fire, Life ; Safety Inspection Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Conference | 3/26/2019 | 3/27/2019 | 3/27/2019 | A | PASS |
Jim Storey
|
|
|
preliminary consult for TCO thank you. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
PubWorks Temp Occupancy Appr | 3/27/2019 | 3/27/2019 | 3/27/2019 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Wall cover | 12/6/2018 | 12/12/2018 | 12/12/2018 | P | DONE |
Jim Sly
|
|
|
Bld D - drop ceilings for cover 3rd floor. Phone #: ###-#### Inspection requested via web by J.C. Murray 2nd and 3rd floor.......OK
|
BLD-Wall cover | 12/7/2018 | 12/11/2018 | 12/11/2018 | P | PASS |
Mike Jordan
|
|
|
Bld D - drop ceilings for cover. Phone #: ###-#### Inspection requested via web by J.C. Murray. 1st floor only ok.
|
BLD-Wall cover | 12/6/2018 | 12/7/2018 | 12/7/2018 | P | NR |
Jim Storey
|
|
|
Bld D - drop ceilings for cover. 1st and 2nd floors. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Energy code compliance | 11/16/2018 | 11/16/2018 | 11/16/2018 | P | PASS |
Jim Storey
|
|
|
Bld C - north (6) D-Units; 1st floor, 2nd floor, 3rd floor Phone #: ###-#### Inspection requested via web by J.C. Murray insulation , rc channel and framing ok
|
BLD-Framing/Rough-in | 11/15/2018 | 11/16/2018 | 11/16/2018 | A | PASS |
Jim Storey
|
|
|
missed the 11:30 cut off Bld C - interior framing and fire caulking North D-Units (6) Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Energy code compliance | 11/1/2018 | 11/2/2018 | 11/2/2018 | A | PASS |
Jim Storey
|
|
|
Bld D; RC Channel north side 6 units. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Energy code compliance | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | PASS |
Jim Storey
|
|
|
Bld D - completion energy code inspection, 1 hr. comments. Phone #: ###-#### Inspection requested via web by J.C. Murray 6 south units ok insulation and rc chammel/
|
BLD-Energy code compliance | 10/29/2018 | 10/30/2018 | 10/30/2018 | P | PART |
Mike Jordan
|
|
|
building D, insulation and vapor barriers. gypcrete under tubs. Phone #: ###-#### Inspection requested via web by J.C. Murray. Noted furred areas behind tub/shower at ceiling has not been pre rocked. Also noted possible non rated low voltage boxes that have been installed. no one from petra on site and no awnser on phone call. Insulation, vapor barrier and gyp crete under tubs ok.
|
BLD-Framing/Rough-in | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Jim Storey
|
|
|
framing structural complete. exterior nailing, trusses . missing straps. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 9/14/2018 | 9/17/2018 | 9/17/2018 | A | NH |
Brandon Shaw
|
|
|
Gate locked, no one on site
|
BLD-Framing/Rough-in | 9/6/2018 | 9/7/2018 | 9/7/2018 | P | NR |
Jim Storey
|
|
|
Bld D - exterior strapping and nailing. interior hold downs and plate bolting. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Framing/Rough-in | 9/4/2018 | 9/6/2018 | 9/6/2018 | P | PART |
Jim Storey
|
|
|
Bld D - exterior strapping and nailing. interior hold downs and plate bolting. Phone #: ###-#### Inspection requested via web by J.C. Murray 3 straps and interior bolts wip/
|
BLD-Framing/Rough-in | 8/15/2018 | 8/16/2018 | 8/16/2018 | P | PASS |
Jim Storey
|
|
|
Bld C - interior shear wall nailing inspection. Phone #: ###-#### Inspection requested via web by J.C. Murray interior 1st floor pass
|
BLD-Framing/Rough-in | 8/1/2018 | 8/2/2018 | 8/2/2018 | A | PASS |
Jim Storey
|
|
|
1st floor partition shear wall building D Phone #: ###-#### Inspection requested via web by J.C. Murray center interior only.
|
BLD-Energy code compliance | 7/25/2018 | 7/25/2018 | 7/25/2018 | P | PASS |
Jim Storey
|
|
|
foundation insulation and slab vapor barrier for Building D. Phone #: ###-#### Inspection requested via web by J.C. Murray
|
BLD-Foundation | 7/5/2018 | 7/6/2018 | 7/6/2018 | A | PASS |
Jim Storey
|
|
|
Manuel Phone #: ###-####
|
BLD-Footing | 7/2/2018 | 7/2/2018 | 7/2/2018 | P | PASS |
Brandon Shaw
|
|
|
Building D
|
Issue PAID IN FULL permit | | | 5/16/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/16/2018 | | DONE |
|
|
|
|
Expiration Notice | 5/15/2018 | 6/5/2018 | 5/15/2018 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 5/2/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 5/2/2018 | | DONE |
Christina Prado
|
|
|
All met
|
Plan assigned to (AJS) | 1/9/2018 | 1/9/2018 | 5/1/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Skyline Apartments
|
Routing - PLAN CHECK | 5/1/2018 | | 5/1/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 5/1/2018 | | 5/1/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2018 | | DONE |
|
|
|
|
Routing - Design Review | 4/2/2018 | | 4/2/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Route to Impact Fee Review | 2/12/2018 | 2/15/2018 | 2/13/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLUMBING | 1/9/2018 | | 2/13/2018 | | PASS |
Bill VanDegrift
|
|
|
|
Routing PW Drainage | 1/9/2018 | | 2/13/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 1/9/2018 | | 2/12/2018 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 1/9/2018 | | 2/12/2018 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 2/12/2018 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Sewer Design | 1/9/2018 | | 1/25/2018 | | PASS |
Mike Sheppard
|
|
|
Sewer plans have not been approved
approval per ePlan
|
Routing - Erosion and Sediment | 1/9/2018 | | 1/23/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Petra needs to designate their own RP. Site preparation inspection required. See also ESC17-01754
|
Routing - FIRE | 1/9/2018 | 1/9/2018 | 1/10/2018 | | PASS |
Scott Arellano
|
|
|
See Fire Code plan review comments previously approved under BLD15-03956.
|
Routing - MECHANICAL | 1/9/2018 | | 1/10/2018 | | PASS |
Troy James
|
|
|
|
Routing PW Sewer Rating | 1/9/2018 | | 1/10/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLANNING | 1/9/2018 | | 1/10/2018 | | PASS |
Nicolette Womack
|
|
|
Required to provide 192 bicycle spaces.
|
Routing - Addressing | 1/9/2018 | | 1/9/2018 | | PASS |
Doug Chausow
|
|
|
Address 2010 S Hudson Ave
|
Routing - PUBLIC WORKS | 1/9/2018 | | 1/9/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 1/9/2018 | | 1/9/2018 | | FAIL |
Katelyn Menuge
|
|
|
Corrections to landscape and light pole locations required.
|
Intake Approval | | | 1/9/2018 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Solid Waste | 1/9/2018 | | 1/9/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Street Lights | 1/9/2018 | | 1/9/2018 | | PASS |
Tom Marshall
|
|
|
|
Application received | | | 12/22/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 22 2017 11:30AM
|
First Notice | | 6/17/2019 | | | |
|
|
|
|