Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-04627
StatusFinaled
Name PETRA INC
Site Address 2015 S HUDSON AVE
Project NameSkyline Apartments BLDG E
Customer NumberBLD17-04623 IN EPLAN
ePlanReview 
Description
Building E: (SKYLINE APARTMENTS – BUILDING TYPE 2, Building A, B, C, E, G and J) (24 units) PLAN MOD RELOCATE WAHER/DRYER FROM BATHROOM TO HALLWAY ADD CLOSED DOOR AS NOTED ON APPROVED PLANS 7-2-18**AJS**The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. To construct a 25,320 square foot three story VB Type of Construction apartment building (8,458 sq. ft. 1st story and 8,431 sq. ft. 2nd story and 8,431 sq. ft. 3rd story). Each unit is 1 story. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, 1-hr dwelling unit separations, 1 hour fire barriers for stair and breezeways, rated doors in breezeway, interior nonbearing walls, millwork, and finishes. Special Inspection is NOT required. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **ajs**192 unit apartment project with (9) apartment buildings, clubhouse, and associated site work
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  10/22/2019 DONE
BLD-Final10/17/201910/17/201910/17/2019PDONE
DetailsJim Storey
Brian Phone #: ###-####
PubWorks Occupancy Approval10/17/201910/17/201910/17/2019 DONE
DetailsTiffany Lowery
Zoning Approval10/14/201910/14/201910/14/2019 PASS
DetailsKatelyn Menuge
Temporary Occupancy8/29/201911/27/20198/29/2019 DONE
DetailsJudith Amador
PubWorks Temp Occupancy Appr8/29/20198/29/20198/29/2019 PASS
DetailsMike Sheppard
Per Mike ok for Temp occ
Zoning Approval Temp8/29/20198/29/20198/29/2019 PASS
DetailsKatelyn Menuge
Temporary
BLD-Final8/26/20198/27/20198/27/2019PPASS
DetailsJim Storey
call rob building may be locked Phone #: ###-#### Inspection requested via web by J.C. Murray final ok
BLD-Final8/22/20198/23/20198/23/2019APART
DetailsJim Storey
if units are locked when you arrive please call Rob Rhoads ###-####
he has the keys in job site trailer parked in front of building C address 2090 S. Hudson Phone #: ###-#### Inspection requested via web by J.C. Murray
FIRE-Final Inspection8/20/20198/21/20198/21/2019ACANC
DetailsJim Page
Life fire safety inspection for this permit has been completed, this request is cancelled.

building final Phone #: ###-#### Inspection requested via web by J.C. Murray
FIRE-Final Inspection8/16/20198/19/20198/19/2019APASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags, knox box is located by the fire sprinkler riser room. Final life fire safety inspection for area of work complete.

Bld E fire / life ; safety Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Final8/16/20198/19/20198/19/2019PCANC
DetailsJim Storey
Bld E structural final Phone #: ###-#### >> Inspection requested via web by J.C. Murray Inspection cancelled from web by: J.C. Murray
BLD-Wall cover5/9/20195/9/20195/9/2019APASS
DetailsJim Storey
c/n made ok for fire spk penatrations of ceilling.
BLD-Ceiling Grid Inspection5/8/20195/8/20195/8/2019PPART
DetailsBrandon Shaw
Bld E - re-inspection of (2) fire sprinkler caulking at 2nd floor patios. west side building. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Ceiling Grid Inspection5/1/20195/1/20195/1/2019PFAIL
DetailsJim Storey
JC-bldg E west side 12 units, drop ceilings cover, fire caulking Phone #: ###-####
Override - Parcel Holds5/1/20191/1/19005/1/2019  
this is not for the pool
BLD-Energy code compliance4/11/20194/12/20194/12/2019APASS
DetailsJim Storey
insulation inspection Phone #: ###-#### Inspection requested via web by J.C. Murray ok to cover
BLD-Ceiling Grid Inspection4/8/20194/9/20194/9/2019APASS
DetailsJim Storey
Bld E - east 12 units . drop ceilings for cover. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Ceiling Grid Inspection4/3/20194/4/20194/4/2019PNR
DetailsJim Storey
Bld E - east 12 units drop ceilings for cover. fire caulking. Phone #: ###-#### Inspection requested via web by J.C. Murray pending mech
BLD-Energy code compliance3/12/20193/13/20193/13/2019APART
DetailsBrandon Shaw
W side of Building E...
BLD-Energy code compliance3/7/20193/8/20193/8/2019PPASS
DetailsJim Storey
building E - east half insulation and vapor barrier. Phone #: ###-#### Inspection requested via web by J.C. Murray furn heads
BLD-Wall cover3/7/20193/7/20193/7/2019PPASS
DetailsJim Storey
Building E. framed walls for cover - fire caulking. Phone #: ###-#### Inspection requested via web by J.C. Murray gyp at ceilling furn patch/ spk
BLD-Framing/Rough-in12/28/201812/28/201812/28/2018PPASS
DetailsJim Storey
Bld E - roof trusses and engineering Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Wall cover12/11/201812/14/201812/14/2018PPASS
DetailsJim Sly
wall straps // clint Phone #: ###-####
Straps, Titen bolts, hold downs and Exterior shear nailing appears OK.
BLD-Framing/Rough-in11/15/201811/16/201811/16/2018APASS
DetailsJim Storey
missed the 11:30 cut off
Bld E - 1st floor interior shear walls. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Framing/Rough-in10/1/201810/2/201810/2/2018PPASS
DetailsJim Storey
1st floor interior shear walls, Building E. Phone #: ###-#### Inspection requested via web by J.C. Murray
BLD-Foundation7/30/20187/30/20187/30/2018PPASS
DetailsJim Storey
manuel Phone #: ###-####
BLD-Footing7/26/20187/26/20187/26/2018PPASS
DetailsDave Hannah
Manjaul Phone #: ###-####
CHANGE STATUS TO (ISS)  7/10/2018 DONE
plan mod
OVERRIDE  7/3/2018  
Plan assigned to (AJS)6/26/20186/26/20187/3/2018 PASS
DetailsAdele J Schaffeld-Griffin
Routing - MECHANICAL7/2/2018 7/3/2018 PASS
DetailsAdele J Schaffeld-Griffin
Routing - PLUMBING7/2/2018 7/3/2018 CANC
DetailsAdele J Schaffeld-Griffin
Permit Ready to Issue  7/3/2018 DONE
PLAN MOD (17-04623, 04624, 4625, 4627, 4628, 4630, 4631)
Routing - PLAN CHECK7/2/2018 7/2/2018 PASS
DetailsAdele J Schaffeld-Griffin
PLAN MOD RELOCATE WAHER/DRYER FROM BATHROOM TO HALLWAY ADD CLOSED DOOR AS NOTED ON APPROVED PLANS 7-2-18**AJS**
Plan Modification Accepted  6/26/2018 DONE
started workflow for modification; Type 2 - Relocate the wsher/dryer from the bathroom to the hallway. Add pocket door to bedroom closet. Type 2-HC - Add pocket door to bedroom closet. Type 5 - Relocate the washer dryer from the bathroom to the hallway and reconfigure bathroom. Type 5-HC - Remove closet adjacent to kitchen counter.
Issue PAID IN FULL permit  5/16/2018 DONE
Print Occupancy Form  5/16/2018 DONE
Expiration Notice5/15/20186/5/20185/15/2018 DONE
DetailsBrittany Hill
OVERRIDE  5/2/2018  
Permit Ready to Issue  5/2/2018 DONE
DetailsChristina Prado
All met
Plan assigned to (AJS)1/9/20181/9/20185/1/2018 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed Skyline Apartments
Routing - PLAN CHECK5/1/2018 5/1/2018 PASS
DetailsAdele J Schaffeld-Griffin
Routing Off Site - STRUCTURAL5/1/2018 5/1/2018 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  5/1/2018 DONE
Routing - Design Review4/2/2018 4/2/2018 PASS
DetailsKatelyn Menuge
Route to Impact Fee Review2/12/20182/15/20182/13/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLUMBING1/9/2018 2/13/2018 PASS
DetailsBill VanDegrift
Routing - PLAN CHECK1/9/2018 2/12/2018 FAIL
DetailsAdele J Schaffeld-Griffin
Routing Off Site - STRUCTURAL1/9/2018 2/12/2018 FAIL
DetailsAdele J Schaffeld-Griffin
1st review completed  2/12/2018 FAIL
DetailsAdele J Schaffeld-Griffin
Routing PW Sewer Design1/9/2018 1/25/2018 PASS
DetailsMike Sheppard
Sewer plans have not been approved

approval per ePlan
Routing - Erosion and Sediment1/9/2018 1/23/2018 PASS
DetailsAndy J. Long
ESC plan approved. Petra needs to designate their own RP. Site preparation inspection required. See also ESC17-01754
Routing - FIRE1/9/20181/9/20181/10/2018 PASS
DetailsScott Arellano
See Fire Code comments attached under previously approved BLD15-03957.
Routing - MECHANICAL1/9/2018 1/10/2018 PASS
DetailsTroy James
Routing PW Sewer Rating1/9/2018 1/10/2018 PASS
DetailsMorgan Webb
Routing - PLANNING1/9/2018 1/10/2018 PASS
DetailsNicolette Womack
Required to provide 192 bicycle spaces.
Routing - Addressing1/9/2018 1/9/2018 PASS
DetailsDoug Chausow
Address: 2015 S Hudson Ave
Routing - PUBLIC WORKS1/9/2018 1/9/2018 PASS
DetailsRachael Beierle
Routing - Design Review1/9/2018 1/9/2018 FAIL
DetailsKatelyn Menuge
Corrections to landscape and light pole locations required.
Intake Approval  1/9/2018 PASS
DetailsAdele J Schaffeld-Griffin
Routing PW Solid Waste1/9/2018 1/9/2018 PASS
DetailsEvan Carpenter
Routing PW Drainage1/9/2018 1/9/2018 PASS
DetailsBrian Murphy
Routing PW Street Lights1/9/2018 1/9/2018 PASS
DetailsTom Marshall
Application received  12/22/2017 DONE
Application submitted via PDS Online on Dec 22 2017 11:30AM
First Notice 11/1/2019