Permit NumberBLD17-04633
StatusFinaled
Name DAYSTAR EXCAVATION
Site Address 4495 S CURTIS RD
Project NameBoise Transfer Station
Customer Number 
ePlanReviewNo
Description
(BOISE TRANSFER STATION - ANCHOR REPAIR) Permit for anchor repairs at the existing transfer station building. Approval per approved plans on file and attached engineering. All repair work to be per the engineering design plans and the attached engineering. this is a repair permit only no fire life safety inspection required. Note: NO special inspection is required per engineer of record Adam B. Drinkwalter **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice2/16/20182/16/20183/14/2018 DONE
DetailsJim Storey
Mailed 3-15-18
BLD-Final2/15/20182/16/20182/16/2018APASS
DetailsJim Storey
Lewis Dean Phone #: ###-####
DOC - Permit Finaled2/16/20182/16/20182/16/2018PPASS
DetailsJim Storey
BLD-Other1/29/20181/30/20181/30/2018APART
DetailsMike Jordan
late am please // anchors and rebar insp // Lynn Phone #: ###-####. Work in progress on drilling the top anchors for epoxy on modifiaction, Engineer of record to inspect epoxy doweling.
Issue PAID IN FULL permit  1/17/2018 DONE
Telephone call  1/11/2018 DONE
Left a message for Jake informing him that this permit is ready, we need the GC to fill out the 302 and 306 for and then we will be able to put in the rest of the fees.
Route to Impact Fee Review1/10/20181/13/20181/10/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan assigned to (JG)12/22/201712/22/20171/10/2018 PASS
DetailsJavier Guzman
1/04 L2 Boise Tranfer Station paper
Routing - PLAN CHECK12/22/2017 1/10/2018 FAIL
DetailsJavier Guzman
pend enginering request for special inspection
Routing Off Site - STRUCTURAL12/22/2017 1/10/2018 PASS
DetailsJavier Guzman
Signed off by AHJ engineer Dave Haugland see attached email
1st review completed  1/10/2018 FAIL
DetailsJavier Guzman
Case Summary (BLD)  1/10/2018 DONE
DetailsJavier Guzman
Routing - PLAN CHECK1/10/2018 1/10/2018 PASS
DetailsJavier Guzman
Plan Reviewer's activity  1/10/2018 DONE
DetailsJavier Guzman
Called Adam the engineer of record asking if there is an enginering request for special inspection
Plan Reviewer's activity  1/10/2018 DONE
DetailsJavier Guzman
Per phone conversation with Adam B. Dirnkwalter the engineer of record there is no need for special inspections (1-10-2018)
PLANS/APPL TAKEN TO FRONT DESK  1/10/2018 DONE
Case Summary (BLD)  1/10/2018 DONE
DetailsJavier Guzman
Permit Ready to Issue  1/10/2018 DONE
NEED
GC
Rev cert of val
Inspection Record Card- Bld  1/10/2018 DONE
Telephone call  12/22/2017 DONE
called courier for pick up for outside engineering review
Intake Approval  12/22/2017 PASS
per JG
Plans ACCEPTED BY PLAN TECH  12/22/2017 DONE
Recd Pcfee & Taken To Pln CK  12/22/2017 DONE
Application received 12/22/2017