Permit NumberBLD17-04644
StatusFinaled
Name BOGIES IDAHO LLC
Site Address 1124 W FRONT ST
Project NameBoise Art Glass / Fire Fusion
Customer Number 
ePlanReviewYes
Description
(BOISE ART GLASS / FIRE FUSION – STAIRWAY REMOVAL AND STORAGE ROOM) The fire sprinkler system is used for story increase. To remove a 2nd story stairway, construct a wall infill on the 2nd story, create a storage area on the 1st story for hazardous materials with a new exterior door to the alley, and to make the new door at the alley available to serve only the new storage area. The work is within an existing 8,613 square foot tenant space (5,806 square foot 1st story, a 181 square foot mezzanine, and a 2,626 square foot 2nd story). Some work is being done to resolve corrections required by the Boise City Fire Department regarding hazardous materials. The storage area is not a 1-hr control area so it is not required to be enclosed by interior walls and doors having a fire-resistance-rating. The quantities of hazardous materials within this building are not allowed to exceed the exempt quantities per control area as allowed by the 2012 IFC. An occupant load sign is required to be posted limiting the maximum occupant load of the North 2nd story egress area to 29. Emergency lights and an exit sign are required to serve that area as part of an approved code alternate. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 5/31/20185/21/2018 DONE
Permanent Occupancy  5/21/2018 DONE
BLD-Final5/17/20185/17/20185/17/2018PPASS
DetailsJim Storey
Laura Phone #: ###-#### opt 2
BLD-Final4/24/20184/25/20184/26/2018ANR
DetailsDave Hannah
Laura Lockwood--they open at 10 am Phone #: ###-#### opt 2
BLD-Final4/4/20184/5/20184/6/2018ACANC
DetailsDave Hannah
after 10pm- Laura Phone #: ###-#### op 2 needs to fix gaurd railing
FIRE-Final Inspection4/4/20184/4/20184/4/2018PPASS
DetailsJim Page
No fire sprinkler modifications, address associated fire alarm inspection complete (FIR17-00191), fire extinguishers are in place with current inspection tags, knox box is located by main entry on the soutwest side of building. Final life fire safety inspection complete.
BLD-Final3/27/20183/28/20183/28/2018PNR
DetailsDave Hannah
laura opt.2 Phone #: ###-####
FIRE-Final Inspection3/27/20183/28/20183/28/2018ACANC
DetailsJim Page
There is a fire alarm permit associated with this property that has not been inspected or finaled, final inspection for FIR17-00191 will need to be completed and finaled before life fire safety inspection can be completed for this permit. A voicemail was left at Phone #: ###-#### about the fire alarm permit issue, this request is cancelled.
Print Occupancy Form  2/15/2018 DONE
Issue PAID IN FULL permit  2/15/2018 DONE
Route to Impact Fee Review1/24/20181/27/20181/25/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE1/24/20181/24/20181/25/2018 PASS
DetailsScott Arellano
Attached revised comments to case
Plan assigned to (CJW)12/29/201712/29/20171/25/2018 PASS
DetailsCarl Westfall
x (1st done) (Jan 11 - 10 days) (4 sheets) L2 Boise Art Glass / Fire Fusion ePlan
PLANS/APPL TAKEN TO FRONT DESK  1/25/2018 DONE
Permit Ready to Issue  1/25/2018 DONE
Need
GC Form
Revised Cert of Value
1st review completed  1/25/2018 DONE
Routing - PLAN CHECK12/29/2017 1/24/2018 PASS
DetailsCarl Westfall
1st IBC plan review completed and approved.
Routing - FIRE12/29/201712/29/20171/10/2018 FAIL
DetailsScott Arellano
Attached comments to case and emailed architect
Telephone call  1/8/2018  
Called Dwayne to schedule review with him on RDP proposed conditions of approval of building permit.
Routing - Addressing12/29/2017 1/2/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS12/29/2017 1/2/2018 PASS
DetailsMorgan Webb
Routing - Design Review12/29/2017 1/2/2018 PASS
DetailsKatelyn Menuge
Intake Approval  12/29/2017 PASS
DetailsJavier Guzman
Application received  12/26/2017 DONE
Application submitted via PDS Online on Dec 26 2017 9:24AM
Intake Approval  12/26/2017 FAIL
DetailsMichael Hanson
This permit has failed prescreen due to the following:
1. Missing door and hardware schedule
2. Missing wall bracing detail