Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD17-04648
StatusIssued
Name BECK CONSTRUCTION INC
Site Address 1424 N ORCHARD ST
Project NameThe Masonry Center
Customer Number 
ePlanReviewYes
Description
(MASONRY CENTER) //3-25-2020 PLAN MODIFICATION TO REDUCE SELECT WORK ITEMS AND REMOVE IMPROVEMENTS FROM BACK OF HOUSE AREA FROM THE ORIGINAL SCOPE OF WORK. jg // Permit is to remodel an existing 8,184 sq. ft. retail area within an existing 24,303 sq. ft. retail/warehouse building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select suspended ceiling, removal of select millwork, construction of interior non-bearing walls to create offices, display areas, a reception area and a warehouse demising wall, select new door/door frames, accessible Hi/Lo drinking fountain, select new suspended acoustic and gypsum ceiling, select new and relocation of existing light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/30/20206/30/20206/30/2020PPASS
DetailsTell Riley
final appears to be complete per the updated plans for the plan modification//all other trades are complete//no card onsite to sign//
BLD-Final6/29/20206/30/20206/30/2020ACANC
DetailsTell Riley
For access please call Gary, 30 minutes prior to arrival, @ ###-####. Thanks! Phone #: ###-#### Inspection requested via web by Gary Beck//unable to make contact with Gary, called and left VM with no response//two other calls went straight to voicemail//
BLD-Final6/19/20206/19/20206/19/2020PNR
DetailsTell Riley
For building access, please call Jon Jackson @ ###-#### thirty minutes prior to arrival. Thanks! Phone #: ###-#### Inspection requested via web by Gary Beck//plans show no changes to restrooms//restrooms appear to have been updated//need to provide confiramtion of bathrroms, if remodeled need to provide plan mod//
FIRE-Final Inspection6/16/20206/17/20206/17/2020APASS
DetailsTroy Cobbley
Life safety passed.

For building access please call Karl Miller 30 minutes prior to arrival @ ###-#### Phone #: ###-#### Inspection requested via web by Gary Beck
FIRE-Final Inspection6/4/20206/4/20206/4/2020PFAIL
DetailsTroy Cobbley
Need plans and small documents.

For access, call Karl Miller @ ###-#### twenty minutes before arrival. Phone #: ###-#### Inspection requested via web by Gary Beck
CHANGE STATUS TO (ISS)  4/23/2020 DONE
Permit Ready to Issue  4/2/2020 DONE
**PLAN MOD - DO NOT REISSUE**
Plan assigned to (JG)3/20/20203/20/20204/1/2020 PASS
DetailsJavier Guzman
03/31 plan mod The Masonry Center ePlan
Routing - PLAN CHECK3/24/2020 4/1/2020 PASS
DetailsJavier Guzman
Routing - PUBLIC WORKS3/25/2020 3/25/2020 PASS
DetailsMorgan Webb
NO NEW MODIFICATION FOR PLUMBING FIXTURES
Plan Modification Accepted  3/20/2020 DONE
Mark Hirshi submitted plan mod request. Reducing the scope of work for the project
BLD-Wall cover1/26/20181/26/20181/26/2018PPASS
DetailsJim Sly
Partial for framing and wall cover. Please call Gary 30 min before arrival to review. Thanks. Phone #: ###-#### Inspection requested via web by Gary Beck
BLD-Framing/Rough-in1/26/20181/26/20181/26/2018PPASS
DetailsJim Sly
Partial for framing and wall cover. Please call 30 min before arrival to review. Thanks. Phone #: ###-#### Inspection requested via web by Gary Beck
Permit Ready to Issue  1/22/2018 DONE
Need
Revised Cert of Value
Print Occupancy Form  1/22/2018 DONE
Issue PAID IN FULL permit  1/22/2018 DONE
Plan assigned to (JG)12/27/201712/27/20171/20/2018 PASS
DetailsJavier Guzman
1st rev comp, 1/09 L2 The Masonry Center Showroom ePlan call Carl ###-#### when ready
Routing - PLAN CHECK1/17/2018 1/20/2018 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  1/20/2018 DONE
Route to Impact Fee Review1/11/20181/14/20181/11/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK12/27/2017 1/11/2018 FAIL
DetailsJavier Guzman
1st review completed  1/11/2018 DONE
DetailsJavier Guzman
Routing - FIRE12/27/201712/27/201712/29/2017 PASS
DetailsScott Arellano
Attached comments to case
Intake Approval  12/27/2017 PASS
DetailsJavier Guzman
Routing - Addressing12/27/2017 12/27/2017 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS12/27/2017 12/27/2017 PASS
DetailsRachael Beierle
Application received  12/26/2017 DONE
Application submitted via PDS Online on Dec 26 2017 3:52PM