FIRE-Final Inspection | 4/28/2020 | 4/28/2020 | 4/28/2020 | P | CANC |
Jim Page
|
|
|
Life fire safety inspection was completed on 16APR2020, see notes entered during that inspection, nmo follow up inspection required for life fire safety, this request is cancelled.
Call For Access - Ben Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 4/17/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 4/16/2020 | | |
|
|
|
|
OVERRIDE | | | 4/16/2020 | | |
|
|
|
|
FIRE-Final Inspection | 4/15/2020 | 4/16/2020 | 4/16/2020 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, no fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags. Permit was in "Under Review" staus at time of inspection, per Conversation with Julie Romig, life fire safety inspection could be performed with what was on-site. Final life fire safety inspection is complete, signature provided on permit sign off card.
Call ahead for Access - Ben - permit currently in revision. Inspection for consultation Phone #: ###-####
|
Plan assigned to (JAR) | 4/15/2020 | 4/15/2020 | 4/16/2020 | | DONE |
Julie Romig
|
|
|
Plan Mod - 2777 W Broadway
|
Routing - PLAN CHECK | 4/16/2020 | | 4/16/2020 | | PASS |
Julie Romig
|
|
|
|
Routing - Addressing | 4/16/2020 | | 4/16/2020 | | PASS |
Doug Chausow
|
|
|
|
Permit Ready to Issue | | | 4/16/2020 | | DONE |
|
|
|
plan mod met
|
FIRE-Final Inspection | 4/13/2020 | 4/15/2020 | 4/15/2020 | A | FAIL |
Troy Cobbley
|
|
|
I called the contact phone number and left message that I would be there at 8am. I arrived but no one was here and building is locked. I noted the address on the Howard Street side is missing, fire extinguishers are not mounted and are placed on the floor, exit signs do not appear to have power. These items were noted by view through the windows.
Benjamin Phone #: ###-####
|
Plan Modification Accepted | | | 4/15/2020 | | DONE |
|
|
|
Plan mod to update tenant name, change in floor plan
|
BLD-Final | 4/9/2020 | 4/10/2020 | 4/10/2020 | A | NR |
Jim Storey
|
|
|
screened - Benjamin Phone #: ###-#### need sign offs.
|
Print Occupancy Form | | | 4/10/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/10/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/10/2020 | | DONE |
|
|
|
|
BLD-Aging Inspection | 2/5/2020 | 2/5/2020 | 2/5/2020 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Energy code compliance | 9/24/2019 | 9/24/2019 | 9/24/2019 | P | PASS |
Jim Storey
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | PART |
Jim Storey
|
|
|
Eric Phone #: ###-#### fire blk at stairs/ada backing// plm ri// ok to insulate.
|
BLD-Wall Bracing | 5/9/2019 | 5/9/2019 | 5/9/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Wall Bracing | 5/9/2019 | 5/9/2019 | 5/9/2019 | P | NR |
Jim Storey
|
|
|
|
BLD-Foundation | 1/14/2019 | 1/15/2019 | 1/15/2019 | A | PASS |
Jim Storey
|
|
|
Eric-stem wall Phone #: ###-####
|
BLD-Footing | 1/2/2019 | 1/3/2019 | 1/3/2019 | A | PASS |
Jim Storey
|
|
|
Eric Phone #: ###-#### exterior ft ok
|
(F) Reprint permit | | | 11/20/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/19/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/19/2018 | | DONE |
|
|
|
|
Place hold on job | 5/2/2018 | | 11/19/2018 | | DONE |
Brittany Hill
|
|
|
DO NOT ISSUE WITHOUT GRD18-00009(has been issued) & BLD17-04684 (must split up value between building permits)
|
Case Summary (BLD) | | | 10/19/2018 | | DONE |
|
|
|
|
Extend Review Timeline | | | 6/25/2018 | | DONE |
|
|
|
1st Approved 180 day extension per Adele. See documents
|
Meeting | | | 6/19/2018 | | DONE |
|
|
|
EXTENSION REQUEST SENT IN
|
Expiration Notice | 6/4/2018 | 6/25/2018 | 6/4/2018 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 5/2/2018 | | |
|
|
|
|
Plan assigned to (JAR) | 1/16/2018 | 1/16/2018 | 5/2/2018 | | DONE |
Julie Romig
|
|
|
*1st Rev Comp - 3rd Rec'd - 502 Broadway Office Building Shell
|
Routing PW Sewer Design | 4/30/2018 | | 5/2/2018 | | PASS |
DeAnn Brown
|
|
|
|
Routing - MECHANICAL | 5/1/2018 | | 5/2/2018 | | PASS |
Troy James
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/2/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/2/2018 | | DONE |
|
|
|
NEED
ACHD (see attached email)(cant issue without ACHD approval/impact fees)
DO NOT ISSUE WITHOUT BLD17-04684
RP-MET
GC FORM-met
REVISED VALUE-met
|
Routing PW Drainage | 4/12/2018 | | 5/1/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 4/30/2018 | | 5/1/2018 | | PASS |
Julie Romig
|
|
|
|
Routing PW Sewer Design | 4/12/2018 | | 4/23/2018 | | FAIL |
DeAnn Brown
|
|
|
Saddle taps are not allowed. ADS pipe is not appropriate for direct bury. Invert and manhole rim elevations appear incorrect per datum NAVD88. Please refer to changemarks in eplanreview and revise.
|
Routing - Erosion and Sediment | 4/12/2018 | | 4/20/2018 | | PASS |
Michael Zawacki
|
|
|
RP needed before ground disturbing activities begin.
|
Routing - PLAN CHECK | 4/12/2018 | | 4/20/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing Off Site - STRUCTURAL | 4/12/2018 | | 4/18/2018 | | PASS |
Julie Romig
|
|
|
2nd Review
|
Routing - PLANNING | 4/12/2018 | | 4/17/2018 | | PASS |
Celine Acord
|
|
|
per CUP16-00078 and CVA16-00059
|
Route to Impact Fee Review | 3/15/2018 | 3/18/2018 | 3/16/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 3/15/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 1/16/2018 | | 3/15/2018 | | FAIL |
Julie Romig
|
|
|
Corrections required per ePlanReview
|
Routing PW Environmental | 1/17/2018 | | 1/29/2018 | | PASS |
Rick Christenson
|
|
|
please review attached ti for art studio c/o
|
Routing PW Sewer Design | 1/17/2018 | | 1/26/2018 | | FAIL |
Mike Sheppard
|
|
|
Revise plan to intall an Inserta-Tee for the 4-inch sewer connection.
|
Routing Off Site - STRUCTURAL | 1/16/2018 | | 1/26/2018 | | FAIL |
Julie Romig
|
|
|
Corrections required per ePlanReview
|
Routing PW Drainage | 1/17/2018 | | 1/26/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 1/16/2018 | 1/16/2018 | 1/18/2018 | | PASS |
Scott Arellano
|
|
|
Attached comments to case
|
Routing - Erosion and Sediment | 1/16/2018 | | 1/18/2018 | | FAIL |
Michael Zawacki
|
|
|
No ESCP narrative provided. Plan sheet L45 does not work for narrative.
|
Routing PW Street Lights | 1/17/2018 | | 1/18/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Solid Waste | 1/17/2018 | | 1/18/2018 | | PASS |
Evan Carpenter
|
|
|
Approved for commercial solid waste cart service.
|
Plan Reviewer's activity | | | 1/18/2018 | | DONE |
Julie Romig
|
|
|
Failed planning - need site plan. Route to Celine Accord for resubmittal review.
|
Routing - MECHANICAL | 1/16/2018 | | 1/18/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 1/16/2018 | | 1/17/2018 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing - PLANNING | 1/16/2018 | | 1/17/2018 | | FAIL |
Leon Letson
|
|
|
Failed per ePlanReview
|
Routing - Addressing | 1/16/2018 | | 1/17/2018 | | PASS |
Doug Chausow
|
|
|
Address: 2227 S Broadway Ave
|
Routing - PUBLIC WORKS | 1/16/2018 | | 1/17/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 1/16/2018 | | 1/16/2018 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 1/16/2018 | | PASS |
|
|
|
|
Application received | | | 12/27/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 27 2017 10:52AM
|