Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberBLD17-04652
StatusFinaled
Name SUNRISE DEVELOPMENT LLC
Site Address 3332 E ECHO CT
Project NameL6B8 Boulder heights
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 3,609 sq. ft., (above grade 3,609 sq. ft., below grade story 615 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 132 sq. ft. of covered patio/porch and a 1,100-sq. ft. attached garage per the approved plans and any notations. R-1A/DA zoning and setbacks per planning. MDH. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor 208-608-7171.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Jason Taylor 208-608-7171.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection11/21/201811/21/201811/21/2018 PASS
DetailsBrandon Shaw
DOC - Permit Finaled11/21/201811/21/201811/21/2018PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval9/20/20189/20/20189/20/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Final9/13/20189/13/20189/13/2018PNR
DetailsBrandon Shaw
The roof storm drainage system must be inspected by Public Works.
BLD-Wall Bracing7/10/20187/10/20187/10/2018PPASS
DetailsBrandon Shaw
shear // Justin Phone #: ###-####
BLD-Energy code compliance7/2/20187/3/20187/3/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by justin reynolds
BLD-Framing/Rough-in6/29/20186/29/20186/29/2018PPASS
DetailsBrandon Shaw
OK to insulate
BLD-Wall Bracing6/21/20186/22/20186/22/2018APART
DetailsJim Sly
Justin Phone #: ###-####
Exterior nailing only.......OK.
BLD-Other5/24/20185/25/20185/25/2018APASS
DetailsBrandon Shaw
Work in progress
BLD-Foundation2/20/20182/21/20182/21/2018APASS
DetailsBrandon Shaw
Work in progress

Frost protection required
BLD-Footing2/16/20182/16/20182/16/2018PPASS
DetailsBrandon Shaw
Work in progress

Frost protection required
PubWorks Subgrade Approval2/16/20182/16/20182/16/2018 DONE
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
OVERRIDE  1/17/2018  
Inspection Record Card- Bld  1/17/2018 DONE
Telephone call  1/17/2018 DONE
DetailsChristina Prado
Called Kristine to advise permit is ready and gave fees due
Issue PAID IN FULL permit  1/17/2018 DONE
Plan resubmittals received  1/17/2018 DONE
received two copies of engineering letter and plan sheets A0.0, A2.0, A3.0, A3.1, S1.0, S1.1, S4.0, S4.1, S5.1, SD1.0, SP100; taken to Michael Hanson
Routing - PLAN CHECK1/17/2018 1/17/2018 PASS
DetailsMichael Hanson
Case Summary (BLD)  1/17/2018 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  1/17/2018 DONE
DetailsMichael Hanson
Permit Ready to Issue  1/17/2018 DONE
Plan assigned to (M_H)1/5/2018 1/17/2018 DONE
DetailsMichael Hanson
1/17 sfd L2 paper - Plan review completed 01/11. Sent to fire. MDH Received from fire, sent to ESC 01/12. MDH
RTA - wall bracing, structural, and egress requirements. 01/16 MDH
Routing - PLAN CHECK1/12/2018 1/16/2018 FAIL
DetailsMichael Hanson
RTA - wall bracing, structural, and egress requirements. MDH
1st review completed  1/16/2018 FAIL
DetailsMichael Hanson
RTA - wall bracing, structural, and egress requirements. MDH
Routing - FIRE1/11/20181/12/20181/12/2018 PASS
DetailsErika Akin
Plans were reviewed for FD access, availability of hydrants and defensible space.
Routing - Erosion and Sediment1/12/2018 1/12/2018 PASS
DetailsAndy J. Long
ESC plan with narrative and site map approved. Certified RP and PD designated. Site preparation inspection is required.
Plan Reviewer's activity  1/11/2018 FAIL
DetailsMichael Hanson
Provide plan review with 4 issues to resolve. 1/11 MDH
Routing PW Grading-Hillside1/8/2018 1/8/2018 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Jason Taylor ###-####.
Routing - PUBLIC WORKS1/8/2018 1/8/2018 PASS
DetailsMorgan Webb
Plan assigned to (BJM)12/28/2017 1/5/2018 DEFR
DetailsBrian McGowan
1/17 sfd L2 paper
Routing - MECHANICAL  1/3/2018 PASS
Plan resubmittals received  1/2/2018 DONE
1 copy of Site Grading and drainage plan and 3 copies of Geotechnical report addendum stamped and taken to Brian M.
Taken to JCT 1/2/18
Route to Impact Fee Review12/28/201712/31/201712/29/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing PW Grading-Hillside12/28/2017 12/29/2017 FAIL
DetailsJason C. Taylor
I will need to following before I can process your hillside application:
1. Extra copy of grading plan from RiveRidge Engineering as required on checklist.
2. 3 copies of the additional MTI Geotechnical Report Addendums that were issued in December.
Routing - PLANNING12/29/2017 12/29/2017 PASS
DetailsNicolette Womack
Routing - PUBLIC WORKS12/28/2017 12/29/2017 FAIL
DetailsMorgan Webb
SEE HILLSIDE FOR FAIL
Plans ACCEPTED BY PLAN TECH  12/28/2017 DONE
Recd Pcfee & Taken To Pln CK  12/28/2017 DONE
Intake Approval  12/28/2017 PASS
Routing - Addressing12/28/2017 12/28/2017 PASS
DetailsDoug Chausow
Application received 12/27/2017