First Notice | | 4/7/2018 | 4/10/2018 | | DONE |
|
|
|
mailed 4-11-18
|
Zoning Approval | 3/28/2018 | 3/28/2018 | 3/28/2018 | | DONE |
Andrea Tuning
|
|
|
|
Permanent Occupancy | | | 3/28/2018 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 3/22/2018 | 3/22/2018 | 3/22/2018 | P | PASS |
Jim Sly
|
|
|
Dennis Phone #: ###-####
|
FIRE-Final Inspection | 3/21/2018 | 3/22/2018 | 3/22/2018 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
Dennis Phone #: ###-####
|
BLD-Framing/Rough-in | 3/6/2018 | 3/6/2018 | 3/6/2018 | P | PART |
Jim Sly
|
|
|
Denis Phone #: ###-#### Most of framing completed.....just have couple of doors to cut in or fill in.
|
(F) Reprint permit | | | 2/23/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/23/2018 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 2/21/2018 | 2/22/2018 | 2/22/2018 | P | PART |
Jim Sly
|
|
|
Dennis-wall that was framed near front door-inspection is not for anything that has to do with the plan mod that is in for review Phone #: ###-####
|
Route to Impact Fee Review | 2/21/2018 | 2/24/2018 | 2/22/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (RMH) | 2/21/2018 | 2/21/2018 | 2/22/2018 | | PASS |
Ron Hill
|
|
|
|
Routing - PLAN CHECK | 2/22/2018 | | 2/22/2018 | | PASS |
Ron Hill
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/22/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/22/2018 | | DONE |
|
|
|
DO NOT RE ISSUE-plan mod ready to issue once fees are paid
|
Plan Modification Accepted | | | 2/21/2018 | | DONE |
Christina Prado
|
|
|
Plan Mod to a interior windows, stoarge room and remove @breakroom to office to open space
|
Issue PAID IN FULL permit | | | 2/15/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/15/2018 | | DONE |
|
|
|
|
Routing - FIRE | 2/7/2018 | 2/7/2018 | 2/13/2018 | | PASS |
Scott Arellano
|
|
|
Attached comments to case
|
Plan assigned to (RMH) | 2/7/2018 | 2/7/2018 | 2/13/2018 | | PASS |
Ron Hill
|
|
|
|
1st review completed | | | 2/13/2018 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/13/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/13/2018 | | DONE |
|
|
|
NEED
GC
Rev Cert of Val
|
Routing - PLAN CHECK | 2/7/2018 | | 2/13/2018 | | PASS |
Ron Hill
|
|
|
|
Plan assigned to (JG) | 2/7/2018 | 2/7/2018 | 2/7/2018 | | DEFR |
Javier Guzman
|
|
|
L2 Debt Reduction Services ePlan*
|
Intake Approval | | | 2/7/2018 | | PASS |
Javier Guzman
|
|
|
|
Routing - Design Review | 2/7/2018 | | 2/7/2018 | | PASS |
Andrea Tuning
|
|
|
|
Routing - Addressing | 2/7/2018 | | 2/7/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/7/2018 | | 2/7/2018 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 1/16/2018 | | FAIL |
Rob Patrick
|
|
|
1/16/18 Please Provide the Following:
1. All drawings must be Stamped and Signed by responsible professional.
Thank you
|
Intake Approval | | | 1/3/2018 | | FAIL |
Rob Patrick
|
|
|
1/3/18 Please Provide the Following:
1. Zoning Certificate must submitted.
2. All drawings must be Stamped and Signed by responsible professional.
Thank you
Rob Patrick
|
Application received | | | 12/28/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 28 2017 1:11PM
|
Intake Approval | | | 12/28/2017 | | FAIL |
Rob Patrick
|
|
|
12/28/17 Please provide the following:
A Zoning Certificate will be required for this project. Please contact Sarah Schafer at ###-####. She will be able to walk you through the process.
Thank you
Rob Patrick
|