Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberBLD17-04685
StatusIssued
Name GUHO CORP
Site Address 780 W MAIN ST
Project NameCapitol Terrace Phase One
Customer Number 
ePlanReviewYes
Description
(CAPITOL TERRRACE EXTERIOR IMPROVEMENTS) /// 09/08/18 PLAN MODIFICATION TO REMOVE EXISTING MECHANICAL LOUVERS AND REPLACE WITH NEW LOUVERS AND MODIFY TRANSITION TO DUCTWORK. JAR /// **Permit for upgrades to the building facade. Work to include: demolition of exterior finishes; new permanent canopies on 1st and 2nd floors; new architectural feature over 8th street building entry; new guardrails; new electrical; relocated vents; new roof drainage; new exterior finishes and paint. Special inspections required per attached Form 310. This is a scope of work permit only with a certificate of completion to be issued upon completion and approval of the project. The fire sprinkler system is used for high rise provisions. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/16/201811/19/201811/20/2018APASS
DetailsDave Hannah
Tom Phone #: ###-#### ok after zoning finals
Zoning Approval11/20/201811/20/201811/20/2018 DONE
DetailsAndrea Tuning
Letter of compliance/Occupancy  11/20/2018 DONE
FIRE-Final Inspection11/15/201811/16/201811/16/2018APASS
DetailsJim Page
Fire sprinkler inspection is complete, no fire alarm modifications for this project, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete.

Tom Phone #: ###-####
BLD-Final11/13/201811/14/201811/14/2018ANR
DetailsDave Hannah
Tom Phone #: ###-####
BLD-Framing/Rough-in9/11/20189/12/20189/12/2018APASS
DetailsDave Hannah
Tom Phone #: ###-####
OVERRIDE  9/10/2018  
CHANGE STATUS TO (ISS)  9/10/2018 DONE
Inspection Record Card- Bld  9/10/2018 DONE
(F) Reprint permit  9/10/2018 DONE
Permit Ready to Issue  9/10/2018 DONE
PLAN MOD
Plan assigned to (JAR)8/28/20188/28/20189/8/2018 DONE
DetailsJulie Romig
09/10 - Plan Mod - Capitol Terrace Facade Improvements
Routing - PLAN CHECK9/4/2018 9/8/2018 PASS
DetailsJulie Romig
Routing - Design Review9/4/2018 9/4/2018 PASS
DetailsAndrea Tuning
BLD-Framing/Rough-in8/28/20188/29/20188/29/2018APART
DetailsDave Hannah
Tom Phone #: ###-####
Plan Modification Accepted  8/28/2018 DONE
Plan Mod - As part of the replacement of the exterior canopies some existing intake louvers will need to be moved. At Taphouse the existing louvers will be removed and replaced with louvers that match the new paint color and design. These new louvers will require minor modifications to the existing interior transition ductwork as shown on details.
BLD-Framing/Rough-in7/20/20187/23/20187/24/2018APASS
DetailsDave Hannah
Tom Phone #: ###-####
BLD-Framing/Rough-in7/11/20187/13/20187/13/2018APASS
DetailsDave Hannah
Tom Phone #: ###-#### ok to south end
Issue PAID IN FULL permit  5/17/2018 DONE
Inspection Record Card- Bld  5/17/2018 DONE
OVERRIDE  4/25/2018  
Plan assigned to (JAR)1/22/20181/22/20184/25/2018 DONE
DetailsJulie Romig
1st Rev Comp - 2nd Comp - L3 Capitol Terrace Canopy Additions
Routing - PLAN CHECK4/25/2018 4/25/2018 PASS
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  4/25/2018 DONE
Permit Ready to Issue  4/25/2018 DONE
Need- all met
GC Form
Revised Cert of Value
RP-MET
ACHD-MET
Routing Off Site - STRUCTURAL3/19/2018 3/29/2018 PASS
DetailsJulie Romig
Routing - PLAN CHECK3/22/2018 3/22/2018 FAIL
DetailsJulie Romig
Need verification of ACHD/CCDC agreements.
Routing - PLUMBING3/21/2018 3/21/2018 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - Design Review3/19/2018 3/19/2018 PASS
DetailsAndrea Tuning
Routing - Erosion and Sediment1/22/2018 3/19/2018 PASS
DetailsMichael Zawacki
Waiver request approved. On site manager responsible for following actions listed in waiver request.
Route to Impact Fee Review3/7/20183/10/20183/8/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  3/7/2018 FAIL
DetailsJulie Romig
Routing - PLAN CHECK1/22/2018 3/7/2018 FAIL
DetailsJulie Romig
Routing - Addressing1/22/2018 3/6/2018 PASS
DetailsDoug Chausow
Routing Off Site - STRUCTURAL1/22/2018 1/31/2018 FAIL
DetailsJulie Romig
Routing - PLUMBING1/22/2018 1/25/2018 FAIL
DetailsBill VanDegrift
ISPC table 1101b- minimum horizontal rain water piping is 3".
Routing - FIRE1/22/20181/22/20181/24/2018 PASS
DetailsErika Akin
Attached comments to case
Routing PW Street Lights1/23/2018 1/24/2018 PASS
DetailsTom Marshall
Routing PW Drainage1/23/2018 1/23/2018 PASS
DetailsBrian Murphy
Routing PW Solid Waste1/23/2018 1/23/2018 PASS
DetailsEvan Carpenter
Routing - PUBLIC WORKS1/22/2018 1/23/2018 PASS
DetailsRachael Beierle
Routing - Design Review1/22/2018 1/23/2018 FAIL
DetailsAndrea Tuning
The proposed building materials do not match the Design Review approval.
Intake Approval  1/22/2018 PASS
DetailsAdele J Schaffeld-Griffin
Julie accepted pre screen
Plan Reviewer's activity  1/19/2018 DONE
DetailsJulie Romig
Application is a 520 Major TI for exterior improvements to an existing buidling, not a 502 new construction.
Application received  12/29/2017 DONE
Application submitted via PDS Online on Dec 29 2017 8:49AM