BLD-Final | 1/15/2019 | 1/15/2019 | 1/15/2019 | P | PASS |
Brandon Shaw
|
|
|
Andria Phone #: ###-####
|
DOC - Permit Finaled | 1/15/2019 | 1/15/2019 | 1/15/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 1/15/2019 | 1/15/2019 | 1/15/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.5
|
BLD-Energy code compliance | 9/7/2018 | 9/7/2018 | 9/7/2018 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Andrina Davis
|
BLD-Framing/Rough-in | 8/31/2018 | 8/31/2018 | 8/31/2018 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Andrina Davis,, needs seal package,, ok to insulate,, will verify at energy code inspection
|
CHANGE STATUS TO (ISS) | | | 8/27/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/27/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/27/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/27/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 8/24/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 7/26/2018 | 7/26/2018 | 8/24/2018 | | DONE |
Brian McGowan
|
|
|
Plan Mod - to alter interior floor plan, non-bearing walls, door location and roof entry
|
Routing - PLAN CHECK | 7/27/2018 | | 8/24/2018 | | PASS |
Brian McGowan
|
|
|
Plan Mod - to alter interior floor plan, non-bearing walls, door location and roof entry by adding a false dormer
|
Plan Reviewer's activity | | | 8/24/2018 | | DONE |
Brian McGowan
|
|
|
Please add 1/2 hour of Plan Check for the Plan Mod Review.
|
Permit Ready to Issue | | | 8/24/2018 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE
Fees due
|
CHANGE STATUS TO (REV) | | | 7/26/2018 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 7/26/2018 | | DONE |
|
|
|
Plan Mod - to alter interior floor plan, non-bearing walls, door location and roof entry
|
BLD-Footing | 5/22/2018 | 5/23/2018 | 5/23/2018 | A | PASS |
Brandon Shaw
|
|
|
Paul Phone #: ###-####
|
BLD-Footing | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | NR |
Tony Young
|
|
|
Andrina Phone #: ###-####
|
Issue PAID IN FULL permit | | | 1/16/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/16/2018 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 1/12/2018 | | DONE |
Brian McGowan
|
|
|
Andrina provided engineering for tall walls at the Entry for this home.
|
OVERRIDE | | | 1/10/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 12/29/2017 | 12/29/2017 | 1/10/2018 | | DONE |
Brian McGowan
|
|
|
1/12 sfd L1 ePlan
|
Routing - PLAN CHECK | 12/29/2017 | | 1/10/2018 | | PASS |
Brian McGowan
|
|
|
|
Routing - PUBLIC WORKS | 12/29/2017 | | 1/10/2018 | | PASS |
Morgan Webb
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 1/10/2018 | | DONE |
|
|
|
met
|
1st review completed | | | 1/9/2018 | | DONE |
Brian McGowan
|
|
|
Emailed PW and Addressing to sign off in Tidemark.
|
Routing - Addressing | 12/29/2017 | | 1/9/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - MECHANICAL | 12/29/2017 | | 1/8/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 12/29/2017 | 1/1/2018 | 1/2/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Application received | | | 12/29/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 29 2017 10:35AM
|
Plans ACCEPTED BY PLAN TECH | | | 12/29/2017 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/29/2017 | | DONE |
|
|
|
|
Intake Approval | | | 12/29/2017 | | PASS |
|
|
|
|
Routing - PLANNING | 12/29/2017 | | 12/29/2017 | | PASS |
Sue Cummings
|
|
|
|