BLD-Final | 4/23/2018 | 4/25/2018 | 4/25/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Yates
|
DOC - Permit Finaled | 4/25/2018 | 4/25/2018 | 4/25/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 3/12/2018 | 3/13/2018 | 3/13/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Yates
|
BLD-Framing/Rough-in | 3/12/2018 | 3/13/2018 | 3/13/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Yates
|
BLD-Framing/Rough-in | 3/9/2018 | 3/9/2018 | 3/9/2018 | P | FAIL |
Mike Jordan
|
|
|
Phil Phone #: ###-####. Install the 1/2 inch anchor bolts on bearing wall in garage. Install the additional SDS screws in the 2x12 ledger. Complete foam seal on plumbing penetrations. Correction notice posted. Ok to insulate.
|
BLD-Framing/Rough-in | 3/7/2018 | 3/8/2018 | 3/8/2018 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Yates. Needs plumbing rough in inspection, and provide truss engineering.
|
Application received | | 1/5/2018 | 2/23/2018 | | DONE |
|
|
|
|
Routing PW Sewer Design | 2/23/2018 | | 2/23/2018 | | PASS |
Mike Sheppard
|
|
|
|
BLD-Wall Bracing | 2/20/2018 | 2/21/2018 | 2/21/2018 | A | PASS |
Mike Jordan
|
|
|
Shear // Louse Phone #: ###-####
|
BLD-Foundation | 1/28/2018 | 1/29/2018 | 1/29/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Footing | 1/25/2018 | 1/26/2018 | 1/26/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
Issue PAID IN FULL permit | | | 1/19/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 1/16/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 1/11/2018 | 1/11/2018 | 1/16/2018 | | DONE |
Rob Patrick
|
|
|
|
1st review completed | | | 1/16/2018 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 1/16/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/16/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 1/16/2018 | | DONE |
Christina Prado
|
|
|
ALL MET
|
Inspection Record Card- Bld | | | 1/16/2018 | | DONE |
|
|
|
|
Telephone call | | | 1/16/2018 | | DONE |
Christina Prado
|
|
|
Called Tom to advise permit is ready and gave fees due
|
Routing - PLAN CHECK | 1/14/2018 | | 1/16/2018 | | PASS |
Rob Patrick
|
|
|
|
Routing - MECHANICAL | | | 1/11/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 1/5/2018 | | 1/11/2018 | | PASS |
Colleen T Carroll
|
|
|
|
Plan assigned to (RDP) | 1/5/2018 | 1/5/2018 | 1/5/2018 | | DEFR |
Rob Patrick
|
|
|
1/16 sfd L1 paper
|
Routing - Addressing | 1/5/2018 | | 1/5/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | | | 1/5/2018 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/5/2018 | | DONE |
|
|
|
|
Intake Approval | | | 1/5/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/5/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/5/2018 | 1/6/2018 | 1/4/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Telephone call | | | 1/3/2018 | | DONE |
|
|
|
called Thomas to let know we need a letter is they're requesting the plans be reviewed under the 2012 IRC-he asked that i email him the request-plans are on Candy's desk waiting for the letter required for the 2012 IRC review
|