BLD-Final | 10/3/2018 | 10/4/2018 | 10/4/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Braxton Hansen
|
DOC - Permit Finaled | 10/4/2018 | 10/4/2018 | 10/4/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 10/4/2018 | 10/4/2018 | 10/4/2018 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 6
|
BLD-Energy code compliance | 6/27/2018 | 6/27/2018 | 6/27/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Braxton Hansen
|
BLD-Framing/Rough-in | 6/23/2018 | 6/25/2018 | 6/25/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Braxton Hansen
|
BLD-Wall Bracing | 6/7/2018 | 6/8/2018 | 6/8/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Wall Bracing | 6/7/2018 | 6/7/2018 | 6/7/2018 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Braxton Hansen
|
BLD-Foundation | 3/2/2018 | 3/5/2018 | 3/5/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
BLD-Footing | 3/1/2018 | 3/1/2018 | 3/1/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
Issue PAID IN FULL permit | | | 2/16/2018 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/16/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 2/2/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 1/16/2018 | 1/16/2018 | 2/2/2018 | | DONE |
Brian McGowan
|
|
|
2-2 townhome L2 Eplan
|
Routing - PLAN CHECK | 1/16/2018 | | 2/2/2018 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 2/2/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/2/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/2/2018 | | DONE |
|
|
|
met
|
Routing PW Flood Plain | 1/16/2018 | | 1/24/2018 | | PASS |
Jason C. Taylor
|
|
|
Approved LOMR on File. No floodplain review required. JCT
|
Route to Impact Fee Review | 1/16/2018 | 1/19/2018 | 1/17/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 1/17/2018 | | 1/17/2018 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 1/16/2018 | | 1/17/2018 | | FAIL |
Troy James
|
|
|
emailed corrections
|
Routing - PLANNING | 1/16/2018 | | 1/17/2018 | | PASS |
Katelyn Menuge
|
|
|
DRH17-00173
|
Routing - Addressing | 1/16/2018 | | 1/16/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/16/2018 | | 1/16/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/16/2018 | | DONE |
|
|
|
|
Intake Approval | | | 1/16/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/16/2018 | | DONE |
|
|
|
|
Intake Approval | | | 1/10/2018 | | FAIL |
|
|
|
need 2012 IRC/IBC review request because engineeering is 2012
|
Intake Approval | | | 1/5/2018 | | FAIL |
|
|
|
need letter to request 2012 IRC review and upload approved letter to elpan or update codes to 2015.
Permit for the construction of a new 1,750 sq. ft., two story (first story 385 sq. ft., second story 945 sq. ft. Third Floor 420 sq. ft.) single family dwelling with 3 bedrooms, 3 bathrooms, approximately 47 sq. ft. of covered patio/porch and a 505 sq. ft. attached garage per the approved plans and any notations. SP-02 zoning and setbacks per planning.
|
Application received | | | 1/4/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 4 2018 9:44AM
|